Loading...
HomeMy WebLinkAboutNC0020451_AUTHORIZATION TO CONSTRUCT_20020815MPDES DOCYNEMT SCANNIMS COVER SHEET NPDES Permit: NC0020451 West Jefferson WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (At C) Permit Modification Complete File - Historical Correspondence Instream Assessment (67b) Environmental Assessment (EA) Permit History Document Date: August 15, 2002 TlZie dCPCUJ s.ernt ie prirMted on reuse paper - more arty coimteat ou the reYex-ae eide �1 r1 c clo ,- OL4 5 Mattern & Craig CONSULTING ENGINEERS -SURVEYORS J. Wayne Craig Stewart W. Huhbetl Gene R. Cress Michael S. Agee Steven A. Campbell Randy W Beckner August 15, 2002 _r. Kerr T, Stevens NCDENR, DWQ 1617 Mail Service Center Raleigh, NC 27699-1617 Wm. Thomas AustLn Bradley C. Craig David P. Wilson Edwin K. Mattem, Jr. (1949-1982) Sam H, McGhee, III (Retired) Tipau DEC 2 3 2002 WATER QUALITY SECTION Re: West Jefferson WWTP Expansion SRF Project No. CS 370716-02 Comm. No. 1632B Dear Mr. Stevens: 1, Randy W. Beckner , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe the construction of the project, Wastewater Treatment Plant Expansion, Town of West Jefferson for the Permittee hereby state that, to the .best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit. 1f you have any questions, please feel free to call. Sincere] """" ��` Ttte Dlvli>l of War Quality iby Y' �H CAR '''�. cowl recdpt r w MATTERN & CRA1G saglne�a axtl&�atlon s � p� sEAL 20327 Randy W. Beckner, P.E. , Principal RWB/ppb cc: Greg Edney, Town of West Jefferson 2 3 2�02 �y 12 Broad Street, Asheville, North Ccuolina 28801 t (828)254-2201 Fax(828)254-4562 January 18, 2001 Mr. Greg Edney, Town Manager Town of West Jefferson Post Office Box 490 West Jefferson, North Carolina 28694-0490 Dear Mr. Edney: Vim- Michael F. Easley Governor Sherri Evans -Stanton, Acting Secretary Department of Environment and Natural Resources Kerr T. Stevens Division of Water Quality 4 11 BAN 2 3 2001 DENR - WATER QUALITY POINT SOURCE BRANCH SUBJECT: Permit No. 020451 ACB Authorization to Construct Town of West Jefferson WWTP Expansion Ashe County . SRF Project No. CS370716-02 SRG Project No. E-SRG-T-00-0092 A letter of request for Authorization to Construct was received October 23, 2000 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.369 MGD Town of West Jefferson Wastewater Treatment Plant, with discharge of treated wastewater into an unnamed tributary to Little Buffalo Creek in the New River Basin. This authorization results in an increase in design capacity to 0.5 MGD; however, the permitted capacity has not been increased at this time. Operation beyond 0.369 MGD will not be allowed until the expanded permit has been issued. Authorization is awarded for the construction of the following specific modifications: A 2 foot wide mechanical bar screen with 0.5-inch clear spaces, a 1.5 foot wide manual bar screen bypass channel, chain and bucket grit removal, an influent pump station with three (3) 434 GPM pumps, an influent mag meter, a dual channel concentric oxidation ditch with dual 30 HP rotors, construction of a second 45 foot diameter secondary clarifier with 12 feet of sidewater depth, dual traveling bridge tertiary filters, in -channel ultra violet disinfection with two banks of lamps having a total of 8 lamps, a post aeration basin with diffused air, conversion of an existing aeration basin to aerobic digestion, two (2) 50 HP 890 scfm blowers, two new 521 GPM return sludge pumps with VFD's, a 50 KW standby generator; associated yard pipe, site work and electrical work. ►i 1CjfN_F? Customer Service 1 800 623-7748 Construction Grants & Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 (919) 733-6900 FAX: 919-715-6229 Internet Address: www.negi.net This Authorization to Construct is issued in accordance with Part 1II, Paragraph C of NPDES Permit No. NCO020451 issued November 15, 1995, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0020451. 'QThe-sludge. generated from these treatment facilities must be disposed of in accordance with G.S. 143'-2 f M' and in a manner approved b the North Carolina Division of Water pp y Quality. This Authorization To Construct is issued pursuant to T15A:21-1:0219(p) for the construction of reclaimed water utilization facility without flow equalization at the site of the West Jefferson WWTP. In the event that non-compliance with any condition or limitation contained in permit number WQOO19471 results from the absence of flow equalization, the Town's NPDES permit may be administratively reopened, and a requirement for the construction ofa flow equalization basin may be incorporated into the permit. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336)771-4600, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699- 1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of Title 15A, Chapter 8A, .0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. Sincerely, Kerr T. Stevens Director CGM:pe cc: Mattern & Craig Ashe County Health Department Winston-Salem Regional Office, Water Quality Section Technical Assistance and Certification Unit Daniel Blaisdell, P.E. Dave Goodrich, NPDES Permitting Unit Cecil G. Madden, Jr., P.E. S RI~ SRG