Loading...
HomeMy WebLinkAboutNCG160199_NOV_20200608ROY COOPER Governor MICHAELS.REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality June 8, 2020 CERTIFIED MAIL: 7019 0700 0000 8867 2991 RETURN RECEIPT REQUESTED Hmc Paving & Construction Co Inc. Attn: Mark Fortner 120 Sturken Drive Bryson City, North Carolina 28713 Subject: NOTICE OF VIOLATION (NOV-2020-PC-0287) NPDES Stormwater General Permit NCG160000 Certificate of Coverage NCG160199 HMC Paving & Construction Co. Inc. Swain County Dear Mr. Fortner: On May 29, 2020, Isaiah Reed from the Asheville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the HMC Paving & Construction Co. Inc. facility located at 450 Industrial Park Road, Swain County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG160000 under Certificate of Coverage NCG160199. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Cochran Branch, a Class C waterbody in the Little Tennessee River Basin. As a result of the site inspection, the following permit conditions violation(s) are noted: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has not been developed. 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. DEQ�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 eoenmmio an gMgphl WiI 828.296.4500 Notice of Violation HMC Paving & Construction Co. Inc. June 8, 2020 Page 2 of 2 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations: Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response: You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violation(s) have occurred as well as a Plan of Action to prevent these violation(s) from recurring. Thank you for your attention to this matter. This Office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral & Land Resources regarding these issues. Your above -mentioned response to this correspondence will be considered in this process. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions regarding these matters, please contact Isaiah Reed or myself at (828) 296- 4500. Sincerely, C Stanley E. A' EGn \\ Regional Engineer Land Quality Section Enclosure: Inspection Report ec: Alaina Morman, Environmental Specialist Alaina.morman&ncdenr.eov Stanley E. Aiken- Regional Engineer stan.aikengncdenr.gov Compliance Inspection Report Permit: NOG160199 Effective: 08/01/19 Expiration: 05/31/24 Owner: Hmc Paving & Construction Co Inc SOC: Effective: Expiration: Facility: HMC Paving County: Swain 450 Industrial Park Blvd Region: Asheville Bryson City NC 28713 Contact Person: Sandi Fortner - Title: Phone Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/29/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 02:OOPM Exit Time: 02:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG160199 Owner- Facility: Hmc Paving & Construction Cc Inc Inspection Date: 05/29/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: On May 29, 2020 this facility was inspected for compliance and to determine if adequate progress has been made in response to the previously issued Notice of Deficiency. I met with Craig Fortner on site. During the inspection, the following items were noted: 1) A Stormwater Pollution Prevention Plan was not made available at the time of the inspection. 2) Qualitative and Analytical monitoring data were not made available at the time of the inspection This office has concluded that adequate progress has not been made in response to the previously issues Notice of Deficiency. Please see enclosed Notice of Violation for more information. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG160199 Owner - Facility: Hmc Paving& Construction Co Inc Inspection Date: 05/29/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ M ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ M ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ M ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: A Stormwater Pollution Prevention Plan was not available at the time of the inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Qualitative Monitoring Records were not available at the time of the inspection. Analytical Monitoring Has the facility conducted its Analytical monitoring? Yes No NA NE ❑■❑❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring data was not available at the time of the inspection. Permit and Outfalis Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 1101111 # Were all outfalls observed during the inspection? 1111110 # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3