HomeMy WebLinkAboutWQ0015234_Staff Report_20200602DocuSign Envelope ID: 76258EC3-OCBC-48B8-9A62-2D4E18ED7DCE
State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Environmental Staff Report
Quality
To: ❑ NPDES Unit ® Non -Discharge Unit Application No.: WQ0015234
Attn: Chloe Lloyd Facility name: 490 Shell Hill Rd SFR
From: Helen Perez
Wilmington Regional Office
Note: This form has been adapted from the non -discharge fg acili , staff report to document the review of both non -
discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ❑ Yes or ® No
a. Date of site visit:
b. Site visit conducted by:
c. Inspection report attached? ❑ Yes or ❑ No
d. Person contacted:
e. Driving directions:
2. Discharge Point(s): N/A
Latitude:
Latitude:
and their contact information: (_)
3. Receiving stream or affected surface waters: N/A
Classification:
River Basin and Subbasin No.
Longitude:
Longitude:
- ext.
Describe receiving stream features and pertinent downstream uses:
II. PROPOSED FACILITIES: NEW APPLICATIONS: N/A
1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit)
Proposed flow:
Current permitted flow:
2. Are the new treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No
If no, explain:
3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? ❑ Yes ❑ No ❑ N/A
If no, please explain:
4. Do the plans and site map represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ❑ N/A
If no, please explain:
5. Is the proposed residuals management plan adequate? ❑ Yes ❑ No ❑ N/A
If no, please explain:
FORM: WQROSSR 04-14 Pagel of 5
DocuSign Envelope ID: 76258EC3-OCBC-48B8-9A62-2D4E18ED7DCE
6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable`? ❑ Yes ❑ No ❑ N/A
If no, please explain:
7. Are there any setback conflicts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No
If yes, attach a map showing conflict areas.
8. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N/A
If no, explain and recommend any changes to the groundwater monitoring program:
9. For residuals, will seasonal or other restrictions be required? ❑ Yes ❑ No ❑ N/A
If yes, attach list of sites with restrictions (Certification B)
Describe the residuals handling and utilization scheme:
10. Possible toxic impacts to surface waters:
11. Pretreatment Program (POTWs only):
III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® N/A
ORC: Certificate #: Backup ORC: Certificate #:
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? ® Yes or ❑ No
If no, please explain:
Description of existing facilities:
A 240 gpd single-family residence wastewater treatment and irrigation facility consisting of:
• 1,200 gal baffled septic tank
• 100 square foot pressure dosed recirculating sand filter with a 11.2 gpm dosing pump
• 14 gpm ultraviolet disinfection unit
• 1,500 gal storage/pump tank with a 14.0 gpm pump and audible/visual high water alarms
0 0.02 acre drip irrigation area with 320 ft of tubing, 160 emitters
Proposed flow: N/A
Current permitted flow: 240 GPD
Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important
for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership,
etc.)
3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately
assimilating the waste? ® Yes or ❑ No
If no, please explain:
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? ❑ Yes or ® No
If yes, please explain:
5. Is the residuals management plan adequate? ® Yes or ❑ No
If no, please explain:
6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No
If no, please explain:
7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A
If no, explain and recommend any changes to the groundwater monitoring program:
8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No
If yes, attach a map showing conflict areas.
FORM: WQROSSR 04-14 Page 2 of 5
DocuSign Envelope ID: 76258EC3-OCBC-48B8-9A62-2D4E18ED7DCE
9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No
If no, please explain:
10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ❑ N/A
If no, please explain:
11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A
If no, please complete the following (expand table if necessary):
Monitoring Well
Latitude
Longitude
O l lI
O I II
O / //
O / //
O l 11
O I //
O l 11
O / //
O l 11
O / //
12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No
Please summarize any findings resulting from this review: No violations issued.
Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable.
13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No
If yes, please explain:
14. Check all that apply:
® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC
❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium
Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.)
If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been
working with the Permittee? Is a solution underway or in place?
Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑ No ❑ N/A
If no, please explain:
15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes ❑No®N/A
If yes, please explain:
16. Possible toxic impacts to surface waters: N/A
17. Pretreatment Program (POTWs only): N/A
FORM: WQROSSR 04-14 Page 3 of 5
DocuSign Envelope ID: 76258EC3-OCBC-48B8-9A62-2D4E18ED7DCE
IV. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
If yes, please explain:
2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an
additional information request:
Item Reason
3. List specific permit conditions recommended to be removed from the permit when issued:
Condition Reason
4. List specific special conditions or compliance schedules recommended to be included in the permit when issued:
Condition Reason
5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office
❑ Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information
® Issue
❑ Deny (Please state reasons: ) /—DocuSigned by:
0
Signature of report preparer:
Signature of regional supervisor:
Date: 6/2/2020
�eAt�
—1D645B4A39694BE...
Docu Signed by:
E3ABA14AC7DC434...
FORM: WQROSSR 04-14 Page 4 of 5
DocuSign Envelope ID: 76258EC3-OCBC-48B8-9A62-2D4E18ED7DCE
V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
This staff report is being prepared for the renewal of SFR Permit WQ0015234. Due to COVID-19 and restrictions
place on WIRO staff, only a file review and phone interview with the Permittee was performed instead of a site visit.
The property, 490 Shell Hill Road, Sealevel, is a vacation property and is not occupied year around. There have been
no violations issued for this facility. The Permittee stated that Spectrum Environmental inspects and completes any
repairs needed to the SFR wastewater treatment and drip irrigation system once a year. A log book is kept on site to
record when the system is used. A spare bulb for the single UV light unit is on site.
According to the Permittee, there have been no changes to the SFR wastewater treatment or drip irrigation systems
and property lines have not changed since the last renewal.
FORM: WQROSSR 04-14 Page 5 of 5