HomeMy WebLinkAboutNCC202373_ESC Approval Submitted_20200605Engineering Services Department
Terry K u n e tt
INTERIM DIRECTOR
■ram
N Q RTH CARO LINA' S INTERNATIONAL CITY`
March 26, 2020
Financially Responsible Pa
Auto Mall Property, LLC
P.O. Box 5668
High Point, NC 27262
Owner
Auto Mall Property, LLC
P.O. Box 5668
High Point, NC 27262
RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN
Project: Vann York Group
Location: 422 Eastchester Drive, High Point NC 27262
Land -Disturbing Permit # EN-20-0021
Accela Parent Record: # SP-20-0010
Dear Sirs:
The Engineering Services Department has completed the review process for the Soil Erosion
Sedimentation Control Plan submitted on March 26, 2020 for the project referenced above.
Based on our review, the plan is hereby approved.
This plan will specifically cover the Erosion and Sediment Control Measures during the
Grading and Building Phases. If a different identity executes the Building Phase, this
approved Erosion and Sediment Control Plan (E&SCP) may be transferred to the
firm/person executing the Building Phase. Prior to transferring the plan, written
authorization and a Financial Responsibility Form must be submitted to our office for
review. The terms and conditions of the approved plan shall remain in place unless
otherwise noted.
The Erosion Control Measures shown on the plans) are approximate. Some field adjustment
may be required to make the measures work correctly.
This letter will serve notice that:
• As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND
INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be
carried out by the staff of Department of Environmental Quality or other qualified
persons authorized by the Commission or Department of Environmental as necessary to
carry out its duties under the Act and No person shall refuse entry or access to any
representative of the Commission or any representative of a local government who
requests entry for purposes of inspection.
• As per High Point Development Ordinance 2.S.10.G.1 and 2, the Land -Disturbing Permit
will become null and void one (1) year from the date of issuance. You may request in
writing, 180-day permit extension 30 days, prior to the expiration date, for good cause.
• The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing
Permit issued by the City of High Point is conditional based on the applicant's
compliance with Federal and State water quality laws, regulations, and rules.
• The approval of the draft Erosion and Sediment Control Plan is based in part on the
accuracy of the information provided on the submitted Financial Responsibility Form. If
any changes to the submitted Financial Responsibility Form (e.g. ownership, address,
company name) occur, then you are required to submit an amended form showing such
changes.
• The approval of the draft Erosion and Sediment Control Plan does not supersede any
other permit or approval.
• Submittal of the approved plans along with this letter of approval must be submitted to
www.deq.nc.gov/NCGO1. This is a separate application process under the new NC
Construction Stormwater General Permit.
for help and instruction.
See the attached fact sheet and guidance sheets
• Approval of the draft Erosion and Sediment Control Plan authorizes the permittee to
discharge stormwater in accordance with the standard and regulations of current General
Permit NCGO10 and the National Pollutant Elimination System (��TPDES).
• This Letter of Approval must be posted at the site of the land disturbing activity along
with the Land -Disturbing Permit, the approved Erosion and Sediment Control Plan, a
copy of the NPDES/NCG001 Permit, and a copy of the Certificate of Coverage (COC).
• Records of Inspections must be kept on site for twelve (12) months. The
All data used to complete the e-NOI and all Inspection Records must be maintained for a
period of three (3) years and available upon request (40 CFR 122.41).
Construction site pollutants must be maintained on -site and not allowed to reach the
state's waters. Any spent fluids from construction traffic must be cleaned up and disposed
of properly. Any herbicide, pesticide and fertilizer must be used in accordance to the
label restrictions. All wastes composed of building materials shall be disposed of in
accordance with North Carolina General Statues, Chapter 130A, Article 9 —Solid Waste
Management, and rules governing the disposal of solid waste (NC Administrative Code
Section 15A NCAC 13B). No dumping of paint and other liquid building material waste
in storm drains. Concrete materials onsite, including excess concrete, must be controlled
and managed to avoid contact with surface waters, wetlands or buffers. No concrete
slurry shall be discharged from the site.
Only minor deviation from the approved plan can be approved by the Erosion Control
Inspector prior to address the following deficiencies:
o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam, rolled
erosion control practices, etc.).
i
o Relocation of E&SC Measures that improve the overall stormwater and sediment
control.
• Erosion Control Measures must be maintained until site is stabilized with sufficient
ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS 113A-51
through 66) is performance -oriented, requiring protection of existing natural resources
and adjoining properties. If, following the commencement of this project, the approved
E&SCP is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973, revisions to the plan may be required by the Erosion Control Inspector.
• A condition of this approval is that the streets in this phase must be kept free of sediment.
Daily cleaning of streets will be required. Erosion Control Measures to prevent.
construction traffic tracking sediment onto the streets must be maintained. Any debris or
sediment will be cleaned from the street surface immediately.
• All applicable fees must be paid prior to the issuance of the Land -Disturbing Permit.
When you are ready for the Land -Disturbing Permit to be issued, please notify my office to
arrange for apre -construction meeting.
ufficient ground cover has been established. The surety will be for 1.25 Ac disturbed
' 1i 1I
Site Data:
Project Name: Van York Group
Land -Disturbing Permit (Project ID): EN-20-0021
Limits of Disturbance (in acres)
Address: 422 Eastchester Drive
City: High Point
State: NC
Zip Code: 27262
County: Guilford
approved: 4.0 Ac
Latitude (in decimal degrees): 35.983730 degrees
Longitude (in decimal degreesl:-80.011781 degrees
River Basin: Cape Fear
Draft E&SCP submitted by:
Jamestown Engineering Group, Inc. (Rich Glover)
117 East Main Street
Jamestown, NC 27282
Dates) draft E&SCP Received: 1/16/2020
Plan Type: E&SCP
Please call me if you have any questions or comments.
Sincerely,
Kathy Blake
Engineering Services Department
(336) 883-3194
cc; File
3