NORTH CAROLINA
Environmental Quality
June 8, 2020
Subject: NOTICE OF VIOLATION (NOV-2020-PC-0106)
NPDES Stormwater General Permit NCG210000
T&S Hardwoods
Certificate of Coverage NCG210134
Jackson County
Dear Mr. Thompson:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on May 29, 2020.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
./ Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
828.296A500
Compliance Inspection Report
Permit:NCG210134 Effective:08/01/18 Expiration: 07/31/23 Owner: T&S Hardwoods Inc
SOC: Effective: Expiration: Facility: T&S Hardwoods Incorporated
County: Jackson 3635 Skyland Dr
Region: Asheville
Sylva NC 28779
Contact Person: Doug Rowe Title: Phone:828-586-4044
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 05/29/2020
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification: Phone:
Entry Time 10:30AM Exit Time: 12:OOPM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products. Stormwater Discharge CDC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG210134 Owner -Facility: US Hardwoods Inc
Inspection Date: 05/29/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On May 29, 2020 this facility was inspected to ascertain if adequate progress had been made in response to the previously
issued Notice of Violation. I met with Nathan Thompson on site. During the inspection, the following items were noted:
1) The Stormwater Pollution prevention plan has been updated and prepared for future use.
2) 1 discussed the recent monitoring data in relation to tier response at the facility with Mr. Thompson.
3) Secondary containment has been provided in all locations except for the large fuel storage area which Mr. Thompson
explained will be replaced in the coming months.
4) Several possible sources of COD exceedances were discussed and observed. Mr. Thompson has said he will be looking
into modifications to the process to address those problems.
The Notice of Violation shall remain open due to the remaining issues with secondary containment, but adequate progress
has been made to prevent further Notices or action at this time.
The permittee is directed to inform the regional office once the remaining modifications to the secondary containment on site
have been made.
Notes:
Please review the tier relief monitoring requirements of the permit and operate accordingly.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG210134 Owner -Facility: TSS Hardwoods Inc
Inspection Date: 05/29/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include alist of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Yes No NA NE
■❑❑❑
■❑❑❑
■❑❑❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑■❑❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑