HomeMy WebLinkAboutWQ0037555_Monitoring - 04-2020_20200529FORM: NDAR-2 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-2) Page of
Permit No.: WQ0037555
Facility Name: Trillium Links & Village
County: Jackson
Month: April
Year: 2020
Did infiltration occur at
Site Name:
Basin C
Site Name:
Site Name:
Site Name:
this facility?
Area (acres):
0.31
Area (acres):
Area (acres):
Area (acres):
❑ YES ❑ NO
Rate (GPD/ft2):
1.3
Rate (GPD/ft):
Rate (GPD/ft):
Rate (GPD/ft):
Weather
Freeboard
Site Infiltrated?
❑ YES ❑ No
Site Infiltrated?
❑ YES C NO
Site Infiltrated?
❑ YES ❑ NO
Site Infiltrated?
❑ YES LINO
>`
Q
j
L
ty
O
W
R
y
O
d
•.Q.
'd
a
N
U
i
O G
U)
w
N
U
=
cp CLO
w
.
7 G
i1.
O
T
C
C
p
N
LL m
d a
_O3 OQ.
i
y
d
1
O
LL m
N M
.
O7
i
y
01
T
i C
C
p
LL m
d a
G
_O3 OQ.
i
y
�
01
"0
1
i C
C
0
NC
LL m
°F
in
ft
ft
gal
min
GPD/ft2
ft
gal
min
GPD/ft2
ft
gal
min
GPD/ft2
ft
gal
min
GPD/ft2
ft
1
CL
35
0.3
0
0
0.00
2
C
38
0
0
0
0.00
3
C
48
0
0
0
0.00
4
0
0
0.00
5
0
0
0.00
6
C
43
0
0
0
0.00
7
CL
49
0
0
0
0.00
8
CL
54
0
0
0
0.00
9
C
51
0.3
0
0
0.00
10
C
32
0
0
0
0.00
11
0
0
0.00
12
0
0
0.00
13
C
50
2.5
0
0
0.00
14
C
56
0
0
0
0.00
15
PC
44
0
0
0
0.00
16
C
55
0
0
0
0.00
17
C
30
0
0
0
0.00
18
0
0
0.00
19
0
0
0.00
20
CL
52
0.7
0
0
0.00
21
C
50
0
0
0
0.00
22
C
37
0
0
0
0.00
23
R
39
0.7
0
0
0.00
24
C
47
1.5
0
0
0.00
25
0
0
0.00
26
0
0
0.00
27
C
36
0.1
0
0
0.00
28
C
39
0
0
0
0.00
29
CL
51
0
0
0
0.00
30
PC
37
1.5
0
0
0.00
311
1
1
1
0
0
0.00
Monthly Loading (GPD/ft2):
0.00
#DIV/01
#DIV/0!
#DIV/0!
Year to Date Loading (GPD/ft):
�„ ,.
0.00
FORM: NDAR-2 10-13
NON -DISCHARGE APPLICATION REPORT (NDAR-2)
Page _/ of I
Did the application rates exceed the limits in Attachment B of your permit?
If not a basin, were the sites kept free of vegetation and raked?
If not a basin, were there any instances of effluent ponding in or runoff from the sites?
If a basin, were there any instances of breakout from the berms?
Was the onsite automatically activated standby power source tested and operational?
O Compliant ❑ Non -Compliant
O Compliant ❑ Non -Compliant
O Compliant ❑ Non -Compliant
O Compliant ❑ Non -Compliant
Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
raven. nuacn auunlOrlal meets If necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Michael Beck
Permittee:
Trillium Links & Village
Certification No.: SI-991669 WW-7930
Signing Official: Robert Barr
Grade: SI WW-IV Phone Number: 828-251-1900
Signing Official's Title: Signatory
Has the ORC changed since the previous NDAR-2? ❑ yes 21 No
Phone Number: 828-251-1900 Permit Exp.: 5/31/21
' r19-zo
(/t/4s 4-2,)
Signature Date
Signature Date
By this signature, I certify that this report is accurate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
With a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or Nose persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false imormalion, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617