Loading...
HomeMy WebLinkAbout20100752_Site Inspection_20070201of WAR r February 1, 2007 Mr. Mike Pettyjohn, P.E. Division Engineer N.C. Department of Transportation Post Office Box 250 North Wilkesboro, North Carolina 28659 Subject: Inspection US Highway 321 DWQ Project No. 041246 TIP No. R-2237B Caldwell County Dear Mr. Pettyjohn: On January 31, 2007, I visually inspected the construction work on US Highway 321 in Caldwell County and the project appeared to be in good shape. It appears that the construction work is progressing mainly at both ends and at a small section near the middle of the project. The erosion and sedimentation control structures, vegetative covering, mulching and matting appear to be working properly. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828.296.4500. Sincerely, i0/.?lam /' 4 ? ?? Michael R. Parker Environmental Specialist Attachment cc: Frank Gioscio, P.E. Heath Slaughter, Division 11, DEO Neil Trivette, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office One NthCarolina ,/VlIfllPll??lf North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service Internet: www.ncwaterquality.org FAX (828) 299-7043 1-877-623-6748 Michael F. Easley, Governor William G. Ross .1r., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality An Equal Opportunity/Affirmative Action Employer