Loading...
HomeMy WebLinkAboutNCC202342_ESC Approval Submitted_20200605Permita GP 28-15 Revision #56 Permit for a Land Disturbing Activity New Hanover County Department of Engineering 230 Government Center Drive - Suite 160 Wilmington, forth Carolina 20403 (910) 790-7139 As authorized by the New Hanovee County Erosion and Sedimentation Control Ordinance This permit issued to Seventy West Builders, Inc. authorizes the development of 4.72 acres of land on the lots fisted below in River Lights Conventional Phase I in New Hanover County. This permit issued on April 20, 2017 is subject to compliance with the application and site drawings, all applicable regulations and special conditions and notes set forth below. Any plan modifications must be approved by this office prior to field changes. It is understood by the applicant that a representative of New Hanover County's Engineering Department may inspect the site at any time following the issuance of this Permit. A copy of the approved Soil Erosion Control Plan, this permit, a rain gauge and copies of the Combined Self -Monitoring and Self Inspection Reports must be available at all times at the site. Failure to execute the provisions of this permit and the approved Soil Erosion Plan, or any other provisions of the New Hanover County Soil Erosion and Sedimentation Control Ordinance, shall result in immediate legal action by the County to the limits prescribed by the Ordinance. If the measures outlined on the approved Soil Erosion Control Plan and this Permit prove insufficient, additional Erosion Control measures can and will be required which in turn will be considered provisions of this Permit. This Permit does not preclude any other permits or approvals necessary for beginning or completing this development. Approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State laws, regulations and rules. It is the Permittee's responsibility to obtain all necessary permits and approvals. SPECIAL CONDITIONS (THESE CONDITIONS MUST BE FOLLOWED IN ADDITION TO THE PLANS AND SPECIFICATIONS) *All the soil erosion control measures will be installed as the site is cleared and maintained throughout construction. Revision #9 approved 4/20/17 for 1.22 acres includes construction entrances and silt fences on lots 25, 26,20-30,35, 43, 74, 75 P 77 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #15 approved 6/5/17 for 0.15 acres includes construction entrances and silt fences on lot 45 in Diver Lights Conventional Phase I for Seventy West Builders. Note: inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #19 approved 6/29/17 for 0.39 acres includes construction entrances and silt fences on Lots 27, 44 & 76 in River Lights Conventional Phase i for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #22 approved 7/24/17 for 0.60 acres includes construction entrances and silt fences on Lots 39, 42, 97 & 213 in River Lights Conventional Phase I for Seventy West Builders. Dote: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision ##24 approved 7/28/17 for 0.24 acres includes construction entrances and silt fences on Lots 210 & 3000 in River Lights Conventional Prase I for Seventy molest Builders. mote: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer (Continued) - Page Two Permit# GP 28-15 Revision #56 Revision #26 approved 8/11/17 for 0.23 acres includes construction entrances and silt fences on Lots 40 & 41 in River Lights Conventional Phase I for Seventy West Builders. Note. Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #30 approved 9/25/17 for 0.28 acres includes construction entrances and silt fences on Lots 203 & 3001 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #34 approved 11/8/17 for 0.12 acres includes construction entrances and silt fences on Lot 208 in River Lights Conventional Phase I for Seventy West Builders, Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #35 approved 12/19/17 for 0.19 acres includes construction entrances and silt fences on Lots 207 & 214 in River Lights Conventional Phase I for Seventy West Builders. Note. Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #36 approved 12/20/17 for 0.10 acres includes construction entrances and silt fences on Lot 217 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #37 approved 12/22/17 for 0.13 acres includes construction entrances and silt fences on Lot 302 in River Lights Conventional Phase I for Seventy West Builders. Note. Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #39 approved 1/8/18 for 0.10 acres includes construction entrances and silt fences on Lot 216 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #42 approved 3/6/18 for 0.36 acres includes construction entrances and silt fences on Lots 93, 95, & 204 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #44 approved 3/25/18 for 0.11 acres includes construction entrances and silt fences on Lot 96 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #45 approved 4/16/18 for 0.25 acres includes construction entrances and silt fences on Lots94 & 205 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. NOTE: Revisions prior to Revision #55 were approved prior to the NCG01 regulations that are now noted on this permit. Revision #55 approved 4/23/20 for 0.13 acres includes a construction entrance and silt fence on Lot 89 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. Revision #56 approved 5/11/20 for 0.12 acres includes a construction entrance and silt fence on Lot 91 in River Lights Conventional Phase I for Seventy West Builders. Note: Inlet protection may also be your responsibility to maintain depending on your agreement with the developer. This permit does not preclude any permits or approvals which may be necessary. These include but are not limited to, City of Wilmington or New Hanover County Stormwater, Planning or Zoning, State or County C.A.M.A., DEMLR Water Quality, Water Resources or Solid Waste, the US Army Corps. of Engineers or any other agencies. The approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State Water Quality laws, regulations and rules. *Tree Removal Permits and/or Approvals are required from the City of Wilmington and/or New Hanover County. *All City and/or County and State drainage and stormwater requirements will be adhered to. *Silt fence stakes must be steel and will be placed six feet apart without wire reinforcement and extra strength silt fence or eight feet apart with wire reinforcement. Silt fence is not allowed as inlet protection. *If any phase of grading ceases for more than 15 working days, the site will be temporarily stabilized. (Continued) - Page Three Permit# GP 28-15 Revision #56 *All slopes must be stabilized within 21 calendar days of any phase of activity. *No sediment shall leave the site. *If these measures fail to adequately control erosion, more restrictive measures will be required. *If plan revisions are necessary you must submit a copy to this office for approval p.rior to any field changes. *Any borrow material brought onto this site must be from a legally operated mine or other approved source including a separate construction site with an active land disturbing permit. Borrow from any other location would require this permit to be revised to include the area where the borrow was generated as part of this site. Any soil waste that leaves this site can be transported to a permitted mine or separate construction site with an active land disturbing permit without additional hermits. Disposal at any other location would require the disposal site to be included in this permit and would require submittal and approval of revised plans. You must notify this office of the location where soil is taken from or transported too prior to the activity. *Note the required rates for seed, lime, fertilizer and mulch in your seeding specifications. *Pre -construction meetings are optional. Contact Beth E. Wetherill at (910) 798-7139 to set up a meeting prior to land disturbing activity onsite. If you do not choose to have a preconstruction meeting prior to starting work on site, you should contact us when activity begins and again when the initial measures have been installed. * This land disturbing permit requires inspections and record keeping to be performed by the landowner, the financially responsible party or their agent, during and after each phase of the plan has been completed and after establishment of temporary ground cover. Records shall be maintained onsite until permanent ground cover has been established to provide sufficient root structure to restrain erosion. These phases include: installation of perimeter erosion and sediment control measures; clearing and grubbing of existing ground cover; completion of any phase of grading on slopes or fills that requires provisions of temporary or permanent ground cover; completion of storm drainage facilities; completion of construction or development; and quarterly until the establishment of permanent ground cover sufficient to restrain erosion. Or, until the financially responsible party has conveyed ownership or control of the tract of land for which the erosion and sedimentation control plan has been approved and the agency that approved the plan has been notified. If the financially responsible party has conveyed ownership of control of the tract of land for which the erosion and sedimentation control plan has been approved, the new owner's or person in control shall conduct and document inspections quarterly until the establishment of permanent ground cover sufficient to restrain erosion. The person who performs the inspections shall maintain and make available a record of the inspection at the site of the land disturbing activity until permanent ground cover has been established. The records will document: the installation of the erosion and sedimentation control measures, practices and devices as set forth by the approved plan or if the measures, practices and devices are modified after initial installation; the completion of any phase of grading for all graded slopes and fills shown on the approved plan, specifically noting the location and condition of the graded slopes and fills; the location of temporary or permanent ground cover, and that the installation of the ground cover does not significantly deviate from the approved plan; that maintenance and repair requirements for all temporary and permanent erosion and sedimentation control measures, practices an devices have been performed and that they don't significantly deviate from the approved plan; any significant deviation from the approved erosion control plans and identify measures that may be required to correct the deviation and document the completion of the corrective actions; it includes contact information for the person conducting the inspection and the date of the inspection. These requirements are in addition to inspections required by GS 113A 61.1. * As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit unless this project has applied for an Individual Construction Stormwater Permit. The NOI form must be submitted prior to the commencement of any land disturbing activity on the above named project, according to State Stormwater requirements. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOi form to Annette Lucas at Annette. IucasPncdenr_gov or Paul Clark at.PauI.clarkC@ncdenr.gov. After you submit a complete and correct NOI Form, a COC (Continued) - Page Four Permit# GP 25-15 Revision #56 will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. *Additional self -inspections, record keeping and reporting is required by the Construction Stormwater General Permit - NCG01 per State Stormwater. It requires inspections and record keeping at least once per 7 calendar days and within 24 hours of a rain event of 1.0 inch or more, in 24 hours. Rain inspections reset the required 7 calendar day inspection requirement. Records of inspection made during the previous 30 days must be kept onsite. Other reports are to be made available for 3 years. Reporting is required to the States Stormwater Divisions Regional Office for sediment deposits in streams or wetlands, oil spills, release of hazardous substances, anticipated bypasses, unanticipated bypasses and noncompliance with conditions of the permit that may endanger health or the environment. There are specific time frames for reporting and submittal of reports to the Divisions Regional Office. NCG01 includes 7 and 14 calendar day ground stabilization and materials handling requirements. Materials are to be kept in leak proof containers, under storm resistant cover or have secondary control structures. They are to be stored 50 feet away from storm drains, surface waters and wetlands. They include flocculants, equipment and vehicle maintenance, litter, building materials and land clearing waste, paint and other liquids, portable toilets, earthen stockpile management, concrete washouts, herbicides, pesticides and rodenticides, and hazardous and toxic waste. Contact the Department of Energy, Mineral and Land Resources Stormwater Division at deq.nc.gov/NCGO1 or the Wilmington Regional Office at 910) 798-7215 for additional information. This Permit will expire one year from date of issue if no construction activity begins on site. This permit may not be amended or transferred to another party without approval of this office. *f, ` WL444-vlL Beth E. Wetherill, C.P.E.S.C. Soil Erosion Specialist/New Hanover County Acknowledgment of receipt of Permit E-1. ma, 'Moffim mr—mis-1. �VIVJAIQ By (please print) ign ure