HomeMy WebLinkAbout520077_Plan of Action_20200603Jun 03 2020 11:45AM Selby Land Concepts 2529646775
page 6
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES J
Facility Number: 16_2 - 7 County: OA ES
Facility Name: MRCR L.L.G
Certified Operator Name: �/ EM y I St Operator # 2
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):�
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
$43_
A10 A/o
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources Prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: Joe ? OAO
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
jCxf-/1/L/ Rat
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
PoA Cover Page 2/21100
Phone:
'g�,z -6z 0 _,x6.?6
Date:
Jun 03 2020 11:45AM Selby Land Concepts 2529646775
page 7
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): #2 52-77
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 15.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 4.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 149850 ftz
e. line c/12 x line d x 7.48 gallons/ft' 420329 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 213632 ft3
h. current herd # 4500 certified herd #1 6460
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 2/21/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121100
148356 It'
W
87412 ft3
293924 gallons
1.59 Ibs/1000 gal.
1135.7 Ibs. PAN
Jun 03 2020 11:46AM Selby Land Concepts 2529646775
page 8
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelidentifrer (ID): #3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 15.0
b. designed 25 yr./24 hr. storm & structural freeboard 19.5
c. line b - line a (inches in red zone) = 4.5
d. top of dike surface area according to design
(area at below structural freeboard elevation) 152550
e. line c/12 x line d x 7.48 gallons/W 427903
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180
g. volume of waste produced according to structural design 213632
h. current herd # 1700 certified herd #1 6480
actual waste produced = current herd # x line g = 56045
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 daysiline f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 2/21/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
88987
180807
1.00
608.7
Jun 03 2020 11:46AM Selby Land Concepts 2529646775
page 9
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
I. Structure Name/identifier (ID): 1 #4
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 15.0
b. designed 25 yr./24 hr. storm & structural freeboard 19.5
c. line b - line a (inches in red zone) = 4.5
d. top of dike surface area according to design
(area at below structural freeboard elevation) F 32786
e. line all x line d x 7.48 gallonsIt' 91965
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180
g. volume of waste produced according to structural design 38096.3
h. current herd # E7:� certified herd # 5200
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2/21/2020
m. ((lines e + k)/l000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
20416,7
25453
1.91
224.3
Jun 03 2020 11:46AM Selby Land Concepts 2529646775 page 10
If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: #2
line m = 1135.7 lb PAN
2.
Structure ID: #3
line m = 608.7 lb PAN
3.
Structure ID: #4
line m = 224.3 lb PAN
4.
Structure ID:
line m = lb PAN
5.
Structure ID:
line m = Ib PAN
6.
Structure ID:
line m = lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1968,E lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
icT cici nc Tn uuwcu DAM [tAkiUnT RF APPI IFn ntIRING THIS 30 DAY PERIOD.
o. tract #
p. field #
q crop
r. acres
s remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u, application window'
1437
Pivot 3
CORN
14.60
90.00
1314.0
2/15-6130
Pull #18
CORN
5.33
120.00
639.6
2/15-6130
Pull #19
CORN
5.33
110.00
586.3
2/15-6130
Pull #20
CORN
5.61
125.00
701.3
2/15-6130
Pull #21
CORN
5.61
136.00
763.0
2115-6130
Pull #22
CORN
6.00
130.00
760.0
2/15-6130
'State current crop ending application (late or next crop appucauon veynn Illly ua« IVI G14P1 G V.G
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 4784-2 lb. PAN
PoA (30 Day) 2121100
Jun 03 2020 11:46AM Selby Land Concepts 2529646775 page 11
IV. FACILITY'S PoA OVERALL. PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1968.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) 4784.2 lb. PAN
y. Overall PAN balance (w - x) _ -2816 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. if new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Date: 4/25/17
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2121/00