HomeMy WebLinkAbout520002_Plan of Action_20200603Jun 03 2020 11:45AM Selby Land Concepts 2529646775
page 2
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: .5-�2 - 2 County: Jo,c/tS
Facility Name:-�/1-ok �i�//St/i�✓lr
Certified Operator Name: Operator # J7��
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1
Lagoon Name/Identifier (ID):1
Spillway (Yes or No)- Mb
Level (inches): / 1
2. Check all applicable items
Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
/ acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: A/f- 2
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
7�CAMZ-0 %AY&z�,e— Phone:
Facility Owner/Manager (print)
Date: ��"�t /j�`�
Facility Owner/Manager (signature)
PoA Cover Page 2121/00
Jun 03 2020 11:45AM Selby Land Concepts 2529646775
page 3
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1#2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 2.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 125450 ftz
e. line c/12 x line d x 7.48 gallons/ft3 195493 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 221390.4 ft3
h. current herd # F---5-0-0-01 certified herd #1 9100
actual waste produced = current herd # x line g = 121643 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 1 2121/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
�jft3
1 102�159.$ ft3
279008 gallons
1.25 Ibs/1000 gal.
593.1 Ibs. PAN
Jun 03 2020 11:45AM Selby Land Concepts 2529646775 page 4
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID #2
line m = 593.1 Ib PAN
2
Structure ID
line m =
lb, PAN
3
Structure ID
line m =
lb, PAN
4
Structure ID
line m =
lb PAN
5.
Structure ID.
line m =
lb PAN
6.
Structure ID
line m =
Ib PAN
n.lines 1+2+3+4+5+6= 593.1 ibPAN
Ili. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST
FIELDS TO WHICH PAN
CANNOT BE
APPLIED DURING_
THIS 30
DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(Ibtacre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. appiication window'
240
F1
Soybeans
3.63
152.00
551.8
4/1-9/15
F2
Soybeans
4.42
13600
601.1
4/1-9/15
F3
Soybeans
607
13600
825-5
411-9/15
'State current crop ending application date or next crop appncaticn neglnning sate Tor avanaoie
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1978.4 Ib. PAN
s�
PoA (30 Day) 2121f00
Jun 03 2020 11:45AM Selby Land Concepts 2529646775 page 5
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 593.1 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1978.4 lb. PAN
y. Overall PAN balance (w - x) = -1385 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
N
Date: 4/25/17
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2/21/00