HomeMy WebLinkAbout20190752 Ver 3_Chemours permit flow-through cell QUANTITIES FOR PERMIT_20200603GABIONS
CHECK DAM
SANDBAGS
SEEP
GABION
EL.
OHWM
# OF
SHEETPILES
# OF
GABIONS
TOTAL
UNDER OHWM
TOTAL
UNDER OHWM
TOTAL
UNDER OHWM
GAC (CY)
#57 STONE
(CY)
CLASS B RIP
RAP (CY)
GAC (CY)
#57 STONE
(CY)
CLASS B RIP
RAP (CY)
CLASS B RIP
RAP (CY)
CLASS B RIP RAP
UNDER
OHWM(CY)
NEXT TO
SHEETPILE
(QTY)
ALONG
GABIONS
(QTY)
BEHIND
GABIONS
(QTY)
TOTAL
(QTY)
TOTAL
(CY)
NEXT TO
SHEETPILE
(QTY)
ALONG
GABIONS
(QTY)
BEHIND
GABIONS
(QTY)
TOTAL
(QTY)
TOTAL
(CY)
A
34
37
10
11
22
5.07
1.48
22.00
5.07
1.48
4.48
4.48
72
1188
252
1512
14.00
72
1188
252
1512
14.00
B
42
44
21
7
14
3.30
1.48
9.33
3.30
1.48
2.85
1.90
72
756
648
1476
13.67
48
504
432
984
9.11
C
36
39
21
41
81
1.96
1.48
8.001
1.96
1.481
1.63
1.63
721
4321
6481
11521
10.67
721
4321
6481
1152
10.67
D
34
35
28
81
161
3.74
1.48
5.331
3.74
1.481
3.26
1.09
721
8641
9001
18361
17.00
241
2881
3001
6121
5.67
ROADWAY - 112 FT IN WETLAND
49.78 ICY CRUSHED STONE
15 1 FT OF 24" CLASS I I I RCP
W L IH VOL (CUFT) VOL (CY)
sandbag 1 21 0.1251 0.25 0.00925926
sandbag at sheetpile 36
sandbag upstream per sheetpile 36
sandbag per gabion 54
GABION 2 CY
x 57 STONE UNDER EACH GABION 0.44 CY
57 STONE IN FRONTAND BEHIND GABIONS 0.19 CY