Loading...
HomeMy WebLinkAbout20190752 Ver 3_Chemours permit flow-through cell QUANTITIES FOR PERMIT_20200603GABIONS CHECK DAM SANDBAGS SEEP GABION EL. OHWM # OF SHEETPILES # OF GABIONS TOTAL UNDER OHWM TOTAL UNDER OHWM TOTAL UNDER OHWM GAC (CY) #57 STONE (CY) CLASS B RIP RAP (CY) GAC (CY) #57 STONE (CY) CLASS B RIP RAP (CY) CLASS B RIP RAP (CY) CLASS B RIP RAP UNDER OHWM(CY) NEXT TO SHEETPILE (QTY) ALONG GABIONS (QTY) BEHIND GABIONS (QTY) TOTAL (QTY) TOTAL (CY) NEXT TO SHEETPILE (QTY) ALONG GABIONS (QTY) BEHIND GABIONS (QTY) TOTAL (QTY) TOTAL (CY) A 34 37 10 11 22 5.07 1.48 22.00 5.07 1.48 4.48 4.48 72 1188 252 1512 14.00 72 1188 252 1512 14.00 B 42 44 21 7 14 3.30 1.48 9.33 3.30 1.48 2.85 1.90 72 756 648 1476 13.67 48 504 432 984 9.11 C 36 39 21 41 81 1.96 1.48 8.001 1.96 1.481 1.63 1.63 721 4321 6481 11521 10.67 721 4321 6481 1152 10.67 D 34 35 28 81 161 3.74 1.48 5.331 3.74 1.481 3.26 1.09 721 8641 9001 18361 17.00 241 2881 3001 6121 5.67 ROADWAY - 112 FT IN WETLAND 49.78 ICY CRUSHED STONE 15 1 FT OF 24" CLASS I I I RCP W L IH VOL (CUFT) VOL (CY) sandbag 1 21 0.1251 0.25 0.00925926 sandbag at sheetpile 36 sandbag upstream per sheetpile 36 sandbag per gabion 54 GABION 2 CY x 57 STONE UNDER EACH GABION 0.44 CY 57 STONE IN FRONTAND BEHIND GABIONS 0.19 CY