HomeMy WebLinkAbout20200727 Ver 1_Updated Civil Plans_20200602GENERAL: EROSION CONTROL: CONSTRUCTION SEQUENCE: w co U Of Q Q co U = � U > ry U Q �Q In 0 �m U � o� co o L� �o coo J N �w v � o o� o u-a 1. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY ASSOCIATED WITH THE WORK UNDER THIS PROJECT AND FOR COMPLIANCE WITH ALL FEDERAL, STATE AND LOCAL HEALTH AND SAFETY LAWS, CODES, REGULATIONS, AND ORDINANCES INCLUDING, BUT NOT LIMITED TO, THOSE CURRENTLY MANDATED BY THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). 2. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN, INSTALLATION, AND MAINTENANCE OF ALL EXCAVATION SUPPORT ON THE PROJECT. ALL EXCAVATION SUPPORT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NORTH CAROLINA. ALL EXCAVATION SUPPORT DESIGN DOCUMENTS SHALL BE PRESENTED TO THE ENGINEER FOR REVIEW BEFORE IMPLEMENTATION. CONTRACTOR SHALL USE ADEQUATE SHORING METHODS TO ENSURE: A. COMPLIANCE WITH OSHA REGULATIONS. B. PROTECTION OF EXISTING PAVEMENT AND ROAD SHOULDERS, STRUCTURES AND UTILITIES. C. CONSTRUCTION ACTIVITIES ARE CONFINED TO RIGHTS -OF -WAY OR EASEMENTS AS INDICATED 3. LIMITS OF DISTURBANCE (LOD) SHALL BE AS INDICATED ON THE CONTRACT DRAWINGS. ANY CHANGES TO THE LOD BY THE CONTRACTOR SHALL REQUIRE PRIOR APPROVAL FROM THE ENGINEER. 4. CONTRACTOR SHALL REPAIR AT HIS OWN EXPENSE, ANY DAMAGE CAUSED BY CONSTRUCTION RELATED ACTIVITIES TO EXISTING UTILITY SERVICE LINES. 5. IN THE EVENT OF DAMAGE TO EXISTING UTILITIES, CONTRACTOR SHALL STOP WORK IMMEDIATELY, TAKE NECESSARY PRECAUTIONS TO PREVENT INJURY OR FURTHER DAMAGE, AND NOTIFY PROPER AUTHORITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING/REPAIRING ALL EXISTING STRUCTURES, CONDUITS, OR OTHER UTILITIES DAMAGED BY CONTRACTOR'S OPERATIONS AT NO COST TO OWNER. 6. REMOVAL AND REPLACEMENT OR REPAIR OF EXISTING UTILITY SERVICES SHALL BE COORDINATED WITH APPROPRIATE UTILITY COMPANY AT NO ADDITIONAL COST TO THE OWNER. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT TO ORIGINAL OR BETTER CONDITION OF ALL EXISTING PAVEMENTS, FENCES, AND MISCELLANEOUS ITEMS WHERE DAMAGED BY CONSTRUCTION ACTIVITIES OR REQUIRED TO COMPLETE THE CONSTRUCTION. 8. ALL HOLES, TRENCHES, AND OTHER HAZARDOUS AREAS SHALL BE ADEQUATELY PROTECTED BY BARRICADES, LIGHTS OR OTHER PROTECTIVE DEVICES. 9. REMOVAL OF EXCAVATED MATERIALS AND DAILY CLEANUP OPERATIONS SHALL BE PERFORMED IN COMPLIANCE WITH THE SPECIFICATIONS AND TO THE SATISFACTION OF THE OWNER/ENGINEER. 10. EXCESS/UNSUITABLE SPOIL TO BE REMOVED FROM SITE. PRIOR TO BEGINNING CONSTRUCTION, CONTRACTOR SHALL SUBMIT THE OFF -SITE SPOIL LOCATIONS TO BE USED AND PROVIDE DOCUMENTATION OF EROSION CONTROL MEASURES TO BE PROVIDED DURING DISPOSAL OPERATIONS. CONTRACTORS OFF -SITE SEDIMENT CONTROL MEASURES MUST BE APPROVED BY NCDENR PRIOR TO SPOIL DISPOSAL. 11. ALL EROSION AND SEDIMENTATION CONTROLS SHALL BE IMPLEMENTED BEFORE CONSTRUCTION COMMENCES AND SHALL NOT BE REMOVED UNTIL PERMANENT GROUND COVER STABILIZATION HAS BEEN ESTABLISHED. 12. THE CONTRACTOR SHALL RECORD AND SUPPLY TO THE ENGINEER THE FOLLOWING INFORMATION: A. THE LOCATION OF ALL UTILITIES CROSSED AND THE NEW LOCATION AND DEPTH OF ALL RELOCATED AND/OR ADJUSTED UTILITIES. 15. THE 1% ANNUAL CHANCE FLOOD (ACF) IS 272.9' TAKEN FROM FLOOD INSURANCE RATE MAPS DATED OCTOBER 19TH, 2018, AND MAPS #3720083500K AND #3720084500K. HORIZONTAL CONTROL: NAD 83 (2001) VERTICAL CONTROL: NAVD 88 1. CONTRACTOR TO POST EROSION CONTROL PERMIT ON JOB SITE AS REQUIRED. 2. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE BEFORE ANY LAND CLEARING OR DISTURBANCE ACTIVITIES MAY BEGIN. 3. A RAIN GAUGE SHALL BE MAINTAINED IN GOOD WORKING ORDER ON THE SITE UNLESS ANOTHER RAIN -MONITORING DEVICE HAS BEEN APPROVED BY THE INC DIVISION OF WATER QUALITY. A WRITTEN RECORD OF THE DAILY RAINFALL AMOUNTS SHALL BE RETAINED AND ALL RECORDS SHALL BE MADE AVAILABLE TO THE DIVISION OF WATER QUALITY. REFER TO THE INC NPDES GENERAL PERMIT NCG010000, SECTION II.B.(3)(B), FOR ADDITIONAL INFORMATION. 4. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EROSION CONTROL MEASURES WHETHER OR NOT SHOWN ON THE PLANS TO PROTECT ADJACENT CREEKS, RIVERS, ROADWAYS, ETC. FROM SILTATION AND EROSION. 5. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND WITHIN 24 HOURS OF ANY RAINFALL EVENT THAT PRODUCES 1/2 INCH OR MORE OF RAIN. REPAIR AND/OR REPLACE AS NECESSARY. SEE STANDARD DETAILS ON CONTRACT SHEET DC3 FOR SPECIFIC MAINTENANCE REQUIREMENTS FOR EACH EROSION AND SEDIMENT CONTROL MEASURE UTILIZED ON THIS PROJECT. 6. EROSION CONTROL MEASURES SHALL BE CLEANED OF ACCUMULATED SEDIMENT WHEN VOLUME OF MEASURE IS HALF FULL. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING WHEN IT BECOMES APPROXIMATELY 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN THE BARRIER. REMOVED SEDIMENT SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT FURTHER SEDIMENT TRANSPORT. IF NO SUITABLE ON -SITE LOCATIONS ARE AVAILABLE, ALL REMOVED SEDIMENT WILL BE LEGALLY DISPOSED OF OFF -SITE AT NO ADDITIONAL COST TO THE OWNER. 7. ALL EXCESS SOIL RESULTING FROM EARTHWORK OPERATIONS SHALL BE REMOVED FROM SITE BY CONTRACTOR. ALL TEMPORARY SOIL STOCKPILE AREAS USED FOR BACKFILL AND OTHER ACTIVITIES SHALL BE WITHIN THE LOD AS SHOWN ON THE DRAWINGS, AND LOCATED, AT A MINIMUM, 50 FEET FROM ANY SURFACE WATERS. ALL ONSITE TEMPORARY SOIL STOCKPILES SHALL BE SEEDED WITH TEMPORARY AND/OR PERMANENT SEEDING MEASURES FOR THE DURATION OF CONSTRUCTION ACTIVITIES. ALL CONTRACTOR STAGING AND LAYDOWN AREAS, SOIL OR WASTE STOCKPILE AREAS SHALL HAVE PERIMETER SILT FENCE. ANY SOILS TAKEN OFF SITE BECOMES THE CONTRACTORS RESPONSIBILITY AND SHALL COMPLY WITH ALL REQUIRED STATE AND LOCAL REGULATIONS AND PERMITS. 8. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL ENTIRE SITE IS PERMANENTLY STABILIZED WITH VEGETATION AS PER SEEDING SPECIFICATIONS AND SCHEDULE. ALL TEMPORARY EROSION CONTROL DEVICES ARE TO BE REMOVED AFTER PERMANENT STABILIZATION HAS BEEN ACHIEVED. 9. RESTORE ALL DISTURBED AREAS INCLUDING DITCHES/SWALES, STAGING/LAYDOWN/PARKING AREAS TO ORIGINAL GRADE AND ELEVATION AND ORIGINAL OR BETTER CONDITION, EXCEPT WHERE NOTED ON THE CONTRACT DRAWINGS. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: 1. CONTRACTOR SHALL SIGN AND IMPLEMENT THE REQUIREMENTS OF THE STATE APPROVED EROSION CONTROL PLAN AND THE NORTH CAROLINA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE STATE LAND QUALITY SECTION AT (919) 791-4200 TO SCHEDULE A PRE -CONSTRUCTION MEETING. ADDITIONALLY, THE CONTRACTOR SHALL NOTIFY THE STATE LAND QUALITY SECTION, AT (919) 791-4200 AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE AND LAND DISTURBING ACTIVITIES OCCUR. 2. INSTALL ALL PERIMETER TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES IN LOCATIONS AS SHOWN ON THE CONTRACT DRAWINGS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE INSTALLATION OF SILT FENCE, TREE PROTECTION FENCE, AND, GRAVEL CONSTRUCTION ENTRANCE. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES MAY BEGIN UNTIL ALL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. CLEAR ONLY THE AREA REQUIRED FOR INSTALLATION OF EROSION CONTROL MEASURES. 3. ONCE ALL TEMPORARY PERIMETER EROSION CONTROL MEASURES HAVE BEEN INSTALLED, THE SITE SHALL BE CLEARED AND GRUBBED, AS REQUIRED, WITHIN THE LIMITS OF DISTURBANCE (LOD) AS SHOWN ON THE CONTRACT DRAWINGS (C2). ANY ADJUSTMENTS TO THE LOD SHALL REQUIRE PRIOR APPROVAL FROM THE ENGINEER AND OWNER. 4. ALL DEBRIS FROM TREE CLEARING SHALL BE REMOVED FROM SITE. NO BURNING OF DEBRIS WILL BE ALLOWED. ALL EROSION CONTROL PRACTICES SHALL REMAIN IN PLACE WHEN CONSTRUCTION TRANSITIONS TO PHASE TWO. 5. ONCE ALL TREE CLEARING HAS BEEN COMPLETED, CONTRACTOR SHALL REROUTE THE 4" SANITARY SEWER LINE AS SHOWN ON CONTRACT DRAWING C4. CONTRACTOR SHALL PHASE CONSTRUCTION AS TO NOT INTERFERE WITH EXISTING FLOW THROUGH THE SEWER. ONCE THE EXISTING SANITARY SEWER HAS BEEN REROUTED, CONTRACTOR MAY BEGIN EXCAVATION AND SITE ACTIVITIES. 6. ALL EXCESS SOIL RESULTING FROM ANY EARTHWORK OPERATIONS NECESSARY SHALL BE REMOVED FROM SITE BY CONTRACTOR. ANY SOILS TAKEN OFFSITE BECOMES THE CONTRACTOR'S RESPONSIBILITY, AND SHALL COMPLY WITH ALL REQUIRED STATE AND LOCAL REGULATIONS AND PERMITS. 7. TEMPORARY SEEDING MEASURES SHALL BE EMPLOYED AS SOON AS PRACTICABLE ON DISTURBED AREAS BUT IN ANY EVENT WITHIN FOURTEEN (14) DAYS. DISTURBED SLOPES STEEPER THAN 3:1 SHALL BE TEMPORARILY SEEDED WITHIN SEVEN (7) DAYS UNLESS SLOPE LENGTH IS TEN (10) FEET OR LESS AND NOT STEEPER THAN 2:1. DISTURBED SLOPES 3:1 OR FLATTER SHALL BE TEMPORARILY SEEDED WITHIN FOURTEEN (14) DAYS UNLESS SLOPE LENGTH IS GREATER THAN 50 FEET. 8. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. 9. THE DESIGN PROFESSIONAL (A NCPE, NCPLS, OR NCRLA - AS REQUIRED) SHALL SUBMIT ONE (1) SET OF AS -BUILT DRAWINGS TO THE PUBLIC WORKS DEPARTMENT - DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. AS -BUILT DRAWING APPROVAL IS REQUIRED PRIOR TO WATER METER INSTALLATION AND/OR SANITARY SEWER SERVICE CONNECTION AND PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH THE NCGS 113A 54.1 AND 15A NCAC 4B.0131. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM HTTP://WWW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION_NEW.HTML. IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (910) 433-3300. LEGEND SEEDING SCHEDULE APPLICATION RATES IN POUNDS/ACRE SEED*** PLANTING STRAW TOPDRESSING MIXTURE SEASON LIME* SEED FERTILIZER* MULCH* (LB/AC)* COMMENTS P FEB 15 - APRIL 30 4000 150 1000 4000 700-1000 OF SEPT 1 - OCT 31 10-10-10 60 OF NITROGEN OVERSEED WITH TYPE P SEED MIXTURE TW JAN 1-MAY 1 2000 170 750 4000 DURING NEXT PLANTING SEASON OVERSEED WITH TYPE P SEED MIXTURE TS MAY 1 -AUG 15 2000 40 750 4000 DURING NEXT PLANTING SEASON TF AUG 15 - DEC 30 2000 120 1,000 4000 50 OF OVERSEED WITH TYPE P SEED MIXTURE NITROGEN IN DURING NEXT PLANTING SEASON MARCH * LIME SHALL BE APPLIED AT A MINIMUM OF 2 TONS PER ACRE WITH 3 TONS PER ACRE IN CLAY SOILS. APPLICATION RATES AND/OR CHEMICAL ANALYSIS SHALL BE CONFIRMED OR ESTABLISHED BY SOIL TEST. TACK MULCH BY APPLYING AT 0.10 GAL/YD2 ** FERTILIZER SHALL BE 10-10-10 ANALYSIS. *** SEED MIXTURES TO BE USED ON THE PROJECT SHALL BE AS FOLLOWS: P - PERMANENT SEEDING (LB/AC) TW - TEMPORARY WINTER SEEDING (LB/AC) 150 KY-31 TALL FESCUE 40 GERMAN PEARL OR BROWN TOP MILLET TF - TEMPORARY FALL SEEDING (LB/AC) TS - TEMPORARY SUMMER SEEDING (LB/AC) 120 RYE (GRAIN) 120 RYE GRAIN DURHAM PLANNING GENERAL CONDITIONS OF APPROVAL - LANDSCAPING NOTES: 1. LANDSCAPE MULCH: PINE STRAW SHALL NOT BE USED AS MULCH OR GROUNDCOVER WITHIN TEN FEET OF ANY STRUCTURES CONSISTING OF EXTERIOR COMBUSTIBLE CONSTRUCTION AS SPECIFIED BY DURHAM CITY CODE SECTION 46-87. 2. LANDSCAPING/C.O. STANDARDS NOTE: ALL LANDSCAPING MUST BE IN PLACE PRIOR TO REQUEST FOR A CERTIFICATE OF COMPLIANCE. CONTACT DURHAM CITY COUNTY PLANNING DEPARTMENT SITE COMPLIANCE STAFF FOR INSPECTION 3. LANDSCAPE RE -INSPECTION FEE: EACH LANDSCAPING COMPLIANCE INSPECTION AFTER THE INITIAL INSPECTION WILL INCUR A RE -INSPECTION FEE. PAYMENT MUST BE RECEIVED BY THE DURHAM CITY COUNTY PLANNING DEPARTMENT PRIOR TO RE -INSPECTION. 4. UNDISTURBED LANDSCAPE BUFFERS: 60-FOOT WIDE UNDISTURBED LANDSCAPE BUFFER. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED. 5. CONSTRUCTION IN PRESERVED TREE COVERAGE AREAS (UDO SECTION 8.3): A. PRESERVED TREE COVERAGE AREAS SHALL NOT BE USED FOR ACTIVE RECREATIONAL PURPOSES, EXCEPT FOR WALKING PATHS AND FOOT TRAILS CONSTRUCTED WITH MINIMAL DISTURBANCE OF TREE ROOTS AND EXISTING VEGETATION PROVIDED A REGISTERED ARBORIST HAS CERTIFIED THAT THE CONSTRUCTION OF THE TRAIL HAS BEEN DESIGNED TO MINIMIZE IMPACT TO THE EXISTING TREES. NO TREE OVER 10 INCHES SHALL BE REMOVED FOR THE CONSTRUCTION OF TRAILS. SITE PLAN APPROVAL IS REQUIRED FOR CONSTRUCTION OF TRAILS IN PRESERVED TREE COVERAGE AREAS. B. ALL BUILDINGS SHALL BE SET BACK AT LEAST 10 FEET FROM THE EDGE OF ANY PRESERVED TREE COVERAGE AREA. C. UTILITY LINES AND DRAINAGE CHANNELS SHALL BE MINIMIZED WITHIN THE ROOT PROTECTION ZONES OF THE TREES TO BE SAVED. 6. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE, OR ISSUANCE OF A GRADING PERMIT AND SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: "NO TRESPASSING/TREE PROTECTION AREA/PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ARBOLES." 7. ROOT PROTECTION ZONE EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES OR SIX FOOT RADIUS, WHICHEVER IS GREATER NO DISTURBANCE IS ALLOWED IN THIS AREA. AREA IS TO BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. 8. AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS SILT FENCE AND OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. 9. CONSTRUCTION DRAWINGS AND SITE PLAN APPROVALS FOR THIS PROJECT ON CONTINGENT ON RECEIVING STORMWATER APPROVAL FROM NCDEQ. FAILURE TO OBTAIN APPROVAL FROM THE STATE SHALL NULIFY ANY PREVIOUS CITY OF DURHAM SITE PLAN APPROVALS FOR THE PROJECT. SYMBOLS NEW DEMO EXISTING NEW EXISTING NEW DEMO EXISTING ABBREVIATIONS 8 TEL PIED BUILDING/STRUCTURE -x x x- (RESET/NEW) FENCE ��n'W� APPROXIMATE WOODLINE STREAM ACF ANNUAL CHANCE FLOOD G GAS POWER POLE CONTOUR � \ - YARD PIPING ... SWALE WITH LINING EOP EDGE OF PAVEMENT SS SANITARY SEWER SOIL BORING BITUMINOUS PAVEMENT 302.00 `� MANHOLE STABILIZED OUTLET X302.00 X SPOT ELEVATION ® LOC LIMITS OF CONSTRUCTION W WATER CONCRETE CURB FOR SILT FENCE AND GUTTER PROPERTY LINE � ❑ YARD INLET ® YARD INLET PROTECTION OHE OVERHEAD ELECTRIC R PROPERTY LINE CONCRETE PAD/PAVING OHE OHE OVERHEAD ELECTRIC ❑ ❑ FLARED END SECTION GRAVEL CONSTRUCTION FOC FIBER OPTIC CABLE CL CENTER LINE ENTRANCE i CONCRETE SIDEWALK `" w WATER PIPING LP LIGHT POLE RECM ROLLED EROSION SF SILT FENCE CONTROL MATTING ELECTRIC DUCTBANK STORM DRAIN LINE T UGE UNDERGROUND ELECTRIC --�--`-� WETLANDS TPF l�TpSR�FT PP POWER POLE LOD- PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE Hazren HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 fibLIV 4k> %barton-Smiffi, Inc. CONSTRUCTION GR40LJP WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 PER CITY OF Im; DURHAM SNOW HILL ROAD PUMP STATION PHASE 1 CIVIL NOTES AND LEGEND DATE: HAZEN NO CONTRACT NO.: DRAWING NUMBER: MAY 2020 1 31453-000 01 C1 Qj U = J U- d I / / PIN NO. 0835-04-94-2183 SO�iC��y NOTES: PPHILIPLBDSWEIGART9�TF��ti� ��Q / PIN NO. 0845-03-04-3041 1. CONTRACTOR SHALL FIELD VERIFY THE ELEVATION, D.B. 6122, PG. 242 MATERIAL, AND LOCATION OF ALL EXISTING PARCEL ID NO. 183399 P.B. 84, PG. 45 I F2�F / DURHAM TECH COMMUNITY COLLEGE UTILITIES. ADDRESS: 2318 SNOW HILL ROAD 60' RIGHT-OF-WAY �7 D.B. 1552, PG. 157 2. A TOTAL OF 2.10 ACRES SHALL BE CLEARED. SEE P.B. 121 PG. 142 u'p,. o ADDRESS: 2401 SNOW HILL ROAD N DRAWING C2 FOR EROSION CONTROL MEASURES \ Aj N °) TO BE INSTALLED PRIOR TO TREE CLEARING lb / —288 ACTIVITIES. \ I // SF�F�TF�C 285� _� — 288 1287 3. CONTRACTOR SHALL LIMIT DISTURBANCE TO THE 2p5f AREA SHOWN ON THE DRAWINGS FOR PHASE 1 zp TREE PROTECTION FENCE, TYP PIN NO. 0835-04-84-9140 CLEARING OPERATIONS. PARCEL ID NO. 186001 290 I JUDITH STAFFORD D.B. 7527, PG. 899 _ ADDRESS: 2320 SNOW HILL ROAD EASEMENT ACQUIRED FROM O 285 DURHAM TECH (5.79 AC) f-283 F C/)z 3 28p 2g4 I LIMITS OF DISTURBANCE Zg0 co �nAA N ? 80 00 75 o N I \ 2? O III 1 TEMPORARY STAIRS FOR CONSTRUCTION ACCESS LIMITS OF TREE CLEARING, h� — F II 1 1 30" RCP FES - SEE NOTE 2 INV.:274.76 ` 285 2 m ` 1 / / ^� v ' � v \ \� 100YR I \'\ 7o 274 �yR 00 JURISDICTIONAL WETLAND IMPACTED AREA: HF UG 11 3,860 SF (0.11 AC) SEE NOTE 3 UG 75 �� �` 100YR �\ �z 100YR 100YR - 10 100YR C 100 ` I N 4" DIP SS ` o YR N 2 a SEE NOTE 1 — — — x F F \ ^ooze- 100-YEAR FLOODPLAIN `� (FUTURE CONDITION) le I ::::::::�? ..... rl......................................... ....L.x.........o.......... �?.... \ .......... ........ ............ 1 100YR oy 271 I 1 � � .......10 O1* 100YR 100YR S �� OyF 1 GRAVEL CONSTRUCTION �\ o `� \ Al 1 1 ENTRANCE O,yF �� O 27p I 1 11 C-31-0490 yF = ...... \ o��� o O ti I ` ��,�'� ....... O F o 2g9 I tiF �O \�\� ?T p ,A� \ A• 01* 1 Q F 68 PROPERTY LINE, TYP. I oyF ti OhF / PIN NO. 0845-03-13-5749 \ ` SS 265 PARCEL ID NO. 183395 PIN NO. 0835-04-83-8584 UNITED STATES OF AMERICA � F \ PARCEL ID NO. 186002 1 ATTN: US ARMY CORPS OF ENGINEERS UNITED STATES OF AMERICA I D.B. 1030, PG. 537 o \� / O�� ATTN: US ARMY CORPS OF ENGINE�RS ADDRESS: 2525 SNOW HILL ROAD * PHASE 1 LIMITS OF DISTURBANCE: 2.10 ACRES D.B. 1057, PG. 659 \ DDRESS: 2324 SNOW HILL ROA PLAN 40 20 0 40' SCALE: 1" = 40' SCALE: 1" = 40' PROJECT ENGINEER: B. PORTER DURHAMI DATE: MAY 2020 COUNTY DESIGNED BY: C. WILSON HAZEN No.: 31453-000 DRAWN BY: A. MARCH _�� �� PHASE 1 CONTRACT NO.: 01 CONSTRUCTION ROU P CITY OF CIVIL CHECKED BY: M. SANTOWASSO DURHAM SITE CLEARING DRAWING HAZEN AND SAWYER WHARTON-SMITH, INC. NUMBER: 4011 WESTCHASE BOULEVARD, SUITE 500 5601 77 CENTER DRIVE #120, CHARLOTTE, SNOW HILL ROAD IF THIS BAR DOES NOT 0 1/2" 1" RALEIGH, NORTH CAROLINA 27607 NORTH CAROLINA 28217 - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING LICENSE NO.: C-0381 PUMP STATION C2 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE wwm�� I 1�� I ti � III I N,` O tiF � c O� 1 � I I I I I � I I I I� I �I I I I PIN NO. 0835-04-83-8584 PARCEL ID NO. 186002 UNITED STATES OF AMERICA ATTN: US ARMY CORPS OF ENGINEERS D.B. 1057, PG. 659 ADDRESS: 2324 SNOW HILL ROAD I I I I I I I cM O 0 0 0 N L0 Qj U = J U- d I / / PIN NO. 0835-04-94-2183 So 12,9T/T)' S INV.:274.76 \ 285 \ N: 8538 N: 85382 .8185 \276 I RIPRAP PAD, NCDOT CLASS B, � X � 3.7241 ,L� 20398 3.2241 8' W (UPSTREAM) X DEPTH: 40.500 TH: 0.5 24' W (DOWNSTREAM) X \�� N: 3808.0199 N: 8538. 275 24' L X 1.5' THICK E:2 9863.55 E:20399 890J 1 m 11 / �\ v \ DEP .500 D F Y :2 .500 100YR C-22-0311 R N: 853784.0199 N: 853784.0 99 Too 274 00 �� E: 20398 JURISDICTIONAL 72.8908 E: 203989 .55 y� / � DEPTH:248.500 DEPTH: 00 WETLAND UGC ��`---� �� I 1 / �?T � SS 2 � A,13� ��� a�R LIMITS OF DISTURBANCE 100YR �\ - 10 YR �� 100YR / SILT FENCE OUTLET , TYP UGC ��� 2 5 100�� �� 100YR 100YR C-31-0403 j `,, 0 YR N 2 100-YEAR FLOODPLAIN �� 2 x F F �oo� (FUTURE CONDITION) I:::�? ..... .......... rl......................................... ` ....I..x.........o.......... r?.................... \ SILT BAG, SEE NOTE 3 1 .:::yF` 2 71 1 SILT FENCE , TYP \ o I C-31-0400 17 100YR \ C-31-04 O EXISTING DRIVEWAY TO BE USED 1ooYR 100YR SS.� FOR CONSTRUCTION ACCESS, SEE NOTE 4 .. 'c 271/ GRAVEL CONSTRUCTION \ 1 1 ENTRANCE O \ ` �� + 270 I I 11 C-31-0490 \ O yF � � I yF = yF o \� Q co + J�co / —V O y 14- oco 2609 � I I yF \�\ . \ OyF 1 �......... 0) \ \ I 68 `� OJ PROPERTY LINE, TYP. I oyF ti OhF \ pyF / PIN NO. 0845-03-13-5749 \ ` SS 265 PARCEL ID NO. 183395 PIN NO. 0835-04-83-8584 UNITED STATES OF AMERICA � F \ PARCEL ID NO. 186002 1 ATTN: US ARMY CORPS OF ENGINEERS UNITED STATES OF AMERICA I D.B. 1030, PG. 537 o \� / O�� ATTN: US ARMY CORPS OF ENGINE�RS ADDRESS: 2525 SNOW HILL ROAD * PHASE 1 LIMITS OF DISTURBANCE: 2.38 ACRES D.B. 1057, PG. 659 \ DDRESS: 2324 SNOW HILL ROA ON, PLAN 40 20 0 40' SCALE: 1" = 40' SCALE: 1" = 40' PROJECT ENGINEER: B. PORTER DURHAMI DATE: MAY 2020 COUNTY DESIGNED BY: C. WILSON HAZEN No.: 31453-000 DRAWN BY: A. MARCH _�� �� PHASE 1 CONTRACT NO.: 01 CONSTRUCTION ROU P CITY OF CIVIL DURHAM EROSION AND SEDIMENT CONTROL PLAN DRAWING HAZEN AND SAWYER WHARTON-SMITH, INC. CHECKED BY: M. SANTOWASSO NUMBER: 4011 WESTCHASE BOULEVARD, SUITE 500 5601 77 CENTER DRIVE #120, CHARLOTTE, SNOW HILL ROAD IF THIS BAR DOES NOT 0 1/2" 1" RALEIGH, NORTH CAROLINA 27607 NORTH CAROLINA 28217 - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING LICENSE NO.: C-0381 PUMP STATION C3 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE PARCEL ID NO. 185989 F ,� � NOTES- PARCEL B. SWEIGART I // ��/tip ��Q,S, // PIN NO. 0845-03-04-3041 1. SWALES SHALL BE LINED WITH 20 MIL (MIN) SCRIM D.B. 6122, PG. 242 / Al- q / / REINFORCED OR WOVEN COATED POLYETHYLENE P.B. 84, PG. 45 I F/ PARCEL ID NO. 183399 LINER, SEE DETAIL C-31-0470R. CONTRACTOR �! / DURHAM TECH COMMUNITY COLLEGE ADDRESS: 2318 SNOW HILL ROAD I 60' RIGHT-OF-WAY F�7 D.B. 1552, PG. 157 SHALL ROUTE OFF -SITE CLEAN WATER FLOW FROM P.B. 121 PG. 142 EXISTING CHANNEL AROUND WORK AREA AS 30,. o ADDRESS: 2401 SNOW HILL ROAD N SHOWN ON THE PLANS. N —288 2. EXCAVATION DEPTHS SHOWN ARE TO THE BOTTOM I / N,N, I // �`sF0 tiT / _�288 OF THE FOUNDATION SLAB. APPROXIMATE \ I FtiTF�C I 285 —� _ 1287 / EXCAVATION PIT SHOWN FOR INFORMATION ONLY. zp 2�5 CONTRACTOR SHALL SUBMIT EXCAVATION PLAN PIN NO. 0835-04-84-9140 N, TREE PROTECTION FENCE, TYP PER SPECIFICATION SECTION 31 00 01. PARCEL ID NO. 186001 // / 290 I CONTRACTOR SHALL RELOCATE EXISTING JUDITH STAFFORD/ SANITARY SEWER AS SHOWN ON C4 PRIOR TO D.B. 7527, PG. 899 = / / ADDRESS: 2320 SNOW HILL ROAD \ EXCAVATION ACTIVITIES. O / 285 APPROXIMATE LIMITS OF PUMP �8 283 Z ; PROPOSED EASEMENT TO 0 STATION EXCAVATION PIT 2g4 �4���`1-3. APPROXIMATE LOCATION OF DEWATERING ACTIVITIES SHOWN FOR INFORMATION ONLY. BE ACQUIRED FROM �'I SEE NOTE 2 �— `,d's� CONTRACTOR SHALL SUBMIT DEWATERING \ DURHAM TECH (5.79 AC) \ I I 2$0 CLEAN WATER DIVERSION SWALE PROCEDURES PER SPECIFICATION SECTION 31 23 I .••� SEE NOTE 1 19 ,.n /\ coI C-31-0440R C-31-0470R 4. CONTRACTOR SHALL RESTORE THE GRAVEL ROAD N: 853 4.1866 8538 80 TO ITS EXISTING CONDITION OR BETTER `SS / N: 4.1866 ?9 I I / E:20 878.4741 E:20 12.4741 T TH:245.330 pEPTH 245.330 N: 8538 33.5305 278 I 1 N E:2039 8 .2241 �275 = i o S' I DEPT 240.500 O N E:2039 3.7241 N:8 38 31.0199 TEMPORARY ? O,y _ _ _ DEPTH: 45.330 \ E: 039 12.4741 STOCKPILE AREA F II 1 1 S 30" RCP FES PTH 240 500 a),00 I 10o I y I � III I N,` O �I • � j, I ON 1 � I I I I I I I� I �I I I I PIN NO. 0835-04-83-8584 PARCEL ID NO. 186002 UNITED STATES OF AMERICA ATTN: US ARMY CORPS OF ENGINEERS D.B. 1057, PG. 659 ADDRESS: 2324 SNOW HILL ROAD I I I I I I I m a� m U) U Q Q U) U = U U Q m� m U 2 6 Q o o M o Lo � o cy) N J O w N f`YS C4 M Lo L w v � M Q o� o = J U- d I / / PIN NO. 0835-04-94-2183 So 129T/Ty0 PARCEL ID NO. 185989 F PHILIP B. SWEIGART I // /tiF ��Qy / // PIN NO. 0845-03-04-3041 D.B. 6122, PG. 242 PARCEL ID NO. 183399 P.B. 84, PG. 45 2/F / DURHAM TECH COMMUNITY COLLEGE ADDRESS: 2318 SNOW HILL ROAD 60' RIGHT-OF-WAY �7 D.B. 1552, PG. 157 P.B. 121 PG. 142 3p,. o ADDRESS: 2401 SNOW HILL ROAD / A/F N I / Fq o / —288 � �T \ I // SF� T F C � 285 288 1 287 zp PIN NO. 0835-04-84-9140 o / / 290 I 285 PARCEL ID NO. 186001 / / EXISTING SS CLEANOUT JUDITH STAFFORD _ I //// D.B. 7527, PG. 899 = / // INVERT OUT (E): 272.18 / SEE NOTES 1 AND 2 283_ ADDRESS: 2320 SNOW HILL ROAD Z 285 REROUTED 4" SCH80 PVC 283 I � 3 2g4 2801 N o' III SS / x/ 2j9 19 --- / o O / (co 'k ,`A CLEANOUT, TYP. 278 w00 I N Lo p5 c� `L 275 C-33-0620 X: z 27 4 DIP SS TO BE REMOVED 7\ Oy SEE NOTE 1 F II 1 1 S a),00 I 100 I y I � III I N,` O O� � I I I I I� I II I I �I PIN NO. 0835-04-83-8584 PARCEL ID NO. 186002 I UNITED STATES OF AMERICA ATTN: US ARMY CORPS OF ENGINEERS I D.B. 1057, PG. 659 ADDRESS: 2324 SNOW HILL ROAD I I I I I I I I I I S � / _ 285 X�5 276- EXISTING SS CLEANOUT, TYP. U 2,1(0 X� INVERT IN (NE): 267.50 XY)SL INVERT SEE NOTOUT ES 1( AND22 267.40 275 / / � � \ x � �� 100YR �4 he �\ 70 27 00 2 4 �yR JURISDICTIONAL / ��� _ �� WETLAND UGC I 1 / '®l R GC N \ 0 YR N 2 — — — <oo ..... .. �. j..x. ......o............... .... .. .........- S. �.... .............. .. ....... .... 1 100YR 100Y \ ` \ OyF R 100YR Oy 100YR .... ....... 11 11 OyF pJ�� - yF OyF \ \ .. . F �4�Z- F 1 �O 1 I 1 oyF \ � OyF \\ 1 � I 1 I I \ PIN NO. 0845-03-13-5749 PARCEL ID NO. 183395 PIN NO. 0835-04-83-8584 UNITED STATES OF AMERICA PARCEL ID NO. 186002 ATTN: US ARMY CORPS OF ENGINEERS UNITED STATES OF AMERICA D.B. 1030, PG. 537 ATTN: US ARMY CORPS OF ENGINEERS ADDRESS: 2525 SNOW HILL ROAD D.B. 1057, PG. 659 ADDRESS: 2324 SNOW HILL ROAD I 1 1 ,)I2- 4" DIP SS EXISTING SS MANHOLE INVERT IN (NW): 266.19 ---27o 2g9 ... � Oy F, `o NOTES- 1 . NO INVERTS FROM THE 4" SS WERE RECORDED FROM THE SURVEY; CONTRACTOR SHALL FIELD VERIFY THE ELEVATION, MATERIAL, AND LOCATION OF ALL EXISTING UTILITIES. THE REROUTED 4" SS SHALL TIE INTO THE SAME INVERT ELEVATIONS AT N CLEANOUTS ON THE EXISTING LINE. CONTRACTOR SHALL ENSURE THAT THE 4" SS HAS A MINIMUM 1 % SLOPE AND 3' GROUND COVER. / 2. CONTRACTOR SHALL CORE DRILL OR SAW CUT EXISTING PRECAST MANHOLE WITH OPENING OF SUFFICIENT SIZE TO ACCEPT 4" SCH80 PVC WITH FLEXIBLE RUBBER SLEEVE BOOT AT INDICATED INVERT ELEVATION. SEE DETAIL 733.03 ON DC4. 100YR 100YR 100YR 100-YEAR FLOODPLAIN (FUTURE CONDITION) .; yF 265—� F / 0* \ os SS \ OyF \ Oyu \ / PHASE 1 LIMITS OF DISTURBANCE: 2.38 ACRES PLAN 40 20 0 40' SCALE: 1" = SCALE: 1" = 40' 40' PROJECT ENGINEER: B. PORTER DURHAMI DATE: MAY 2020 COUNTY DESIGNED BY: C. WILSON HAZEN No.: 31453-000 DRAWN BY: A. MARCH en Wharton -Smith, Inc. [f PHASE 1 CONTRACT NO.: 01 CONSTRUCTION ROU P CITY OF CIVIL CHECKED BY: M. SANTOWASSO DURHAM PIPE REROUTING DRAWING HAZEN AND SAWYER WHARTON-SMITH, INC. NUMBER: 4011 WESTCHASE BOULEVARD, SUITE 500 5601 77 CENTER DRIVE #120, CHARLOTTE, SNOW HILL ROAD IF THIS BAR DOES NOT 0 1/2" 1" RALEIGH, NORTH CAROLINA 27607 NORTH CAROLINA 28217 - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING LICENSE NO.: C-0381 PUMP STATION C4 REV ISSUED FOR DATE BY IS NOT TO FULL SCALE a 00 N 0 0 N L0 I I PIN NO. 0835-04-94-2183 PARCEL ID NO. 185989 PHILIP B. SWEIGART D.B. 6122, PG. 242 P.B. 84, PG. 45 ADDRESS: 2318 SNOW HILL ROAD I 60' RIGHT-OF-WAY I \� I \ I PIN NO. 0835-04-84-9140 0 PARCEL ID NO. 186001 JUDITH STAFFORD _ D.B. 7527, PG. 899 = ADDRESS: 2320 SNOW HILL ROAD 0 F U) z \ I I I II \ Oy o \\\ _ F o DEMOLISH FM I \ I I' I II I �I I I I �I PIN NO. 0835-04-83-8584 PARCEL ID NO. 186002 I UNITED STATES OF AMERICA ATTN: US ARMY CORPS OF ENGINEERS I D.B. 1057, PG. 659 ADDRESS: 2324 SNOW HILL ROAD I I I I I I I I I I �T O-� c Y �FR O,c T 3 ./ 0A / F9S�iLj0 / UTILITY VAULTS LO LOD UTILITY POLE TO BE RELOCATED `O / ' 30" RCP FES 1 SS INV.:274.76 0')00 N w N 285 zp 290 1 09 fPHALT PARKING LOT FOR RHAM TECH COMMUNITY LLEGE CATCH BAS 4" SCH.80 PVC SS (101 v 285 0 `t &v J TREE CLEARING, TYP. �� `. `. `.�"'J� JURISDICTIONAL WETLAND IMPACTED BY PHASE 1 �5 A v v v v X / WATER VALVE, TYP. 274 00 JURISDICTIONAL WETLAND v `. `. ��� \ ABANDON APPROX. 335 FT OF 24" SS IN PLACE SEE NOTES 2 AND 3 IMPACTED AREA: V C s. """"`-'4 \\ 11 1755 SF (0.05 AC) 27 S ., 1 v v v I v`� ABANDON APPROX. 420 FT OF UGC/UGT, / GRAVEL ACCESS ROAD UGC 390 FT OF 3" WATER IN PLACE, AND o 380 FT OF 20" FM IN PLACE o YR rN 2 I J \\SEE NOTES 2 AND 3 --- `" F F a �e b ................ .... ...� ................. ;x .6 ......... . 1 100YR O� ------ 100YR OyF 100YR 100YR I 1 QO �� \ \ 1 1 Oy ,� \ ..... 1 1 F OJ Off. coo�r�4�1.. . 0 .. . C� 11 \ \ O'S'F `\ r:::.... . �YF \ O'S'F \ F 1 �O 1 \ \ 1 \I 1 I \ \ 1 1 I I I PIN NO. 0835-04-83-8584 PARCEL ID NO. 186002 UNITED STATES OF AMERICA ATTN: US ARMY CORPS OF ENGINEERS D.B. 1057, PG. 659 ADDRESS: 2324 SNOW HILL ROAD I 1 1 PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE 01* PIN NO. 0845-03-13-5749 \ PARCEL ID NO. 183395 UNITED STATES OF AMERICA ATTN: US ARMY CORPS OF ENGINEERS D.B. 1030, PG. 537 ADDRESS: 2525 SNOW HILL ROAD PLAN SCALE: 1" = 40' NOTES: PIN NO. 0845-03-04-3041 1. CONTRACTOR SHALL FIELD VERIFY THE ELEVATION, PARCEL ID NO. 183399 MATERIAL, AND LOCATION OF ALL EXISTING DURHAM TECH COMMUNITY COLLEGE UTILITIES. D.B. 1552, PG. 157 P.B. 1 5 PG. 12. EXISTING PUMP STATION TO REMAIN IN OPERATION ADDRESS: 2401 SNOW HILL ROAD N UNTIL COMPLETION OF NEW PUMP STATION. SEE SPECIFICATIONS FOR THE DEMOLITION PHASING OF —288 287 —288 THE EXISTING PUMP STATION. - /13. CONTRACTOR SHALL USE A CEMENTITIOUS 2�5 FLOWABLE FILL FOR ALL PIPES TO BE ABANDONED. 285 SEE SPECIFICATION 31-23-24. � 288 — �283— —283 280 — 2j9 275 \� 100YR 'oo Y,Q � 00 40 \4 o0 .2 CIO \ \ \ <Oo 271 278 2?7 wo �276 275 11 i]Gl � UO1 \ 100-YEAR FLOODPLAIN (FUTURE CONDITION) 100YR "_ 100YR - 100YR — 100YR 100YR TREE CLEARING, TYP. REMOVE MANHOLE, TYP. REMOVE 8" PVC DEMOLISH EXISTING PUMP STATION, GRAVEL ROAD, FENCE, AND CONNECTING UTILTIES, SEE NOTE 2 ........... Oy,, TRANSMISSION TOWER � \ ............. . W/ OVERHEAD LINES, TYP \ 266 \ i PROPERTY LINE, TYP. \ 0* \ OyF \ \ Oy, en Wharton-Smiffi, Inc. CONSTRUCTION GROUP P HAZEN AND SAWYER WHARTON-SMITH, INC. 4011 WESTCHASE BOULEVARD, SUITE 500 5601 77 CENTER DRIVE #120, CHARLOTTE, RALEIGH, NORTH CAROLINA 27607 NORTH CAROLINA 28217 LICENSE NO.: C-0381 CITY OF DURHAM \11'es SNOW HILL ROAD PUMP STATION ENE SCALE: 1" = 40' PHASE 2 CIVIL EXISTING CONDITIONS AND DEMOLITION PLAN DATE: MAY 2020 HAZEN NO.: 31453-000 CONTRACT NO.: 01 DRAWING NUMBER: C5 a 0 M 0 0 N N f6 a U) U J = Q Q m a ❑i } a 00 O c, A o Lo C) co co NO J N M L0 �w v M 0 o� o — J LL d I / I / I I / I / / M / I / w / w / w 5 / 287 285 \' / 8 1\ ?88 TREE PROTECTION FENCE, TYP 283 C-31-0404 283 N �g`L -_ APPROXIMATE LIMITS OF PUMP STATION EXCAVATION PIT BY OTHERS (PHASE 1) / \ . TPF TPF $ TPF TPF L TPF / I �280 II — CLEAN WATER DIVERSION SWALE (TS-3) ❑ / Rb 0'*= - - - �A — C-31-0440R C-31-0470R $ 278 -n Aou) LOD LOD \ \ I 1 OS N I � 275 D OD D // �� Ln � N TEMPORARY O \ STOCKPILE AREA I / SEE NOTE 2 07 0 0 S — -- -- n QOl RIPRAP PAD, NCDOT CLASS B, 285 1 8' W (UPSTREAM) X J� I ❑ O I J _ 24' W (DOWNSTREAM) X 24' L X 1.5' THICK 71 0o IN 7��Y I Gci 2 S yS / C-22-0311 R o o _n o I JACK AND BORING LOCATION `\ o LL O 11 m 1 \ \` \ F/ PF F F P F/ PF / F F�PF_ I JURISDICTIONAL WETLAND 6 O O a O a O GM IMPACTED BY PHASE 1 100Y /o R oyR 274� Too LIMITS OF DISTURBANCE 274 oyR F UGT /\` \♦ Fz \` Y� I 11 JURISDICTIONAL WETLAND /UGT IO p / Oh \ \\ 1 \ �2T5 100-YEAR FLOODPLAIN \\\ OYR 100YR 100YR YR 100YR = � 100YR F UGT \ `\ 1 2'l3°yam �00 (FUTURE CONDITION) `\ 100 ❑-n I �` I 27 S �O Ir 1 SILT FENCE OUTLET , TYP o❑ I X .... 1 C-31-0403 .. tiF... ........... \ \ \ �'��� 2 irpF d O `\ \ NOTES „ \ ` 1. p, ........ ........................ \ sF S \ I i / O F �O 1. CONTRACTOR SHALL RESTORE THE EXISTING -1.......x........... ............... o SILT BAG E N 3 ► `� SILT FENCE, TYP \ \ O d�%s \\ GRAVEL ROAD TO ITS EXISTING CONDITIONS OR o ^ F \\ � 10 \� \\ SF�� C-31-0417 \ D 271 BETTER. SEE DETAIL C 32-0570 ❑ cn C-31-0400 F T. 01* 100YR `SF \ �\ O 2. ALL EXCESS CUT MATERIAL SHALL BE REMOVED x EXISTING DRIVEWAY TO BE USED 100YR \ o FROM THE PROJECT SITE TO AN OFFSITE, \ �c CONCRETE WASHOUT 1 \ F \ \ \ FOR CONSTRUCTION ACCESS SEE DETAIL ON DC1 YR .....� S,c \ \ PERMITTED LOCATION. \ I SEE NOTE 1 R \ loot' \ \\ ,� 1 /` co I \ \ I I GRAVEL CONSTRUCTION O,y� R \ S,c \ 271 \ C, I � 1 ENTRANCE, TYP. 1 \\\ \\ I \ 27p \II D 11 1 C-31-0490 \ cn \ O \O \ 0* \ \ C I II \ \ m 'SF II \ OyF \01* / 69 I 1 OtiF \ .......... \ y I F F � \ \ \\ \4U\ o S 68 I I \ \ \ \ OtiF01* `\ I PLAN SCALE: 1" = 30' PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE / N 285 i 290 a°S 285 O LOD � L D II I EASEMENT LIMITS III I It. en HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 %harton-Sm1h, Inc. CONSTRUCTION GROLJP WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 I N CITY OF DURHAM SNOW HILL ROAD PUMP STATION DATE: MAY 2020 HAZEN NO.: 31453-000 PHASE 2 CIVIL CONTRACT NO.: 01 EROSION AND SEDIMENT CONTROL PLAN DRAWING NUMBER: C6 a L0 N 0 N O N L0 J = U U < a � 2 m a o� } a 00 o d (D c) A o L �o co NO J N A L0 Lo v M 0 o� o = J U- d 70, y R I I O II tiF = I c I � 36" STEEL CASING PIPE I I II 0 O o J (10-1 -WAY 4" SCH. 80 PVC SS. t�� w-m���7����� t i ODOR CONTROL - ELECTRICAL GENERATOR CHEMICAL TANK ao� ao� 100YR �� 1poyR 100-YEAR FLOODPLAIN INV.. 272.50 � 17 LF42 DIP \� \ \ (FUTURE CONDITION) / F \\ �. ♦\ \�\ 3 PW w O \�\ ABANDON 4" SS 70, BFE: 272.9' 90yR , �o \ / �\ BACKFLOW 1 \ \ �� • PREVENTION `\� 5 11 11 JURISDICTIONAL \\ DEVICE EX. SS CLEANOUT \\\�\� \ 7��yR I\ 1 WETLAND �VG\\` -. INV..273.75 �L T SS \\ 1 ISOLATION INV. IN (N): 267.50 10,114 I I SS MH 6 �Op \ 1 VALVE INV. OUT (SE): 267.40 \ 100YR F 12" FM VGT \\\ 1 �F'L SEE NOTE 1 \\ 1 � RIM:274.81 \ FM MANHOLE � \ \ INV IN: 252.88 1 Op NEW TREELINE INV.: 26222' I 1 24" SS $ \\ 1 INV IN: 253.62 \\ -I - 1 �100� ` \ \ INV OUT: 252.78 �°°yam 4O \\� .......................... 17777o tiF .............................. EX. SS MH \� \ �`• \ O 1 O \� �....... INV. IN (NW): 261.39' /P \ .... .... .. ........ INV. OUT (SE): 261.39' ........ \ lQ O x........... ............... ... o0 ... . FM TO TIE INTO EXISTING 12" FM 1ooYR \\ > \ INV.:262.22' �10 SSMH4 \ O D ... 1 - 100YR RIM: 274.36 O d 100YR \ 0* - 100YR INV IN: 261.25 O � \ m 1 TIQT/'6tJT:Q&J 1� \ I F 100YR \ O O \ SSMH5 YR \ 61 RIM: 274.59 \\\ I 20" FM CAP INV IN: 260.13 oy� 1pOyR \ INV IN: 268.55 \ o I PROCESS PIPE, UNKNOWN DIAMETER 1 otiF INV OUT: 260.03 ooyR \\ Ov \ SEE NOTE 1 \ \\ C I � � oyF \ ,o .......... boo � • \\ m * \ O � OO.YR. ..... \\ I II ^ I �\ \ o I\ ...... \ 1 01* \ \ \ ^ I I \ \ \ ......... \ 1 01*........ \\\ I / / / / / / / / I^ / I / I SS I -� AA// aS I W / // TRANSFORMER W D O LOD L D / ELECTRICAL \` / DUCTBANK,TYP. ° 18" RCP CULVERT 4' STORM MH INV.:273.10 INV.:273.50 \ LOD LOD LOD I OcI I a CW fl o $ 1/0 12' x 12' FLOW METER AND BYPASS 3„ TW ° \ / SEE DRAWING M140 4 1 2" HVV II o 10'ARVVAULT AND -J-- / 1 PIGGING STATION ° 1 \\ CONNECTION o PUMP o L D \ SEE DRAWING M140 II =� LSTATION OD �/ 10" FA o INV.: 272.25 JURISDICTIONAL WETLAND � OD i IMPACTED BY PHASE 1 G 1 O �� \ 20" FM D 1 11 \ / / �V 15" RCP STORM DRAIN CHEMICAL PIPE TRENCH INV.: 274.5 ° 1 30" RCP STORM DRAIN / �\ l \ „I r 1 \ otiF \ oyF \ \ 1 \ oy F PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE en HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 c� SSMH2 RIM: 268.89 INV IN: 265.04 INV IN: 266.19 INV OUT: 264.94 SSMH3 RIM: 270.84 INV IN: 254.92 INV IN: 255.49 INV OUT: 254.82 SS MH 1 RIM: 270.27 INV IN: 255.39 INV OUT: 255.29 EXISTING 12" SS O'yF $ ......... \ \ . ......... O \\ \ \ tiF \\\ \ PLAN SCALE: 1" = 30' Wharton-Smiffi, Inc. CONSTRUCTION GROUP WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 CITY OF DURHAM \11'es SNOW HILL ROAD PUMP STATION NOTES: 1. CONTRACTOR SHALL FIELD VERIFY THE ELEVATION, MATERIAL, AND LOCATION OF ALL EXISTING UTILITIES. 2. CONTRACTOR SHALL CORE DRILL OR SAW CUT EXISTING PRECAST MANHOLE WITH OPENING OF SUFFICIENT SIZE TO ACCEPT 4" SCH80 PVC AT INDICATED INVERT ELEVATION. SEE DETAIL 733.03 ON DC4. 1"=30'-0" PHASE 2 CIVIL OVERALL YARD PIPING PLAN I.7G1190 HAZEN NO CONTRACT NO.: DRAWING NUMBER: MAY 2020 1 31453-000 01 C7 a 0 M 0 N 0 N L0 J = � U U < a 5 m a ci } a 00 o d o� A o LoC;r5 �o co NO J N A L0 Lw v M 0 o� o U- a I 60' RIGHT-OF-WAY I 0 J J 0 z U) \ ® I 0 O J Ham 1pp c REV 111 I' I II �III ,I, /T '9TF O�c T OA %c 288 1287 " w-- / / TRANSFORMER N TRANSFORMER 285 283- -283 r�✓ W EASEMENT LIMITS 28 0� \28o, / I ASPHALT DRIVEWAY N --------- ---- ------ -- C-32-0550 BYPASS VALVE ODOR CONTROL II / FIFE: 278.00 ??g / LIMITS OF �, �� h0� DISTURBANCE, TYP 12' x 12' FLOW METER I �'S `1' N ' / 10' ARV VAULT AND � 1 278 D LO LOD PIGGING STATIONLo N 7 ELEC GENERATOR PAD CONNECTION FIFE: 278.00 FUTURE OVERFLOW SEE DRAWING M140 / CONTAINMENT BASIN AREA 1 Lp 290 285 PIN NO. 0845-03-04-3041 PARCEL ID NO. 183399 DURHAM TECH COMMUNITY COLLEGE D.B. 1552, PG. 157 P.B. 121 PG. 142 ADDRESS: 2401 SNOW HILL ROAD 288 285 PUMP STATION PAD: 278.00 ­-280-, 1 1 C \ I o 'Q L-- ------------- - - - - - - - - - - - - - - - - - - 1 m 11 //\� _tom 2� ��' Q �� 100YR � , 14 00 JURISDICTIONAL��� �� R /• WETLAND \ / Z� 6" BOLLARD, TYP. UGC 24" SLIDE GATE \ p C-32-0540• I 1/ 4\SEE DETAIL PS-05.01 \ 5 �j ��` 100YR X X X 2� N � x y m............. .,�.: r,. I .. ......r?�.... j .x..........6.. iL.......................................... �'�� JURISDICTIONAL WETLAND N D .......... IMPACTED BY PHASE 1 271 � po 1 100YR r 100YR i x OyF 100YR % 100YR I 1 sr 271 Al 270 1 1 � r II \ 'yc� 0 1 OtiF � \ SEE NOTE 1i 269 PIN NO. 0835-04-83-8584 O'SF PARCEL ID NO. 186002 UNITED STATES OF AMERICA A �. \ ATTN: US ARMY CORPS OF ENGINEERS ........... D.B. 1057, PG. 659 \ �� �� ADDRESS: 2324 SNOW HILL ROAD Q \ \ \ OtiF \ Oh%c \� 68 O M � tiF '2616- 1 � � IPIN NO 0845-03-13-5749 10 YR 100YR I 100YR � 100-YEAR FLOODPLAIN (FUTURE CONDITION) BFE: 272.9' PARCEL ID NO. 183395 I PIN NO. 0835-04-83-8584 UNITED STATES OF AMERICA I PARCEL ID NO. 186002 ATTN: US ARMY CORPS OF ENGINEERS \ Ohio UNITED STATES OF AMERICA D.B. 1030, PG. 537 ATTN: US ARMY CORPS OF ENGINEERS ADDRESS: 2525 SNOW HILL ROAD 0* \ D.B. 1057, PG. 659 \ �� ADDRESS: 2324 SNOW HILL ROAD \ I y \ I 1 of PLAN SCALE: 1" = 40' PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING ISSUED FOR DATE BY IS NOT TO FULL SCALE - e HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 Wharton-Smiffi, Inc. CONSTRUCTION GROUP WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 CITY OF DURHAM \11'es SNOW HILL ROAD PUMP STATION i 265 NOTES: 1. SEED AREA WITHIN FLOODPLAIN WITH RIPARIAN SEED MIX PER DRAWING C1. SCALE: 1" = 40' PHASE 2 CIVIL OVERALL SITE PLAN DATE: MAY 2020 HAZEN NO.: 31453-000 CONTRACT NO.: 01 DRAWING NUMBER: M 0 0 0 0 N r a� co U Of Q Q co U J = U C)< Q Q m Qm o d o� co Lo �o co NC7 J N M � Lo w v � o o� 4io _ J L.L d 270 260 250 -0+50 0+00 0 ti LL _ O �X SSMH6 1---'RIM:274.81 INV IN: 252.88 0° O`Q X INV IN: 253.62 INV OUT: 252.78 p �O F � O 71PROJECT ENGINEER: DESIGNED BY: DRAWN BY: CHECKED BY: IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE N N N CN 00 00 N N Cfl Lo co N Lo N O 0, � Lo Lo N O CM Lo CN Lo N Z Z oO N N Z =O coZ c Z Z Z co coof Z Z Z O w z O U O 258 LF 4 " DI @ 0 75% a a 1+00 2+00 42" DIP PROFILE HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1"=3' LOD LOD 258 LF 42" DIP 3+00 c 280 280 270 270 260 260 250 3+50 )7( 250 -0+50 m N N coN Cfl Lo Lo Ln a0 co ORCfl N N N Lo M N = O O N H LO = � N N Z CO = Nt N NZZ N � � OfZ � � Z Z Z Z 20 LF 24" DIP 5.00/o A@ 0 I I 0+00 1+00 24" DIP PROFILE HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1"=3' a SS MH 3 v a 0 a 0 RIM: 270.84 LF 24" DlF \� 117 L 4" DIP a INV IN: 254.92 \ ��v • u- INV IN: 255.49 J X coINV OUT: 254.82 SS MH 4 OHE -SS MH 5 RIM:274.36 RIM:274.59 OHE ;A It INV IN: 261.25 INV IN: 260.13 \� INV OUT: 261.15 INV IN: 268.55 X 74— �SS MH 1 1R INV OUT: 260.03 �SS MH 6 `L RIM: 270.27 RIM: 274.81 INV IN: 255.39 \ INV IN: 252.88 \ CINV OUT: 255.29 Oy INV IN: 253.62 INV OUT: 252.78� PLAN PLAN SCALE: 1" = 30' SCALE: 1" = 30' B. PORTER C. WILSON A. MARCH C. WILSON 0 1/2" 1" Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 fh."II1vl Ak>Wharton-Smiffi, Inc. CONSTRUCTION GROUP WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 CITY OF 'Im; DURHAM SNOW HILL ROAD PUMP STATION 270 260 250 2+00 PHASE 2 CIVIL GRAVITY SEWER PROFILES DATE: MAY 2020 HAZEN NO.: 31453-000 CONTRACT NO.: 01 DRAWING NUMBER: C9 a N N D N PR cl) ai m a� m U) U ry Q Q n a� m U U 0 = ::� U ry U Q a co i m 0 U 75; o Q D D co D co ND J N A Lo Low v M 0 o�_ 4io J u- d GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT IMPLEMENTING THE DETAILS AND SPECIFICATIONS ON THIS PLAN SHEET WILL RESULT IN THE CONSTRUCTION ACTIVITY BEING CONSIDERED COMPLIANT WITH THE GROUND STABILIZATION AND MATERIALS HANDLING SECTIONS OF NCG01 CONSTRUCTION GENERAL PERMIT (SECTIONS E AND F, RESPECTIVELY). THE PERMITTEE SHALL COMPLY WITH THE EROSION AND SEDIMENT CONTROL PLAN APPROVED BY THE DELEGATED AUTHORITY HAVING JURISDICTION. ALL DETAILS AND SPECIFICATIONS SHOWN ON THIS SHEET MAY NOT APPLY DEPENDING ON SITE CONDITIONS AND THE DELEGATED AUTHORITY HAVING JURISDICTION. SECTION E: GROUND STABILIZATION REQUIRED GROUND STABILIZATION TIMEFRAMES STABILIZE WITHIN THIS SITE AREA DESCRIPTION MANY CALENDAR DAYS TIME FRAME VARIATIONS AFTER CEASING LAND DISTURBANCE (A) PERIMETER DIKES, SWALES, DITCHES, AND 7 NONE PERIMETER SLOPES (B) HIGH WATER QUALITY (HQW) ZONES 7 NONE IF SLOPES ARE 10' OR LESS IN (C) SLOPES STEEPER 7 LENGTH AND ARE NOT STEEPER THAN 3:1 THAN 2:1, 14 DAYS ARE ALLOWED -7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH AND WITH SLOPES STEEPER THAN 4:1 (D) SLOPES 3:1 TO 4:1 14 -7 DAYS FOR PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND HQW ZONES -10 DAYS FOR FALLS LAKE WATERSHED -7 DAYS FOR PERIMETER DIKES, SWALES, DITCHES, PERIMETER (E) AREAS WITH SLOPES 14 SLOPES, AND HQW ZONES FLATTER THAN 4:1 -10 DAYS FOR FALLS LAKE WATERSHED UNLESS THERE IS ZERO SLOPE NOTE: AFTER THE PERMANENT CESSATION OF CONSTRUCTION ACTIVITIES, ANY AREAS WITH TEMPORARY GROUND STABILIZATION SHALL BE CONVERTED TO PERMANENT GROUND STABILIZATION AS SOON AS PRACTICABLE BUT IN NO CASE LONGER THAN 90 CALENDAR DAYS AFTER THE LAST LAND DISTURBING ACTIVITY. TEMPORARY GROUND STABILIZATION SHALL BE MAINTAINED IN A MANNER TO RENDER THE SURFACE STABLE AGAINST ACCELERATED EROSION UNTIL PERMANENT GROUND STABILIZATION IS ACHIEVED. GROUND STABILIZATION SPECIFICATION STABILIZE THE GROUND SUFFICIENTLY SO THAT RAIN WILL NOT DISLODGE THE SOIL. USE ONE OF THE TECHNIQUES IN THE TABLE BELOW: TEMPORARY STABILIZATION PERMANENT STABILIZATION • TEMPORARY GRASS SEED COVERED • PERMANENT GRASS SEED COVERED WITH WITH STRAW OR OTHER MULCHES AND STRAW OR OTHER MULCHES AND TACKIFIERS TACKIFIERS • HYDROSEEDING • GEOTEXTILE FABRICS SUCH AS • ROLLED EROSION CONTROL PRODUCTS PERMANENT SOIL REINFORCEMENT WITH OR WITHOUT TEMPORARY GRASS MATTING SEED • HYDROSEEDING • APPROPRIATELY APPLIED STRAW OR • SHRUBS OR OTHER PERMANENT OTHER MULCH PLANTINGS COVERED WITH MULCH • PLASTIC SHEETING • UNIFORM AND EVENLY DISTRIBUTED GROUND COVER SUFFICIENT TO RESTRAIN EROSION . STRUCTURAL METHODS SUCH AS CONCRETE, ASPHALT OR RETAINING WALLS • ROLLED EROSION CONTROL PRODUCTS WITH GRASS SEED POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. SELECT FLOCCULANTS THAT ARE APPROPRIATE FOR THE SOILS BEING EXPOSED DURING CONSTRUCTION, SELECTING FROM THE INC DWR LIST OF APPROVED PAMS/FLOCCULANTS. 2. APPLY FLOCCULANTS AT OR BEFORE THE INLETS TO EROSION AND SEDIMENT CONTROL MEASURES. 3. APPLY FLOCCULANTS AT THE CONCENTRATIONS SPECIFIED IN THE INC DWR LIST OF APPROVED PAMS/FLOCCULANTS AND IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 4. PROVIDE PONDING AREA FOR CONTAINMENT OF TREATED STORMWATER BEFORE DISCHARGING OFFSITE. 5. STORE FLOCCULANTS IN LEAK -PROOF CONTAINERS THAT ARE KEPT UNDER STORM -RESISTANT COVER OR SURROUNDED BY SECONDARY CONTAINMENT STRUCTURES. PROJECT ENGINEER: DESIGNED BY: 11101:L'Viyj01 y,I EQUIPMENT AND VEHICLE MAINTENANCE 1. MAINTAIN VEHICLES AND EQUIPMENT TO PREVENT DISCHARGE OF FLUIDS. 2. PROVIDE DRIP PANS UNDER ANY STORED EQUIPMENT. 3. IDENTIFY LEAKS AND REPAIR AS SOON AS FEASIBLE, OR REMOVE LEAKING EQUIPMENT FROM THE PROJECT. 4. COLLECT ALL SPENT FLUIDS, STORE IN SEPARATE CONTAINERS AND PROPERLY DISPOSE AS HAZARDOUS WASTE (RECYCLE WHEN POSSIBLE). 5. REMOVE LEAKING VEHICLES AND CONSTRUCTION EQUIPMENT FROM SERVICE UNTIL THE PROBLEM HAS BEEN CORRECTED. 6. BRING USED FUELS, LUBRICANTS, COOLANTS, HYDRAULIC FLUIDS AND OTHER PETROLEUM PRODUCTS TO A RECYCLING OR DISPOSAL CENTER THAT HANDLES THESE MATERIALS. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. NEVER BURY OR BURN WASTE. PLACE LITTER AND DEBRIS IN APPROVED WASTE CONTAINERS. 2. PROVIDE A SUFFICIENT NUMBER AND SIZE OF WASTE CONTAINERS (E.G DUMPSTER, TRASH RECEPTACLE) ON SITE TO CONTAIN CONSTRUCTION AND DOMESTIC WASTES. 3. LOCATE WASTE CONTAINERS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. 4. LOCATE WASTE CONTAINERS ON AREAS THAT DO NOT RECEIVE SUBSTANTIAL AMOUNTS OF RUNOFF FROM UPLAND AREAS AND DOES NOT DRAIN DIRECTLY TO A STORM DRAIN, STREAM OR WETLAND. 5. COVER WASTE CONTAINERS AT THE END OF EACH WORKDAY AND BEFORE STORM EVENTS OR PROVIDE SECONDARY CONTAINMENT. REPAIR OR REPLACE DAMAGED WASTE CONTAINERS. 6. ANCHOR ALL LIGHTWEIGHT ITEMS IN WASTE CONTAINERS DURING TIMES OF HIGH WINDS. 7. EMPTY WASTE CONTAINERS AS NEEDED TO PREVENT OVERFLOW. CLEAN UP IMMEDIATELY IF CONTAINERS OVERFLOW. 8. DISPOSE WASTE OFF -SITE AT AN APPROVED DISPOSAL FACILITY. 9. ON BUSINESS DAYS, CLEAN UP AND DISPOSE OF WASTE IN DESIGNATED WASTE CONTAINERS. PAINT AND OTHER LIQUID WASTE 1. DO NOT DUMP PAINT AND OTHER LIQUID WASTE INTO STORM DRAINS, STREAMS OR WETLANDS. 2. LOCATE PAINT WASHOUTS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. 3. CONTAIN LIQUID WASTES IN A CONTROLLED AREA. 4. CONTAINMENT MUST BE LABELED, SIZED AND PLACED APPROPRIATELY FOR THE NEEDS OF SITE. 5. PREVENT THE DISCHARGE OF SOAPS, SOLVENTS, DETERGENTS AND OTHER LIQUID WASTES FROM CONSTRUCTION SITES. PORTABLE TOILETS 1. INSTALL PORTABLE TOILETS ON LEVEL GROUND, AT LEAST 50 FEET AWAY FROM STORM DRAINS, STREAMS OR WETLANDS UNLESS THERE IS NO ALTERNATIVE REASONABLY AVAILABLE. IF 50 FOOT OFFSET IS NOT ATTAINABLE, PROVIDE RELOCATION OF PORTABLE TOILET BEHIND SILT FENCE OR PLACE ON A GRAVEL PAD AND SURROUND WITH SAND BAGS. 2. PROVIDE STAKING OR ANCHORING OF PORTABLE TOILETS DURING PERIODS OF HIGH WINDS OR IN HIGH FOOT TRAFFIC AREAS. 3. MONITOR PORTABLE TOILETS FOR LEAKING AND PROPERLY DISPOSE OF ANY LEAKED MATERIAL. UTILIZE A LICENSED SANITARY WASTE HAULER TO REMOVE LEAKING PORTABLE TOILETS AND REPLACE WITH PROPERLY OPERATING UNIT. EARTHEN STOCKPILE MANAGEMENT 1. SHOW STOCKPILE LOCATIONS ON PLANS. LOCATE EARTHEN -MATERIAL STOCKPILE AREAS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS, SEDIMENT BASINS, PERIMETER SEDIMENT CONTROLS AND SURFACE WATERS UNLESS IT CAN BE SHOWN NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. 2. PROTECT STOCKPILE WITH SILT FENCE INSTALLED ALONG TOE OF SLOPE WITH A MINIMUM OFFSET OF FIVE FEET FROM THE TOE OF STOCKPILE. 3. PROVIDE STABLE STONE ACCESS POINT WHEN FEASIBLE. 4. STABILIZE STOCKPILE WITHIN THE TIMEFRAMES PROVIDED ON THIS SHEET AND IN ACCORDANCE WITH THE APPROVED PLAN AND ANY ADDITIONAL REQUIREMENTS. SOIL STABILIZATION IS DEFINED AS VEGETATIVE, PHYSICAL OR CHEMICAL COVERAGE TECHNIQUES THAT WILL RESTRAIN ACCELERATED EROSION ON DISTURBED SOILS FOR TEMPORARY OR PERMANENT CONTROL NEEDS. B. PORTER C. WILSON A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING REV ISSUED FOR DATE By IS NOT TO FULL SCALE 0 I OF SANDBAGS (TYP.) OR STAPLE SILT FENCE 1:1 SIDE SLOPES (TYF CLEARLY MARKED SIGNAGE NOTING DEVICE (18" X 24" MIN.) SECTION A -A ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CONCRETE I NOTES: WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD CONCRETE WASHOUTS AND BAGS (TYP.) R STAPLES I MIL PLASTIC LINING 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE 1. DO NOT DISCHARGE CONCRETE OR CEMENT SLURRY FROM THE SITE. 2. DISPOSE OF, OR RECYCLE SETTLED, HARDENED CONCRETE RESIDUE IN ACCORDANCE WITH LOCAL AND STATE SOLID WASTE REGULATIONS AND AT AN APPROVED FACILITY. 3. MANAGE WASHOUT FROM MORTAR MIXERS IN ACCORDANCE WITH THE ABOVE ITEM AND IN ADDITION PLACE THE MIXER AND ASSOCIATED MATERIALS ON IMPERVIOUS BARRIER AND WITHIN LOT PERIMETER SILT FENCE. 4. INSTALL TEMPORARY CONCRETE WASHOUTS PER LOCAL REQUIREMENTS, WHERE APPLICABLE. IF AN ALTERNATE METHOD OR PRODUCT IS TO BE USED, CONTACT YOUR APPROVAL AUTHORITY FOR REVIEW AND APPROVAL. IF LOCAL STANDARD DETAILS ARE NOT AVAILABLE, USE ONE OF THE TWO TYPES OF TEMPORARY CONCRETE WASHOUTS PROVIDED ON THIS DETAIL. 5. DO NOT USE CONCRETE WASHOUTS FOR DEWATERING OR STORING DEFECTIVE CURB OR SIDEWALK SECTIONS. STORMWATER ACCUMULATED WITHIN THE WASHOUT MAY NOT BE PUMPED INTO OR DISCHARGED TO THE STORM DRAIN SYSTEM OR RECEIVING SURFACE WATERS. LIQUID WASTE MUST BE PUMPED OUT AND REMOVED FROM PROJECT. 6. LOCATE WASHOUTS AT LEAST 50 FEET FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. AT A MINIMUM, INSTALL PROTECTION OF STORM DRAIN INLET(S) CLOSEST TO THE WASHOUT WHICH COULD RECEIVE SPILLS OR OVERFLOW. 7. LOCATE WASHOUTS IN AN EASILY ACCESSIBLE AREA, ON LEVEL GROUND AND INSTALL A STONE ENTRANCE PAD IN FRONT OF THE WASHOUT. ADDITIONAL CONTROLS MAY BE REQUIRED BY THE APPROVING AUTHORITY. 8. INSTALL AT LEAST ONE SIGN DIRECTING CONCRETE TRUCKS TO THE WASHOUT WITHIN THE PROJECT LIMITS. POST SIGNAGE ON THE WASHOUT ITSELF TO IDENTIFY THIS LOCATION. 9. REMOVE LEAVINGS FROM THE WASHOUT WHEN AT APPROXIMATELY 75% CAPACITY TO LIMIT OVERFLOW EVENTS. REPLACE THE TARP, SAND BAGS OR OTHER TEMPORARY STRUCTURAL COMPONENTS WHEN NO LONGER FUNCTIONAL. WHEN UTILIZING ALTERNATIVE OR PROPRIETARY PRODUCTS, FOLLOW MANUFACTURER'S INSTRUCTIONS. 10. AT THE COMPLETION OF THE CONCRETE WORK, REMOVE REMAINING LEAVINGS AND DISPOSE OF IN AN APPROVED DISPOSAL FACILITY. FILL PIT, IF APPLICABLE, AND STABILIZE ANY DISTURBANCE CAUSED BY REMOVAL OF WASHOUT. HERBICIDES, PESTICIDES AND RODENTICIDES 1. STORE AND APPLY HERBICIDES, PESTICIDES AND RODENTICIDES IN ACCORDANCE WITH LABEL RESTRICTIONS. 2. STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN THEIR ORIGINAL CONTAINERS WITH THE LABEL, WHICH LISTS DIRECTIONS FOR USE, INGREDIENTS AND FIRST AID STEPS IN CASE OF ACCIDENTAL POISONING. 3. DO NOT STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN AREAS WHERE FLOODING IS POSSIBLE OR WHERE THEY MAY SPILL OR LEAK INTO WELLS, STORMWATER DRAINS, GROUND WATER OR SURFACE WATER. IF A SPILL OCCURS, CLEAN AREA IMMEDIATELY. 4. DO NOT STOCKPILE THESE MATERIALS ONSITE. HAZARDOUS AND TOXIC WASTE Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 1. CREATE DESIGNATED HAZARDOUS WASTE COLLECTION AREAS ON -SITE. 2. PLACE HAZARDOUS WASTE CONTAINERS UNDER COVER OR IN SECONDARY CONTAINMENT. 3. DO NOT STORE HAZARDOUS CHEMICALS, DRUMS OR BAGGED MATERIALS DIRECTLY ON THE GROUND. Mffiarton-Smiffi, Inc. 4k> WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 CITY OF DURHAM SNOW HILL ROAD PUMP STATION C 113L� am qh.. I tmqL m gall HIGH COHESIVE & LOW FILTRATION SOIL R�Rnn SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE NOTING DEVICE (18" X 24" MIN.) SECTION B-B CONCRETE I NOTES: WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING ni A KI CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE DETAILS CIVIL GROUND STABILIZATION AND MATERIALS HANDLING " "11L PLASTIC NG TIDE SLOPE DBAGS (TYP.) STAPLES COHESIVE & ✓ FILTRATION -BERM DATE: MAY 2020 HAZEN NO.: 31453-000 CONTRACT NO.: 01 DRAWING NUMBER: DC1 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING a� m a� m U) U a a U) N U J U ry U a mi m 0 U 75; o a 0 0 0 6 M� L� �o co NO J N ALo Lw v M 0 o� - J u- d SELF -INSPECTIONS ARE REQUIRED DURING NORMAL BUSINESS HOURS IN ACCORDANCE WITH THE TABLE BELOW. WHEN ADVERSE WEATHER OR SITE CONDITIONS WOULD CAUSE THE SAFETY OF THE INSPECTION PERSONNEL TO BE IN JEOPARDY, THE INSPECTION MAY BE DELAYED UNTIL THE NEXT BUSINESS DAY ON WHICH IT IS SAFE TO PERFORM THE INSPECTION. IN ADDITION, WHEN A STORM EVENT OF EQUAL TO OR GREATER THAN 1.0 INCH OCCURS OUTSIDE OF NORMAL BUSINESS HOURS, THE SELF -INSPECTION SHALL BE PERFORMED UPON THE COMMENCEMENT OF THE NEXT BUSINESS DAY. ANY TIME WHEN INSPECTIONS WERE DELAYED SHALL BE NOTED IN THE INSPECTION RECORD. REQUIRED GROUND STABILIZATION TIMEFRAMES FREQUENCY (DURING INSPECT NORMAL BUSINESS INSPECTION RECORDS MUST INCLUDE: HOURS) (1) RAIN GAUGE DAILY DAILY RAINFALL AMOUNTS. MAINTAINED IN GOOD IF NO DAILY RAIN GAUGE OBSERVATIONS ARE MADE WORKING ORDER DURING WEEKEND OR HOLIDAY PERIODS, AND NO INDIVIDUAL -DAY RAINFALL INFORMATION IS AVAILABLE, RECORD THE CUMULATIVE RAIN MEASUREMENT FOR THOSE UN -ATTENDED DAYS (AND THIS WILL DETERMINE IF A SITE INSPECTION IS NEEDED). DAYS ON WHICH NO RAINFALL OCCURRED SHALL BE RECORDED AS "ZERO." THE PERMITTEE MAY USE ANOTHER RAIN -MONITORING DEVICE APPROVED BY THE DIVISION. (2) E&SC MEASURES AT LEAST ONCE PER 7 1. IDENTIFICATION OF THE MEASURES INSPECTED, CALENDAR DAYS AND 2. DATE AND TIME OF THE INSPECTION, WITHIN 24 HOURS OF A 3. NAME OF THE PERSON PERFORMING THE RAIN EVENT > 1.0 INCH INSPECTION, IN 24 HOURS 4. INDICATION OF WHETHER THE MEASURES WERE OPERATING PROPERLY, 5. DESCRIPTION OF MAINTENANCE NEEDS FOR THE MEASURE, 6. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS TAKEN. (3) STORMWATER AT LEAST ONCE PER 7 1. IDENTIFICATION OF THE MEASURES INSPECTED, DISCHARGE CALENDAR DAYS AND 2. DATE AND TIME OF THE INSPECTION, OUTFALLS (SDOS) WITHIN 24 HOURS OF A 3. NAME OF THE PERSON PERFORMING THE RAIN EVENT > 1.0 INCH INSPECTION, IN 24 HOURS 4. INDICATION OF WHETHER THE MEASURES WERE OPERATING PROPERLY, 5. DESCRIPTION OF MAINTENANCE NEEDS FOR THE MEASURE, 6. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS TAKEN. (4) PERIMETER OF SITE AT LEAST ONCE PER 7 1. IF VISIBLE SEDIMENTATION IS FOUND OUTSIDE CALENDAR DAYS AND SITE LIMITS, THEN A RECORD OF THE FOLLOWIN WITHIN 24 HOURS OF A SHALL BE MADE: RAIN EVENT > 1.0 INCH 2. ACTIONS TAKEN TO CLEAN UP OR STABILIZE THE IN 24 HOURS SEDIMENT THAT HAS LEFT THE SITE LIMITS, 3. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS TAKEN, AND 4. AN EXPLANATION AS TO THE ACTIONS TAKEN TO CONTROL FUTURE RELEASES. (5) STREAMS OR AT LEAST ONCE PER 7 1. IF THE STREAM OR WETLAND HAS INCREASED WETLANDS ONSITE CALENDAR DAYS AND VISIBLE SEDIMENTATION OR A STREAM HAS OR OFFSITE (WHERE WITHIN 24 HOURS OF A VISIBLE INCREASED TURBIDITY FROM THE ACCESSIBLE) RAIN EVENT > 1.0 INCH CONSTRUCTION ACTIVITY, THEN A RECORD OF IN 24 HOURS THE FOLLOWING SHALL BE MADE: 2. DESCRIPTION, EVIDENCE AND DATE OF CORRECTIVE ACTIONS TAKEN, AND 3. RECORDS OF THE REQUIRED REPORTS TO THE APPROPRIATE DIVISION REGIONAL OFFICE PER PART III, SECTION C, ITEM (2)(A) OF THIS PERMIT. (6) GROUND AFTER EACH PHASE OF 1. THE PHASE OF GRADING (INSTALLATION OF STABILIZATION GRADING PERIMETER E&SC MEASURES, CLEARING AND MEASURES GRUBBING, INSTALLATION OF STORM DRAINAGE FACILITIES, COMPLETION OF ALL LAND -DISTURBING ACTIVITY, CONSTRUCTION OR REDEVELOPMENT, PERMANENT GROUND COVER). 2. DOCUMENTATION THAT THE REQUIRED GROUND STABILIZATION MEASURES HAVE BEEN PROVIDED WITHIN THE REQUIRED TIMEFRAME OR AN ASSURANCE THAT THEY WILL BE PROVIDED AS SOON AS POSSIBLE. NOTE: THE RAIN INSPECTION RESETS THE REQUIRED 7 DAY CALENDAR DAY INSPECTION REQUIREMENT 1. E&SC PLAN DOCUMENTATION THE APPROVED E&SC PLAN AS WELL AS ANY APPROVED DEVIATION SHALL BE KEPT ON THE SITE. THE APPROVED E&SC PLAN MUST BE KEPT UP-TO-DATE THROUGHOUT THE COVERAGE UNDER THIS PERMIT THE FOLLOWING ITEMS PERTAINING TO THE E&SC PLAN SHALL BE KEPT ON SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES DURING NORMAL BUSINESS HOURS. ITEM TO DOCUMENT INSPECTION RECORDS MUST INCLUDE: (A) EACH E&SC MEASURE HAS BEEN INITIAL AND DATE EACH E&SC MEASURE ON A COPY OF THE INSTALLED AND DOES NOT SIGNIFICANTLY APPROVED E&SC PLAN OR COMPLETE, DATE AND SIGN AN DEVIATE FROM THE LOCATIONS, INSPECTION REPORT THAT LISTS EACH E&SC MEASURE DIMENSIONS AND RELATIVE ELEVATIONS SHOWN ON THE APPROVED E&SC PLAN. THIS SHOWN ON THE APPROVED E&SC PLAN. DOCUMENTATION IS REQUIRED UPON THE INITIAL INSTALLATION OF THE E&SC MEASURES OR IF THE E&SC MEASURES ARE MODIFIED AFTER INITIAL INSTALLATION. (B) A PHASE OF GRADING HAS BEEN INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR COMPLETED. COMPLETE, DATE AND SIGN AN INSPECTION REPORT TO INDICATE COMPLETION OF THE CONSTRUCTION PHASE. (C) GROUND COVER IS LOCATED AND INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR INSTALLED IN ACCORDANCE WITH THE COMPLETE, DATE AND SIGN AN INSPECTION REPORT TO APPROVED E&SC PLAN. INDICATE COMPLIANCE WITH APPROVED GROUND COVER SPECIFICATIONS. (D) THE MAINTENANCE AND REPAIR COMPLETE, DATE AND SIGN AN INSPECTION REPORT. REQUIREMENTS FOR ALL E&SC MEASURES HAVE BEEN PERFORMED. (E) CORRECTIVE ACTIONS HAVE BEEN INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR TAKEN TO E&SC MEASURES. COMPLETE, DATE AND SIGN AN INSPECTION REPORT TO INDICATE THE COMPLETION OF THE CORRECTIVE ACTION. 2. ADDITIONAL DOCUMENTATION TO BE KEPT ON SITE IN ADDITION TO THE E&SC PLAN DOCUMENTS ABOVE, THE FOLLOWING ITEMS SHALL BE KEPT ON THE SITE AND AVAILABLE FOR INSPECTORS AT ALL TIMES DURING NORMAL BUSINESS HOURS, UNLESS THE DIVISION PROVIDES A SITE -SPECIFIC EXEMPTION BASED ON UNIQUE SITE CONDITIONS THAT MAKE THIS REQUIREMENT NOT PRACTICAL: (A) THIS GENERAL PERMIT AS WELL AS THE CERTIFICATE OF COVERAGE, AFTER IT IS RECEIVED. (B) RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS TWELVE MONTHS. THE PERMITTEE SHALL RECORD THE REQUIRED OBSERVATIONS ON THE INSPECTION RECORD FORM PROVIDED BY THE DIVISION OR A SIMILAR INSPECTION FORM THAT INCLUDES ALL THE REQUIRED ELEMENTS. USE OF ELECTRONICALLY -AVAILABLE RECORDS IN LIEU OF THE REQUIRED PAPER COPIES WILL BE ALLOWED IF SHOWN TO PROVIDE EQUAL ACCESS AND UTILITY AS THE HARD -COPY RECORDS. 3. DOCUMENTATION TO BE RETAINED FOR THREE YEARS ALL DATA USED TO COMPLETE THE E-NOI AND ALL INSPECTION RECORDS SHALL BE MAINTAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION AND MADE AVAILABLE UPON REQUEST. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT SEDIMENT BASINS AND TRAPS THAT RECEIVE RUNOFF FROM DRAINAGE AREAS OF ONE ACRE OR MORE SHALL USE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN THESE DEVICES NEED TO BE DRAWN DOWN FOR MAINTENANCE OR CLOSE OUT UNLESS THIS IS INFEASIBLE. THE CIRCUMSTANCES IN WHICH IT IS NOT FEASIBLE TO WITHDRAW WATER FROM THE SURFACE SHALL BE RARE (FOR EXAMPLE, TIMES WITH EXTENDED COLD WEATHER). NON -SURFACE WITHDRAWALS FROM SEDIMENT BASINS SHALL BE ALLOWED ONLY WHEN ALL OF THE FOLLOWING CRITERIA HAVE BEEN MET: (A) THE E&SC PLAN AUTHORITY HAS BEEN PROVIDED WITH DOCUMENTATION OF THE NON -SURFACE WITHDRAWAL AND THE SPECIFIC TIME PERIODS OR CONDITIONS IN WHICH IT WILL OCCUR. THE NON -SURFACE WITHDRAWAL SHALL NOT COMMENCE UNTIL THE E&SC PLAN AUTHORITY HAS APPROVED THESE ITEMS, (B) THE NON -SURFACE WITHDRAWAL HAS BEEN REPORTED AS AN ANTICIPATED BYPASS IN ACCORDANCE WITH PART III, SECTION C, ITEM (2)(C) AND (D) OF THIS PERMIT, (C) DEWATERING DISCHARGES ARE TREATED WITH CONTROLS TO MINIMIZE DISCHARGES OF POLLUTANTS FROM STORMWATER THAT IS REMOVED FROM THE SEDIMENT BASIN. EXAMPLES OF APPROPRIATE CONTROLS INCLUDE PROPERLY SITED, DESIGNED AND MAINTAINED DEWATERING TANKS, WEIR TANKS, AND FILTRATION SYSTEMS, (D) VEGETATED, UPLAND AREAS OF THE SITES OR A PROPERLY DESIGNED STONE PAD IS USED TO THE EXTENT FEASIBLE AT THE OUTLET OF THE DEWATERING TREATMENT DEVICES DESCRIBED IN ITEM (C) ABOVE, (E) VELOCITY DISSIPATION DEVICES SUCH AS CHECK DAMS, SEDIMENT TRAPS, AND RIPRAP ARE PROVIDED AT THE DISCHARGE POINTS OF ALL DEWATERING DEVICES, AND (F) SEDIMENT REMOVED FROM THE DEWATERING TREATMENT DEVICES DESCRIBED IN ITEM (C) ABOVE IS DISPOSED OF IN A MANNER THAT DOES NOT CAUSE DEPOSITION OF SEDIMENT INTO WATERS OF THE UNITED STATES. PROJECT ENGINEER: DESIGNED BY: IQ:L'Viyj01 y,I B. PORTER C. WILSON A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING REV ISSUED FOR DATE By I IS NOT TO FULL SCALE Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 1. OCCURRENCES THAT MUST BE REPORTED PERMITTEES SHALL REPORT THE FOLLOWING OCCURRENCES: (A) VISIBLE SEDIMENT DEPOSITION IN A STREAM OR WETLAND (B) OIL SPILLS IF: • THEY ARE 25 GALLONS OR MORE, • THEY ARE LESS THAN 25 GALLONS BUT CANNOT BE CLEANED UP WITHIN 24 HOURS, • THEY CAUSE SHEET ON WATERS (REGARDLESS OF VOLUME), OR • THEY ARE WITHIN 100 FEET OF SURFACE WATERS (REGARDLESS OF VOLUME). (C) RELEASES OF HAZARDOUS SUBSTANCES IN EXCESS OF REPORTABLE QUANTITIES UNDER SECTION 311 OF THE CLEAN WATER ACT (REF: 40 CFR 110.3 AND 40 CFR 117.3) OR SECTION 102 OF CERCLA (REF: 40 CFR 302.4) OR G.S. 143-215.85. (D) ANTICIPATED BYPASSES AND UNANTICIPATED BYPASS (E) NONCOMPLIANCE WITH THE CONDITIONS OF THIS PERMIT THAT MAY ENDANGER HEALTH OR THE ENVIRONMENT. 2. REPORTING TIMEFRAMES AND OTHER REQUIREMENTS AFTER A PERMITTEE BECOMES AWARE OF AN OCCURRENCE THAT MUST BE REPORTED, HE SHALL CONTACT THE APPROPRIATE DIVISION REGIONAL OFFICE WITHIN THE TIMEFRAMES AND IN ACCORDANCE WITH THE OTHER REQUIREMENTS LISTED BELOW. OCCURRENCES OUTSIDE NORMAL BUSINESS HOURS MAY ALSO BE REPORTED TO THE DEPARTMENT'S ENVIRONMENTAL EMERGENCY CENTER PERSONNEL AT (800) 858-0368. OCCURENCE REPORTING TIMEFRAME (AFTER DISCOVERY) AND OTHER REQUIREMENTS (A) VISIBLE SEDIMENT WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. DEPOSITION IN A STREAM OR WITHIN 7 CALENDAR DAYS, A REPORT THAT CONTAINS A WETLAND DESCRIPTION OF THE SEDIMENT AND ACTIONS TAKEN TO ADDRESS THE CAUSE OF THE DEPOSITION. DIVISION STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A CASE -BY -CASE BASIS. • IF THE STREAM IS NAMED ON THE NC 303(D) LIST AS IMPAIRED FOR SEDIMENT -RELATED CAUSES, THE PERMITTEE MAY BE REQUIRED TO PERFORM ADDITIONAL MONITORING, INSPECTIONS OR APPLY MORE STRINGENT PRACTICES IF STAFF DETERMINE THAT ADDITIONAL REQUIREMENTS ARE NEEDED TO ASSURE COMPLIANCE WITH THE FEDERAL OR STATE IMPAIRED -WATERS CONDITIONS. (B) OIL SPILLS AND RELEASE OF WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. THE HAZARDOUS SUBSTANCES NOTIFICATION SHALL INCLUDE INFORMATION ABOUT THE DATE, TIME, PER ITEM 1(B)-(C) ABOVE NATURE, VOLUME AND LOCATION OF THE SPILL OR RELEASE. (C) ANTICIPATED BYPASSES [40 A REPORT AT LEAST TEN DAYS BEFORE THE DATE OF THE BYPASS, CFR 122.41(M)(3)] IF POSSIBLE. THE REPORT SHALL INCLUDE AN EVALUATION OF THE ANTICIPATED QUALITY AND EFFECT OF THE BYPASS. (D) UNANTICIPATED BYPASSES • WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. [40 CFR 122.41(M)(3)] 0 WITHIN 7 CALENDAR DAYS, A REPORT THAT INCLUDES AN EVALUATION OF THE QUALITY AND EFFECT OF THE BYPASS. (E) NONCOMPLIANCE WITH THE • WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. CONDITIONS OF THIS PERMIT • WITHIN 7 CALENDAR DAYS, A REPORT THAT CONTAINS A THAT MAY ENDANGER DESCRIPTION OF THE NONCOMPLIANCE, AND ITS CAUSES; THE HEALTH OR THE PERIOD OF NONCOMPLIANCE, INCLUDING EXACT DATES AND TIMES, ENVIRONMENT [40 CFR AND IF THE NONCOMPLIANCE HAS NOT BEEN CORRECTED, THE 122.41(L)(7)] ANTICIPATED TIME NONCOMPLIANCE IS EXPECTED TO CONTINUE; AND STEPS TAKEN OR PLANNED TO REDUCE, ELIMINATE, AND PREVENT REOCCURRENCE OF THE NONCOMPLIANCE. [40 CFR 122.41(L)(6). • DIVISION STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A CASE -BY -CASE BASIS. Whorton-Smiffi, Inc. WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 DATE: MAY 2020 DETAILS HAZEN NO.: 31453-000 1 w �1 0 CIVIL CONTRACT NO.: 01 CITY OF DURHAM SELF -INSPECTION RECORDKEEPING AND DRAWING SNOW HILL ROAD REPORTING NUMBER: PUMP STATION I DC2 a O v 0 N O Q 0 M v a� m U) U ry Q Q co co U � U ry U Q a mi m 0 U 2 O O O co Lo�: �o co NO J N M LO LOw v M 0 o�_ 4io J LL d cl) U) W 01 w z_ J i 400t SIDE VIEW 3'-4" L Y J 8'-0" MAX STEEL POST TOP STRAND STAY WIRES GALV WIRE FABRIC AND SILT FENCE MATERIAL. BURY TOE OF MATERIAL FABRIC A MIN OF 8" BOTTOM STRAND GRADE LINE IVIIIV ELEVATION SECTION SILT FENCE SILT FENCE NOTE: 1. EXTRA STRENGTH SILT FENCE MATERIAL (AS APPROVED BY ENGINEER) WITH 6-0" POST SPACING DOES NOT REQUIRE MESH SUPPORT FENCE. 2. SILT FENCE MATERIAL SHALL BE WIRED DIRECTLY TO POST. C-31-0400 POST =N WIRE FABRIC NING SIGN TREE PROTECTION AREA DO NOT ENTER WARNING SIGN DETAIL MIN 10 GAUGE LINE WIRES 8'-0" MAX VARIABLE AS DIRECTED BY THE ENGINEER TREE PROTECTION AREA DO NOT ENTER IIIII=IIIII IIIII IIIII-IIIII=IIIII IIIII=IIIII=IIIII=IIIII-IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII=IIIII IIIII II IIIII IIIII ORANGE, UV RESISTANT HIGH -TENSILE STRENGTH IIIII IIIII POLY -BARRICADE FABRIC, TYP IIIII IIIII IIIII - IIIII 'III = 'illl FRONT VIEW NOTE: FOR TREE PROTECTION ONLY NOTES: 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE, AND SPACED ao AS DETAILED. 3. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 4. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 5. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 6. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. TREE PROTECTION FENCE C-31-0404 PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING REV ISSUED FOR DATE By IS NOT TO FULL SCALE e� A' RAAV STABILIZED OUTLET FOR SILT FENCE C-31-0403 FORM BERM WITH EXCAVATED MATERIAL EXISTING GRADE 2 POLYETHYLENE LINER SEE DETAIL C-31-047OR TEMPORARY DIVERSION SWALE PLASTIC OR C-31-0440 R WIRE TIES MIN 12 1/2 GAUGE INTERMEDIATE WIRES, TYP �� J��\•Pe O DITCH STAPLES GRADE \ '_ O� LINER Ha en HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 OVERLAP PERSPECTIVE VIEW IJi/_���IRe3 2 1 NOTES: 1. LINER SHALL BE 20 MIL (MINIMUM) SCRIM REINFORCED OR WOVEN COATED POLYETHYLENE LINER 2. STAPLES TO BE SPACED AT 3'-0" MAX IN ALL DIRECTIONS. 1" OVERLAP ' TYP LINING STAPLES POLYETHYLENE INSTALLATION C-31-0470 R Wharton -Smith, Inc. WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 CITY OF DURHAM SNOW HILL ROAD PUMP STATION 50'-0" M I N p0o 00 0 0 000 0 0�000 c c �o 000 00 oo0p 0 0000000000o, 00 00 000000000 00 0 0000 �0 0a o 000 00 0 0 0 0 O Ur Q1"oZ_ O p0 0 z o o 2" - 3" COARSE o �! Q o AGGREGATE o o X Q uJ o00 00 0 (V 000 0 0000 0 0 000 0 0 0 000 0 00 00 0 oocb0o O o 0000 0 00 ooOoO 00 0 0 00 0000000a o0 o0 000 SILT FENCE* PLAN EXISTING ROADWAY 0 0 0 eo0p 35'-0" M I N NOTES: 1. *SILT FENCE SHOULD BE INSTALLED TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD OR THE LENGTH OF THE CONSTRUCTION ENTRANCE EXTENDED. 3. MAINTENANCE: ADD ADDITIONAL STONE AND "FLUFF" TOP DRESSING WITH 2" STONE. TYPE II SEPARATOR GEOTEXTILE CROSS SECTION 15'-0" M I N I01 LYWYK6Z970699:i9L409to] 0� SEE N.C. DENR EROSION AND SEDIMENT CONTROL PLANNING and DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATION & DESIGN CRITERIA. GRAVEL ENTRANCE/EXIT C-31-0490 HIGH STRENGTH BAG PLACED ON DOUBLE STITCHED AGGREGATE OR STRAW "J" TYPE SEAMS SEWN IN SPOUT HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE WATER FLOW FROM PUMP 15'-0" PUMP DISCHARGE HOSE OPENING ACCOMODATES TOP VIEW UP TO 4" DISCHARGE HOSE AGGREGATE OR STRAW UNDERLAYMENT SIDE VIEW NOTE: SILT CONTROL SYSTEM TO BE USED IN CONJUNCTION WITH PUMP AROUND IF DEEMED NECESSARY BY SEDIMENT CONTROL INSPECTOR TO TREAT ANY SEDIMENT -LADEN WATER WITHIN THE DRY WORK AREA. DEWATERING/FILTER BAG MATERIALS SPECIFICATIONS: THE DEWATERING/FILTER BAG SHALL BE MADE OF NON -WOVEN GEOTEXTILE WITH A MINIMUM SURFACE AREA OF 225 SQUARE FEET PER SIDE. ALL STRUCTURAL SEAMS SHALL BE SEWN WITH A DOUBLE STITCH USING A DOUBLE NEEDLE MACHINE WITH HIGH STRENGTH THREAD. THE SEAM STRENGTH SHALL WITHSTAND 100LB/IN USING ASTM D-4884 TEST METHOD. THE DEWATERING/FILTER BAG SHALL HAVE A NOZZLE LARGE ENOUGH TO ACCOMMODATE A FOUR INCH DISCHARGE HOSE. THE NOZZLE SHALL BE SEALED TIGHTLY AROUND THE DISCHARGE HOSE WITH A STRAP OR SIMILAR DEVICE TO PREVENT UNTREATED WATER FROM ESCAPING. THE GEOTEXTILE FABRIC SHALL BE A NON -WOVEN FABRIC WITH THE FOLLOWING PROPERTIES: WEIGHT ASTM D-3776 10 OZ/YD GRAB TENSILE ASTM D-4632 270 LBS PUNCTURE ASTM D-4833 150 LBS FLOW RATE ASTM D-4491 70 GAL/MIN/SQ FT PERMITIVITY ASTM D-4991 1/1.3 SEC UV RESISTANCE ASTM D-4355 70% AOS % RETAINED ASTM D-4751 100 CONSTRUCTION: THE DEWATERING/FILTER BAG SHALL BE INSTALLED OVER A 3 INCH GRAVEL BASE OR A STRAW BALE BASE TO PROMOTE INFILTRATION AND DEWATERING OF THE FILTER BAG. C-31-0417 DETAILS CIVIL STANDARD DETAILS DATE: MAY 2020 HAZEN NO.: 31453-000 CONTRACT NO.: Q 1 DRAWING NUMBER: DC3 I uetaus r-rovlaea Dy AFMAN consulting Lnglneers - www.opplanenglneers.Com I I 0 FGR OLE WALL --I ` �,L�SRO.NROUBBER BOOT, �rl / T 1 a v N 0 N 0 N O E2 iv to U D_ Q Q 0 n (1) m to v U J U ry U Q 0]I m 0 U o Q 0 0 0 M Lo �o co N J � A N f`YS CO M L0 L w v M Q o� 0 - J U_ d LATERAL PIPE �� C I w 9TC Q FORMED - 9C INVERT �•� TOP OF BENCH, 6" MIN. i \ SEE NOTE 3 SEE NOTE 1 \ \ SEWER MAIN #57 STONE FLOW LATERAL I Fl AROUND BOOT+� LATERAL CONNECTION I-/�,•'" . ANGLE GREATER- _ THAN OR EQUAL �, • ° TO 90' TOP OF BENCH, I I •� ° SEE NOTE 3 PRO. RUBBER BOOT, t, SEE NOTE 7 > '~' PROPOSED FORMED PLAN VIEW UJI (N PRO. / °• t.,' '.t' ,,:`.:.� \, \ INLET SEE NOTE 5 LATERAL, >; J1 SEE NOTES I. :.'i =.' : , `T. < �' o ''` '� ` '� • ''��• EXISTING FORMED INLET _j 8 SEE STD. DETAILS 733.01 & I SfWEjt, .02 FOR STUB MAI/y STUB OUT, /� •_ 1,- _ MANHOLE (SHOWN CUT -AWAY FOR CLARITY) oar / ISOMETRIC VIEW Fes✓ NOTES: 1. The minimum spacing from the edge of a core for a lateral to the edge of the next core shall be 6 inches. 2. Sewer lateral shall not enter a manhole at an angle less than 90' to the effluent pipe. 3. All laterals to be installed at the top of the bench. 4. Provide brick or concrete for invert. 5. Inverts to be built from lateral to effluent pipe. 6. The maximum number of laterals for any one manhole is five (5). 7. All new laterals into manholes must be core drilled and installed with a flexible rubber boot. DURHAM Dept. of Water Management City o f Durham, N CVoice (919) 560-4381 1600 Mist Lake Dr. 7 Durham, N.C. 27704 USE WITH THE STANDARD SPECIFICATIONS ONLY www.durhamnc.gov SCALE: DETAIL # SANITARY SEWER LATERAL Not To Scale 273303 1 8 6 9 AT MANHOLES REVISION DATE: SHEET CIOF OF MEDICINE Feb., 2017 1 of 1 VARIES 1 3'-0" SEE PLAN 25:1 2% f- 20'-0" 2% 3'-0" 25:1 VARIES SEE PLAN 3\PE 8" AGGREGATE BASE COURSE COMPACTED SUB -GRADE TEMPORARY CONSTRUCTION ACCESS ROAD C-32-0560 PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: M. SANTOWASSO IF THIS BAR DOES NOT 0 1/2" 1" - CONSTRUCTION 03/2020 CEW MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE TYPCIAL PRECAST CONCRETE MANHOLE FLEXIBLE RUBBER SLEEVE BOOT ° D o, SEWER MAIN (ENTIRE RUN SHALL BE DIP) 4" MIN. FLOW TDROP (DIP) 0 C D OV Q SEWER _j z TovO V / 6 t MAIN Q v (MIN. Oo� Qo O t> pp p °' --- •o' .hoc 0 o z u OOP \ C O( / C/ v �C) 0p ooOp�p�oo Op p poo h cr)� p p0 0��08 O Do CONCRETE BLOCKING TO TOP OF PIPE DURHAM SANITARY SEWER DROP MANHOLE SCALE: REVISION DATE: NTS 12/07/2009 CITY OF DURHAM, NORTH CAROLINA DETAIL NO. 1 8 6 9 CITY OF MEDICINE DEPARTMENT OF PUBLIC WORKS SS-2.7 3:1 VARIES - SEE SITE PLAN CL VARIES 4'-0" EQUAL 12" SLOPE AT 1/4:12 MIN 1.5" ASPHALT TYP SURFACE COURSE 3.0" ASPHALT BASE COURSE 12:1 CUT SECTION NOTE: THE 1.5" ASPHALT CONCRETE SURFACE COURSE AND THE TACK COAT SHALL NOT BE PLACED UNTIL COMPLETION OF ALL OTHER WORK IN CONTRACT. EQUAL 4'-0" SLOPE AT 1/4:12 TACK COAT 12:1 MANHOLE RING AND COVER (DETAIL NO. SS-2.4) 24" MAX. 2'-0 1 a STEEL REINFORCEMENT (NOTE MANHOLE STEP 3 DETAIL NO. SS-2.1) (DETAIL NO. SS-2.5) �O 4'-0" FLEXIBLE RUBBER (SEE NOTE 8 DETAIL SLEEVE BOOT (NOTE 5 NO. SS-2.1) DETAIL NO. SS-2.1) MAIN MA 1 " PLASTER SEWER FLOW + MAIN L- DURHAM PRECAST CONCRETE SCALE: REVISION DATE: SANITARY SEWER MANHOLE NTS 03/18/2010 CITY OF DURHAM, NORTH CAROLINA DETAIL NO. 1 8 6 9 DEPARTMENT OF PUBLIC WORKS SS-2.0 C ITV OF MEDICINE \ . FILL SECTION 6" AGGREGATE BASE COURSE TYPE I SEPARATOR GEOTEXTILE COMPACTED SUB -GRADE TYPICAL ROADWAY SECTION C-32-0550 RAISED HEXAGONAL VALVE BOX PAD, HEAD THREADED SEE C-33-0631 PLUG FINISH GRADE NOTES 1. ALL PRE CAST CONCRETE MANHOLES SHALL CONFORM TO THE LATEST REVISION OF ASTM C478. 2. CONCRETE SHALL BE 4000 PSI AT 28 DAYS MINIMUM. 3. STEEL REINFORCEMENT SHALL BE GRADE 40 BILLET STEEL CONFORMING TO THE LATEST REVISION OF ASTM-A-185 FOR WALL REINFORCEMENT, AND THE LATEST REVISION OF ASTM-A615 FOR THE BASE REINFORCEMENT. 4. STANDARD JOINTS SHALL BE; SEALED WITH PUTTY TYPE PLASTIC CEMENT PER FED. SPEC. SS-C-153 OR AN 0-RING TYPE JOINT CONFORMING TO THE LATEST REVISION OF ASTM-C443. 5. MANHOLE INLETS AND OUTLETS SHALL BE CAST IN PLACE FLEXIBLE RUBBER SLEEVES BOOTS PER THE LATEST REVISION OF ASTM-C923. 6. INVERTS TO BE CONSTRUCTED OF BRICK WITH A CONCRETE BENCH (DETAIL NO. SS-2.2). 7. THE MAXIMUM SEPARATION OR INVERT IN TO INVERT OUT WITHIN A MANHOLE IS 0.50 FEET. WHEN THE SEPARATION IS GREATER THAN 0.5 FEET A DROP MANHOLE MUST BE USED. 8. MANHOLES GREATER THAN 18 FEET IN DEPTH SHALL HAVE AN INSIDE DIAMETER OR 5'-0". FOR SANITARY SEWER MAINS GREATER THAN EIGHTEEN INCHES (18") IN DIAMETER, MANHOLES SHALL BE A MINIMUM OF 5'-0" IN DIAMETER. 9. RIM ELEVATIONS SHALL BE AT GRADE IN STREETS & PARKING LOTS. 10. RIM ELEVATIONS ALONG OUTFALLS SHALL BE A MINIMUM OF 3' ABOVE EXISTING GROUND ELEVATION. IF THE OUTFALL IS LOCATED WITHIN THE FLOOD PLAIN, RIM ELEVATIONS SHALL BE 2' ABOVE THE 100-YEAR FLOOD ELEVATION (WHILE STILL MAINTAINING THE 3' ABOVE THE EXISTING GROUND ELEVATION MINIMUM REQUIREMENT). THE 100-YEAR FLOOD ELEVATION SHALL BE NOTED ON THE CONSTRUCTION DRAWINGS. 11. DEPENDING UPON THE HEIGHT OF THE MANHOLE, THE CITY OF DURHAM ENGINEERING DIVISION MAY REQUIRE FLAT MANHOLES, EXTERIOR STEPS AND SAFETY BARS ON TOP OF THE MANHOLE. DURHAM 1 8 6 9 CITY OF MEDICINE 6" SCH 80 PVC RISER to LOCATE CLEAR OF w OBSTRUCTIONS > Fn ClI�YN:IR1111 16 CLEANOUT C-33-0620 Myrd0Eel VEl1.9N 3: 1►191 PROPOSED DIVERSION THICKNESS - 1-1/2 TIMI OF LARGEST STONE O STONE SIZE - 8" t0 15" IJIr%IVIC I L__rX `11106]Q11iY RIP RAP APRON C-22-0311 R 0 N - DATE: MAY 2020 - = = HAZEN NO.: 31453-000 en Wharton -Smith, Inc.� �DETAILS � N STR UC'T I O OLJP CITY OF CIVIL CONTRACT NO.: 01 DURHAM STANDARD DETAILS DRAWING HAZEN AND SAWYER WHARTON-SMITH, INC. NUMBER: 4011 WESTCHASE BOULEVARD, SUITE 500 5601 77 CENTER DRIVE #120, CHARLOTTE, SNOW HILL ROAD RALEIGH, NORTH CAROLINA 27607 NORTH CAROLINA 28217 LICENSE NO.: C-0381 PUMP STATION DC4 75 0 0 0 0 N O N a� i6 a m m U) 2 U ry ¢ ¢ n a� m U) L0 C J () ry U ¢ a mi m 0 U M L� �o M NO J N M L0 Lw v M 0 o� 0 — J u- 0 121, V) 'O Ope d LU w Z Cie QO Ou lS� p z v Q Z m O� w m oc 3 Z Lu O La Q ca v O Q � N m 3 p C� Lu p N z v >� J N V) Q C-) U' �o )N F ° Ot w m w Z 5O Q V) Lu Lu0, 3'(TYP) �et U: w m � Lu d (Lu vw) Z Q V) C" C" 0Oz z z 0 O � O m J O Cz Q on � O V w uj F_ Z = 0 V Z Q 0 m � J O QCz N V) N cn = Q 3 "' O � Lu p w m C w CL., d O= Lu Jm Lu J Z Lu u = Z to LuOe LL w O V u V Z V w d L Q OZ C-4 w FENCE CROSS ~ w TO GROUND V GRID SEE SECTION Z Q DETAIL PS-21 .01 Ou c i 11600 MIST LAKE DRIVEDEPT. OF WATER CITY CITY O F DURHAM, N C Voice (919) 560-4381 DURHAM, NC 27704 USE WITH THE STANDARD SPECIFICATIONS ONLY www.durhamnc.gov SCALE: DETAIL# LIFT STATION STANDARD DETAILS N.T.S. PS-05.01 CITY OF FENCE/GATES REVISION DATE: SHEET# DURHAM 9/17/18 1 of 1 PROJECT ENGINEER: B. PORTER DESIGNED BY: C. WILSON DRAWN BY: A. MARCH CHECKED BY: C. WILSON IF THIS BAR DOES NOT 0 1/2" 1" MEASURE 1" THEN DRAWING REV ISSUED FOR DATE BY IS NOT TO FULL SCALE s I 6- BOLLARD TYPE 1 Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 E TOP FOR POSITIVE SLOPE TOP FOR POSITIVE SLOPE TOP FOR POSITIVE =R RUNOFF WATER RUNOFF WATER RUNOFF CH 40 STEEL PIPE all 6" O SCH 40 STEEL PIPE 6" O SCH 40 STEEL PIPE D WITH CONCRETE FILLED WITH CONCRETE AND FILLED WITH CONCRETE DAINTED PER SPECS PAINTED PER SPECS AND PAINTED PER SPECS w CD O TYP OF 4 MENT U) 3/16 V 11/2 SIDES N TYP PL 3/8"X12"X12" GALV, PAINTED PER SPEC EDGE OF CONC SLAB OR STEM WALL ° u a Z_ 2 LAYERS ° 1/2" JOINT FILLER MATL 00 30# FELT 4-1/2" O GALV ADH PAPER CLASS "B" CONCRETE CLASS "B" CONCRETE ANCHORS W/6" MIN ENCASEMENT ENCASEMENT EMBED, ONE EACH �S "B" CONCRETE TOF CORNER \SEMENT 1/2" JOINT FILLER MATL C� U) z z U 8" O SCH 40 STEEL PIPE O SLEEVE, PAINT PER SPECS, SECTION 9A NOTE: UNLESS OTHERWISE NOTED ALL 6" BOLLARDS SHALL BE TYPE 1 BOLLARD TYPE 2 C-32-0540 Wharton-Smifli, Inc, CONSTRUCTION R La P WHARTON-SMITH, INC. 5601 77 CENTER DRIVE #120, CHARLOTTE, NORTH CAROLINA 28217 BOLLARD TYPE 3 KIER CITY OF DURHAMI L�m_�= SNOW HILL ROAD PUMP STATION DETAILS CIVIL STANDARD DETAILS DATE: MAY 2020 HAZEN NO.: 31453-000 CONTRACT NO.: 01 DRAWING NUMBER: DC5 I