Loading...
HomeMy WebLinkAbout20081516 Ver 1_More Info Received_20100111S?G? Southern Environmental Group, Inc. 5315 South College Road, Suite E Wilmington, North Carolina 28412 910.452.2711 (office) - 910.452.2899 (fax) Date: 7 January 2010 To: Ian McMillan Of: DWQ - 401 Permitting Attached you will find:* ? Proposal ? Sketch(es) ? JD Package ? Report(s) D ` sr ^y' w,f Transmittal Letter Ltd U ?Y Jar! ZI'C ii DEYR - 01MER WALffY WETLA'N'DS, AND STOW DATER BRANCH ? Permit ? Wetland Boundary Map ? Photo(s) ? Plans ? Filing Fee ?x Other Copies Dated Description 1 12/28/09 Captiva Commons / Harris Teeter, Surf City Summary of Impacts. *If noted items are NOT attached, please contact our office. These are being delivered: ?X For your Review/Comment ? For your Records ? Returned for Correction(s) ? Corrected and Returned ? For your Signature ? As Requested X? Other: Summa of Impacts Report By: ? Hand Delivery ? Fed-Ex ? UPS 0 Certified Mail ? Other Notes: Ian, According to Joanne, we are to submit two (2) copies of the summary of changes for the project to Raleigh, and she will reissue the certification. The first copy was sent to your office previously. Joanne also received a hard copy and an email copy of the information. Signature and (Typed) Name: 77ry eran Dat e: 0 RE: DWQ 08 -1516 Captiva Commons I Harris Teeter Summary of Impacts From "Steenhuis, Joanne" goannesteenhuis@ncdenr.g.. View Contact To Dana Lutheran <duutheran@segi. us> Full View Dana, Because the applicant already paid the $570.00 for this project (and reduced it to a NW permit). I talked to Raleigh and they said you can send them 2 copies, me I copy and I'll reissue it. From: Dana Lutheran [mailto:dlutheran@segi.us] Sent: Wednesday, January 06, 2010 2:30 PM To: Steenhuis, Joanne Subject: DWQ 08 -1516 Captiva Commons / Harris Teeter Summary of Impacts Hello, Joanne. As mentioned on the phone, you should be receiving the attached information via snail mail, if you haven't received it already. The impacts for the project have increased by 0.03 acre. This is due to the need to obtain the correct fall for a stormwater pipe at Impact Area 9. Originally, the impact was anticipated to be temporary but because of the necessary fill, it will need to be accounted for as permanent. The Corps is requiring that the Applicant to mitigate, thorugh the HFWMB, at a 1:1 ratio for the additional 0.03 acre of impact and will be issuing a new NWP soon. Please call at your first opportunity to discuss what the Applicant needs to do to resolve the issue with the DWQ. Thanks a bunch, Dana SEGO Southern Environmental Group, Inc 5315 South Callege Rood, Sum E Wilmington, NC 28412 Phone: 910.452.2711 Fax: 910.452.2899 Mobile: 910.228.1841