HomeMy WebLinkAboutNCC202303_NOI Signed Certification_20200604NCGO1 Notice of Intent (NOI) Certification Form
Directions:
Print this form, complete, scan and upload to the electronic NOI.
Then, mail the original form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 61h Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
Per NC General Statute 143-215.6B (i), any person who knowingly makes any false statement representation,
or certification in any application, record, report, plan, or other document filed or required to be maintained
under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may
include a fine not to exceed ten thousand dollars ($10,000).
U nder penalty of law, 1 certify that (check all boxes to indicate your agreement)-
® 1 am the person responsible for the construction activities of this project, for satisfying the
requirements of this permit, and for any civil or criminal penalties incurred due to violations of this
permit.
® The information submitted in this NO] is, to the best of my knowledge and belief, true, accurate, and
complete based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information.
® I will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and
Sediment Control Plan.
® If the approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution
Prevention Plan) of the NCGO10000 General Permit, I will nonetheless ensure that all conditions of
Part II of the permit are met on the project at all times.
IN I hereby request coverage under the NCGQ10QQQ General Permit and understand that coverage under
this permit will constitute the permit requirements for the discharge(s) and is enforceable in the
same manner as an individual permit.
Name of Project: Edgewood Farms West Lots 15 and 16
Legally Responsible Organizational Entity: Paradise Homes of Fayetteville, LLC
* Legally Responsible Person: David Jackson
Title of Legally R7nisible Pers
Signature:
nt
Date: 05/29/2020
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity, such as a president, secretary, treasurer, or vice president or a manager that is
authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 permit.
For more information on signatory requirements, see Part IV, Section B, Item (6) of the NCGO10000 permit.