Loading...
HomeMy WebLinkAboutR-2534N. C. DEPARTMENT OF TRANSPORTATION TRANSMITTAL SLIP DATE 2 TO: C ? G b REF. NO. 'OR ROOM, BLDG. ? ? , ;dam- bE? FROM: REP. NO. OR ROOM, BLDG. Q ACTION ? NOTE AND FILE ? PER OUR CONVERSATION ? NOTE AND RETURN TO ME ? PER YOUR REQUEST ? RETURN WITH MORE DETAILS ? FOR YOUR APPROVAL ? NOTE AND SEE ME.ABOUT THIS ? FOR YOUR INFORMATION ?. PLEASE ANSWER ? FOR YOUR COMMENTS ? PREPARE REPLY FOR MY SIGNATURE ? SIGNATURE ? TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT COMMENTS: MS?o w.a STATE OF NORTH CAROLINA DEPARTMENT OF TkANSPORTATION JAMES B. HUNT, JR. DIVISION OF HIGHWAYS R. SAMUEL.HUN 'T III GovERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 {{?c T^RY ' August 3, 1993 D • _. - 5 ?gg3 e MEMORANDUM TO: Mr. Eric Galamb WP • DEM - DEHNR, 6th Floor FROM: L. J. Ward, P. E., Manager Planning and Environmental Branch SUBJECT: Review of Scoping Sheet for NC 49, from north of the Yadkin River to the Randolph County Line, Davidson County, Federal Aid Project No. NH-49(2), State Project No. 8.1600801, TIP No. R-2534 Attached for your review and comments are the scoping sheets for the subject project (See attached map for project location). The purpose of these sheets and the related review procedure is to have an early "meeting of the minds" as to the scope of work that should be performed and thereby enable us to better implement the project. A scoping meeting for this project is scheduled for August 30, 1993 at 10:00 A. M. in the Planning and Environmental Branch Conference Room (Room 434). You may provide us with your comments at the meeting or mail them to us prior to that date. Thank you for your assistance in this part of our planning process. If there are any questions about the meeting or the scoping sheets, please call oCk Eddie Keith, Project Planning Engineer, at 733-7842. EK/pl r UJ f lid y ) r (t? Atta2ch?ment y aIrt, t ?4 L .4- C K J C? . PROJECT SCOPING SHEET (R-2534) TIP # R-2534 Project # 8.1600801 F.A. Project # NH-49(2) Division 9 County Davidson Route NC 49 Functional Classification Rural Principal Arterial Length 9.1 miles Purpose of Project: Date August 3, 1993 Revision Date Project Development Stage Programming Planning 1993 Design may,. 1?L? 2001 Provide additional lanes along existing NC 49 to adequately serve current and future traffic volumes and improve safety. Description of project (including specific limits) and major elements of work: Widen existing NC 49 to a four lane divided facility from north of the Yadkin River to the Randolph County line. Type of environmental document to be prepared: Environmental Assessment followed by a Finding of No Significant Impact(FONSI) Type of Funding: Federal Will there be special funding participation by municipality, developers, or other? Yes No Y If yes, by whom and amount: ($) How and when will this be paid? N/A Type of Facility: Principal Arterial , or (?) Page 1 PROJECT SCOPING SHEET (R72534) Type of Access Control: Full Partial X None Type of Roadway: Four lane divided facility with a 46-foot median Interchanges 1 Grade Separations Stream Crossings Typical Section of Roadway: The proposed cross section will provide two 24-foo.t travelways with two foot paved shoulders and a 46-foot grass median. Traffic: Current 4400 vpd at the south end of the project 2900 vpd at the north end of the project Design Year (requested by September 10, 1993) % Trucks Design Standards Applicable: AASHTO X 3R Design speed: 0 D MPH Preliminary Resurfacing Design: Preliminary Pavement Design: Current Cost Estimate: Construction Cost (including engineering and contingencies). . . . . . . . . . . . $ Right of Way Cost (including rel., util., and acquisition) . . . . . . . . . . . . . $ Force Account Items . . . . . . . . . . . . . $ Preliminary Engineering. . . . . . . . . . . $ Total Cost . . . . . . . . . . . . . . . . $ TIP Cost Estimate: Prior Years . . . . . . . . . . . . . . . . $ 30,000 Construction . . . . . . . . . . . . $ 14,500,000 Right of Way . . . . . . . . . . . . . . . . $ 1,500,000 Total Cost . . . . . . . . . . . . . . . . . $ 16,030,000 Paize 2 PROJECT SCOPING SHEET (R-2534) List any special features, such as railroad involvement, which could affect cost or schedule of project: ITEMS REQUIRED ( ) COMMENTS COST Estimated Costs of Improvements: Pavement X Surface . . . . . . . . . . . . . . . Base . . . . . . . . . . . . . . . . . Milling & Recycling . . . . . . . . . Turnouts . . . . . . . . . . . . . . . Shoulders: Paved. . . . . . . . . Earth. . . . . . . . . X Earthwork . . . . . . . . . . . . . . . . Subsurface Items: . . . . . . . . . . . X Subgrade and Stabilization. . . . . . . . X Drainage (List any special items) . . . . Sub-Drainage. . . . . . . . Structures: Width x Length X Bridge Rehabilitation 28 x 134 X New Bridge 40 x 134 X Widen Bridge 12 x 134 Remove Bridge X New Culverts: Size Length Fill Ht. Culvert Extension . . . Retaining Walls: Type _ Ave. Ht. Skew Noise Walls . . . . . . . . . . . . Any Other Misc. Structures. . . . . . . Concrete Curb & Gutter. . . . . . . . . Concrete Sidewalk . . . . . . . . . . Guardrail . . . . . . . . . . . . . . . . Fencing: W.W. and/or C.L. . . X Erosion Control . . . . . . . . . . . Landscape . . . . . . . . . . . . . . . Lighting. . . . . . . . . . . . . . . . . X Traffic Control . . . . . . . . . . . . . X Signing: X New . . . . . . . . . . . . . Upgrading. . . . . . . . . . Traffic Signals: New . . . . . . . . _ Revised . . . . . . RR Signals: New _ . . . . . . . . . Revised . . . . . ... . . With or Without Arms. . If 3R: Drainage Safety Enhancement. Roadside Safety Enhancement. Realignment for Safety Upgrade X Pavement Markings: Paint Thermo X Markers X Ramp Work(at NC 109) . . . . . . . . . . . $ $ 3,181,847 $ $ $ 2,929,860.50 $ $ $ 560,560 1,092,000 $ 56,280 $ 262,640 $ 104,520 $ $ $ 363,000 $ 182,000 $ 25,000 $ 145,000 $ 1,000,000 D--- 'a PROJECT SCOPING SHEET (R-2534) Delineators $ Other Clearing, Grubbing, Mobilization $ 2,664,692.50 CONTRACT COST (Subtotal): $ 12,586,000 Contingencies & Engineering . . . . . . . . . $ 1,914,000 rr, Uoszs. . . . . . . . . . . . . . . . . . . $ Force Account . . . . . . . . . . . . . . . . $ Right of Way: Will Contain within Exist Right of Way: Yes Existing Right of Way Width: 200 feet New Right of Way Needed: Width Est. Cost $ Easements: Type Width Est. Cost $ Utilities: $ Right of Way Subtotal: $ No Y Total Estimated Cost $ (Includes R/W) Prepared By: Eddie Keith Date: August -3, 1993 The above scoping has been reviewed and approved* by: Highway Design Roadway Structure Design Services Geotechnical Hydraulics Loc. & Surveys Photogrammetry Prel. Est. Engr. Planning & Research Right of Way R/W Utilities Traffic Engineering Project Management County Manager City/Municipality Others INIT. DATE INIT. DATE Board of Tran. Member _ Manager, Program and Policy Branch Asst. Highway Admin. Secondary Roads Off. Construction Branch Landscape Maintenance Branch Bridge Maintenance Chief Engineer Division Engineer. Bicycle Coordinator DEHNR Scoping Sheets for local officials will be sent to Division Engineer for handling. Comments or Remarks: *If you are not in agreement with proposed project or scoping, note your proposed revisions in Comments or Remarks Section and, initial and date after comments. Subtotal: $ 14,500,000 Donn A ?J /.•: ;.11 lS' q,•`' •?? .o 9 co AP IA V f"L' I V CP 1.3 ° 1.0 E' t o 9s \ .c`` ?w I° 1 o 1+ (, I° 0 p C?k 'o 0 (D I v N T 7 N / N b .n p. 1\ •? I • 9 Icn IN- cn D Icn .N .? ?`? W JO ` I.... N N .S IW _? N ?N IN ?' h O y 4 lu, `$1 :u, - P J` u p p? o a f\\ lu' l o O w CO r /? y 1 co ( J .5 / ff 'N IV Q \\\ `APP I ? ?. ?` IN l ' .N • `tl iN •v N s a a ,? \ s? 9J, z 2 w ?'? Y I,o T .t,p .0 co ') l 2 N Cl) c + O *? .4 0 k IP I 14 j C) cn ^-?/ I.. 4 Q J N: I ? I .,?4':. W Imo' ? •j::':•:.v:: ?• I ` :: "o NORTN? t., q?ti Al /?'? 9 8 • A/??, P I IQ V r o J y IN b6' Vq` W ( / ':a ? IaP. E'_ 'a •??,: ? _ PPS /?ti W `IO y t /?? 4+ f Cl) fo, :. LT\ 0V.:::•::;'.::•: ;;:;: N 1 I? L J ' ;::. ?`" .s• ,?? -ate :? ? V ti ti Z• r ti Z' I C/) c 1.6 ti 10, J?j C?l 0 ? s 1.0 0 ?S r s loo 1.0 w lco C ?? Sd? lo.. 2y IJ ?`? IA \ T\i 9A o, :co a o V ` o o rio' -? I N can rn J `, r I N ?r. m Ic w 1.- " •? ? w ? .NI? ? :co ?(aaa? i? IN _0 N w ` rn _ i°o 0D '6 IA W _ C9?' w \ I S 5 ? !14 Io .3 v ' ?? 14 P 14 H H jV "' . H C1] r' ?A C a z r? Z Z v ? U o ° O H O O?- z Z °z? j r z ter. N. C. DEPARTMENT OF TRANSPORTATION TRANSMITTAL SLIP DATE TO: REF. NO. OR ROOM, BLDG. bsm FROM: REF. NO. OR ROOM, BLDG. (r J , e EEAA •/-- R1Pt}{? P-4/f-? ACTION ? NOTE AND FILE ? PER OUR CONVERSATION ? NOTE AND RETURN TO ME ? PER YOUR REQUEST ? RETURN WITH MORE DETAILS ? OR YOUR APPROVAL ? NOTE AND SEE ME ABOUT THIS FOR YOUR INFORMATION ? PLEASE ANSWER ? FOR YOUR COMMENTS ? PREPARE REPLY FOR MY SIGNATURE ? SIGNATURE ? TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT COMMENTS: 11 re? LTyd yr ,? N ?nn WwY STATE OF NORTH CAROLINA DEPARTMENT OF TMNSPORTATI JAMES B. HUNT, JR. GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 September 27, 1993 MEMORANDUM TO: Scoping Meeting Participants FROM: Eddie Keith Project Planning Engineer SUBJECT: NC 49 from north of the Yadkin River to the Randolph County Line, Davidson County, Federal Aid Project No. NH-49(2), State Project No. 8.1600801, TIP No. R-2534 A scoping meeting was held on 8-30-93 for the subject project. The following individuals attended the meeting: Jack Matthews Photogrammetry Sid Autry Location and Surveys Don Sellers Right of Way Jerry Snead Hydraulics Eric Galamb DEM Steve Kite Traffic Control Kathy Lassiter Roadway Design Jimmy Goodnight Roadway Design Mark Reep Planning and Environmental Frank Vick Planning and Environmental Eddie Keith Planning and Environmental Ray Moore Structure Design Danny Rogers Program Development David Foster DEHNR Wady Williams FHWA The meeting began with a brief overview of the project. The project calls for upgrading the existing two-lane roadway to a multi-lane facility. The project will provide a four-lane divided roadway with a 46-foot median contained within 200 feet of right of way. Existing NC 49 was originally constructed to allow for additional travel lanes to be constructed within the right of way. Frank Vick, from Planning and Environmental, mentioned that a Categorical Exclusion (CE) may be applicable for the project instead of an Environmental Assessment (EA) if NCDOT does own 200 feet of right of way 0 R. SAMUEL HUNT III SECRETARY September 27, 1993 Page 2 along the project corridor. After the meeting, Don Sellers, from Right of Way, confirmed that the existing right of way width is 200 feet. Planning and Environmental will coordinate with FHWA to determine if a CE is applicable for the project. Several design issues were addressed during the meeting. Kathy Lassiter, from Roadway Design, commented that the proposed design speed should be 60 mph to be consistent with the designs on the adjacent sections of NC 49. She indicated that the existing vertical alignment along NC 49 will be analyzed to determine if any portions of NC 49 need to be reconstructed to achieve the 60 mph design speed. At the NC 109 interchange, dual bridges are proposed along NC 49. Because of insufficient vertical clearance, the existing bridge will likely be replaced at the interchange. Full control of access exists at the interchange, but no access control is present along the rest of the project. Possible consideration for an interchange at NC 8 was discussed during the meeting. An interchange will be considered based on traffic volumes and accident data at this location. Jerry Snead, from Hydraulics, noted that the cost estimate for the project needs to reflect the cost for culvert extensions. Prior to the scoping meeting, Jim Turlington, Division Maintenance Engineer, commented on the proposed paved shoulder widths for NC 49 and possible left turn lanes at the crossovers along NC 49. Mr. Turlington suggested that consideration be given to providing four foot paved shoulders rather than two foot paved shoulders because of heavy truck traffic. The meeting participants felt that the paved shoulder widths should be based on traffic volumes in accordance with the NCDOT paved shoulder policy. Consideration will be given to constructing left turn lanes at the crossovers along the project. Eric Galamb, from the Department of Environmental Management (DEM), commented on environmental issues to be considered during the project development. Mr. Galamb pointed out that most of the project is contained within a water supply watershed area. Mr. Galamb gave the classifications for the stream crossings along the project. Most of the crossings along the project are classified as WS IV waters, and a few crossings are classified as class B and class C waters. Mr. Galamb asked that consideration be given to constructing hazardous spill catch basins at the stream crossings along the project because these streams flow into Badin Lake, a water supply reservoir for the surrounding area. Mr. Galamb also requested that consideration be given to widening on the northwest side of existing NC 49 at SR 2541 in order to avoid two crossings of Grassy Fork Creek and Cabin Creek. If NCDOT decides to widen on the southeast side of NC 49 at this location, coordination is needed with the Wildlife Resources Commission (WRC). David Foster, from the Department of Environment, Health, and Natural Resources (DEHNR), also commented on environmental issues to be considered during the project development. Mr. Foster noted two endangered plant species that may occur in the project area. These plant species are the Heartleaf Plantian and the Indigo Bush. The Heartleaf Plantian, found along Beaverdam Creek, is on the State Endangered List and is classified as a Federal Candidate Species (Class 3-C). The Piedmont Indigo Bush is on September 27, 1993 Page 3 the State Candidate List and can be found in the Uwharrie National Forest. Mr. Foster recommended that project R-2534 be coordinated with the adjoining bridge replacement project B-2612 so that possible impacts to the water supply watershed can be minimized. Prior to the scoping meeting, Robin Stancil, from the Department of Cultural Resources, commented on the cultural resources within the project area. Ms. Stancil indicated that there are no architecturally historic sites in the project area. She based this finding on a comprehensive study done for Davidson County in 1981. Ms. Stancil did indicate that an archaeological survey for the project area should be performed. Currently the project is scheduled for right of way acquisition in April 1997 and post year construction. Kathy Lassiter, from Roadway Design, indicated that she would contact Eddie Keith, from Planning and Environmental, concerning the schedule for functional designs and cost estimates. After the meeting, Roadway Design indicated that functional designs and cost estimates would be provided by March 1994. SEK/plr Attachment 11 •? y' .,??T? 1,? i '.0 T V jLn 00 0 1.3 q 'cp\ IUO lA yti to 1.0 P °° ti ti to 0 O \` I Q V E. z. w I c? o o 1Ul ? m P \ ,.? I N T •9 7 N N b j O N .S IJ N - ; N . IU W ?v \ O I - ,U iU IU 14 co .01 O 4? 114 1 .5 IN 2 2 w 9,? Y? i0 s n? A b? 9 O NI (TVA 1 F ` o 00 4 ?? qs •`? fps I$i «? ? rn ? /yti yy b, A _ IW IN ' ? _ U I PO •? '?_ /?? /?ti A J IJ w ,?O ?• IP I ti '? ? ? ?yti ,?? ? e C?l b Vti ? 9A P rn IA '? •? - /G,?'?' A .Joy ?d? \?a Z --j a _' IA IA ti 10, '.fib" o I A- UZI N Al NORTH D I Ox /? u !? ti •p. b 9, / w c •`• • /yV o• v:. o ;lo w 4' q V 1 _ IN /Liti? -~ V i T IP 0 - ry ?i Q Z' T ti C t' WT? ti a ti \Z• f ti ?.. y . `? \ V V, A ??, O > 'V •4 C/) c Ily 1.6 -0 I:Z4: '.'`> ? la `• .? ti ti ? ?` ? ? cn O. is l'o • •.? b b ti °'• A`' ago`? /'? l 1.0 C? 00 1 Iw 1.0 ?? l v o Iw Cl) C) n d :fit;: is E N >fd IO I to l Z to ?? \? J \ f ?'? I 00 O W Q IN .7\1?\ o N Iw I? \ ? ?(aaa? IJ fi to 0 loo °° N 6 • 4'` 1.1 ? ? ???'?. w ? is j1 0 0 J ? V P I -4 ^ IP O H ?? C V J I to ,. C 0z d tjl Z v o Cj) z ? 0 o 0 Z zp r z r? N. C. DEPARTMENT OF TRANSPORTATION TRANSMITTAL SLIP DATE '-:7;- /? - TO: REF. NO. OR ROOM, BLDG. cG (?aA dl'An In be m e FROM: REF. NO. OR ROOM, BLDG. ACTION ? NOTE AND FILE ? PER 9UR CONVERSATION ? NOTE AND RETURN TO ME ? PER YOUR REQUEST ? RETURN WITH MORE DETAILS ? FOR YOUR APPROVAL ? NOTE AND SEE ME ABOUT THIS ? OR YOUR INFORMATION ? PLEASE ANSWER VFOR YOUR COMMENTS ? PREPARE REPLY FOR MY SIGNATURE ? SIGNATURE ? TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT COMMENTS: p B3 " N wETLAN WATER QUA Y aS GROUP LITY SECTION y „a SfATFo W > STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT, JR. DIVISION OF HIGHWAYS GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 February 8, 1994 R. SAMUEL HUNT III SECRETARY MEMORANDUM TO: Mr. Eric Galamb DEM - DEHNR, 6th Floor FROM: H. Franklin Vick, P. E., Manager Planning and Environmental Branch SUBJECT: NC 49 from north of the Yadkin River to the Randolph County Line, Davidson County, Federal Aid Project No. NH-49(2), State Project No. 8.1600801, TIP No. R-2534 The Planning and Environmental Branch of the Division of Highways has begun studying the proposed improvements to NC 49. The project is included in the 1994-2000 North Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year 1997 and post year construction. The project calls for widening a 9.1 mile section of NC 49 between the Yadkin River and the Randolph County line to a four-lane divided facility with a 46-foot grass median. Another bridge will be constructed at the NC 109 interchange in order to carry the additional lanes of NC 49 over NC 109. The proposed improvements will be contained within the existing right of way. The project is shown on the attached vicinity map. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals which may be required by your agency. Your comments will be used in the preparation of a federally funded Categorical Exclusion. This document will be prepared in accordance with the National Environmental Policy Act. It is desirable that your agency respond by May 8, 1994 so that your comments can be used in the preparation of this document. If you have any questions concerning the project, please contact Eddie Keith, Project Planning Engineer, of this Branch at (919) 733-7842. HFV/plr Attachment RE VD lUk lco 14 ?.4 9 1.3 0 ° 0 0 / Cpk d q . ' ::> to o ??1 0 1,0 A 0 U W lA I ?o U •? ? K? I o V. ?' Z _( a N ?_> I T .9 7 'N f b P 1 r? D N V W ti o !Ln N N .S IW N iU N ?? IOD Jy v f% o 4 cn ?o A o I J?Q ICA IN I o. w <b n 0b r } 1 S 00 1-4 CID IU 2 2 . so I? To NIWTVA 'o 00 C- 4 ) 2 qs `? '`.s I01 N M -4 0 10 top W N A Ln 00 N. A ti y ?ti ?? ti C o ,y n `ate y ?i /14 3o Z-L c„ ? !/ /rte -? ??••.', b0 QG?' 04 411, C O• r '. 7 \ o Cl)? o d IP .Cj ti o (V 0` I ti w _ / f C-i / N L R'1 / w N G, ti i? .`-.? • • ??a}? X? w /yam I £. bQ. >v ..... ::...::..:.'RO; :: '::. .•a /?ti O? n aannaff ??` bti ?'' G / N tU p ti 8 t ?o "? ?- e r ti Q ti Li ti 1 ti ?0 J ?b J:j 1.6 S i ~ 1.0 Iw rs J \ loo 1.0 W C?`?.f \?•o 00 q V ro ?Cl) b ICI) co m w l,? (o rn IN 3 7 \l\ \ !G 10 `OWN ??aaa? ?? IN -0 to IW C ;? 0 co 10 IL9 1.1` 5? v is S 114 n m h 0 .0 O O 11 Io .3 pmp zbd?o is ?V a >MM N ? 2 S IP -Z= x o H H NZ00r-OZ 70 ?? O H Cil t'' IU 2 `A A0 m<c c d t2i y z L K) zaa c?zd O Z (AI 0 ?Z zz I O H? r- M T mm z ???.?y G) M y y z N r z M ?d yam„ JAMES B. HUNT. JR. GOVERNOR February 8, 1994 MEMORANDUM TO: FROM: STATE OF NORTH CAROLINA DEPARTMENT OF TMNSPORTATION DIVISION OF HIGHWAYS P.O. BOX 25201. RALEIGH. N.C 27611-5201 R. SAMUEL HUNT III SECRETARY Mr. Eric Galamb DEM - DEHNR, 6th Floor H. Franklin Vick, P. E., Manager Planning and Environmental Branch ` SUBJECT: NC 49 from north of the Yadkin River to the Randolph County Line, Davidson County, Federal Aid Project No. NH-49(2), State Project No. 8.1600801, TIP No. R-2534 The Planning and Environmental Branch of the Division of Highways has begun studying the proposed improvements to NC 49. The project is included in the 1994-2000 North Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year 1997 and post year construction. The project calls for widening a 9.1 mile section of NC 49 between the Yadkin River and the Randolph County line to a four-lane divided facility with a 46-foot grass median. Another bridge will be constructed at the NC 109 interchange in order to carry the additional lanes of NC 49 over NC 109. The proposed improvements will be contained within the existing right of way. The project is shown on the attached vicinity map. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals which may be required by your agency. Your-comments-will-be used in the preparation of a federally funded Categorical Exclusion. This document will be prepared in accordance with the National Environmental Policy Act. It is desirable that your agency respond by May 8, 1994 so that your comments can be used in the preparation of this document. -- If you have any-questions-concerning--the project, please contact Eddie Keith, Project Planning Engineer, of this Branch at (919) 733-7842. HFV/plr Attachment -u 00 .4 IU w 1.3 w 1.0 £' t o v 9S. / w, I . o --1 .i I A IA (? •p ICA? 7 (D •? N I J l p. \ l•? 1 N -n IN' D IU N ?? t^ \ IN N S IW U U IN CQ Jo 4 i„ I _ A v !LA 0000 1 c J. O Q f\\' IU t ° o. w q, cn p X0-0 \ y l .S cn IP ? ? I iJ ? t ? 'S? ,_, Icn A •2 w 9,p Y\ ?U ?. n OD o ? J -: ATI1l Q YL1 / 1 Fqs `f\r? I$i D co m ti c f Q` / ? ? ? A N ? `O O Cl) `• J I J '? ? , to ? .?? ? ?`? ,? ? Cl) Co I°' _ 00 F f n 4 Cb ?? Z•t ??ti co Cb 9A Oil Ip F'% .? ?, O d l Nei IN W ? ? ^a'::?• r T Z• ? ,O 8. TH r' I is q, 0 l (' l? r - __ IN`! %?` •:,?? bey VQ .i S ? • IP ,0 1 1?'•? ? Z' ,'? ? cl) 1 q w CV % Rp.::''.::: :: d ?ti Opp pan ff ti ti 8 t' ?o ?D <; ?-- 1s /AV / ti a ti?ti Q?ti ?Q r 0, ? ti ti 00 1 t• ti ?? ?Cr 0 ti ti G ILI) J 0117 IV.? N Cl) 14 ti.. s sd I? ?f, s . ?? C/) 1.0 S . ` ?oo IJN W cn 1 0 \ v . C C Jr,' co IA _ Q W t o Cl) •/ ice: `` IN `1`\ ?• IC, / ;?i'•' n ^: £ to ;oo 0 :3 Z(D o'co ti IO P IN 3 \ ?''\ rn J 4 I IOD W W V ! f\ ' I,:, aa? ?o?? o o b IW co •.. Ln C 14 1.1 ` . S IV s -+ III 10 0 3 00 I - iv mo l14 > M M - O Z N Z Q = ?U _? MNo?z ?p?p ? j O < H tm ti 2 Aa0-< ?xza v d o z Z C: D G ZtA r- m O Z -n m< 0 C3 m mm 'z-3 C Z Z Z o 41 z _ tz! State of North Carolina Department of Environment, Health and Natural Resources LT4 • • Division of Environmental Management James B. Hunt, Jr., Governor C Jonathan B. Howes, Secretary ? G ?--? N A. Preston Howard, Jr., P.E., Director March 18, 1994 MEMORANDUM TO: Melba McGee, Office of Policy Development FROM: Monica Swihart, Water Quality Planning SUBJECT: Project Review #94-0585; Scoping Comments - NC DOT Improvements to NC 49, Davidson County, TIP No. R-2534 The Water Quality Section of the Division of Environmental Management requests that the following topics be discussed in the environmental documents prepared on the subject project: A. Identify the streams potentially impacted by the project. The stream classifications should be current. B. Identify the linear feet of stream channelizations/ relocations. If the original stream banks were vegetated, it is requested that the channel ized/ relocated stream banks be revegetated. C. Number of stream crossings. D. Will permanent spill catch basins be utilized? DEM requests that these catch basins be placed at all water supply stream crossings. Identify the responsible party for maintenance. E. Identify the stormwater controls (permanent and temporary) to be employed. F. Please ensure that sediment and erosion and control measures are not placed in wetlands. G. Wetland Impacts 1) Identify the federal manual used for identifying and delineating jurisdictional wetlands. 2) Have wetlands been avoided as much as possible? 3) Have wetland impacts been minimized? 4) Discuss wetland impacts by plant communities affected. 5) Discuss the quality of wetlands impacted. 6) Summarize the total wetland impacts. 7) List the 401 General Certification numbers requested from DEM. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper ?v Melba McGee March 18, 1994 Page 2 H. Will borrow locations be in wetlands? Borrow/waste areas should avoid wetlands to the maximum extent practicable. Prior to approval of any borrow/waste site in a wetland, the contractor shall obtain a 401 Certification from DEM. I. Did NCDOT utilize the existing road alignments as much as possible? Why not (if applicable)? J. To what extent can traffic congestion management techniques alleviate the traffic problems in the study area? K. Please provide a conceptual mitigation plan to help the environmental review. The mitigation plan may state the following: 1. Compensatory mitigation will be considered only after wetland impacts have been avoided and minimized to the maximum extent possible. 2. On-site, in-kind mitigation is the preferred method of mitigation. In-kind mitigation within the same watershed is preferred over out-of-kind mitigation. 3. Mitigation should be in the following order: restoration, creation, enhancement, and lastly banking. Written concurrence of 401 Water Quality Certification may be required for this project. Applications requesting coverage under our General Certification 14 or General Permit 31 will require written concurrence. Please be aware that 401 Certification maybe denied if wetland impacts have not been avoided and minimized to the maximum extent practicable. 10533er.mem cc: Eric Galamb