HomeMy WebLinkAbout20181527 Ver 1_Sediment Loss Restoration_20200324LMG
LAND MANAGEMENT GROUP
a VA&Y'1 company
3/24/20
Emily Greer
US Army Corps of Engineers
Regulatory Branch
69 Darlington Avenue
Wilmington, N.C. 28403
Re: Salters Haven Phase 2
Dear Emily,
The Salters Haven development is currently underway in Hampstead. WLI Investments, LLC
needs to obtain necessary regulatory permitting for minor jurisdictional impacts within Phase
2. In order to record the Phase 2 plat that would allow the sale of those lots, the developer
must obtain bonding which requires that all permitting be in place. LMG understands that we
will be applying for a modification of the Corps GP 291 to authorize the Phase 2 work.
Moving forward with the permitting process is necessary since the developer reports that 175
couples are scheduled to visit the site on April 281h for lot sale reservations .
Recently, you relayed some concerns about possible turbidity noted downstream of the on-
going development and sedimentation issues. On 3/19/20, LMG staff visited the site and
examined conditions throughout the development and downstream. We have attached photos
taken during that visit and location information.
We examined the Grovediere Lane stream crossing and noted elevated turbidity on the
downstream (east) side while the stream water on the upstream (west) side was notably clear
indicating possible erosion or undermining of the culvert pipe itself or some other source of
turbidity to the downstream side. Along Factory Road we noted sediment accumulation from
the eroding swale along the north side of the road moving into the downstream flow. This is a
result of recent powerline work disturbance (not the Salters Haven development), which has
yet to stabilize. We then examined the sediment and erosion control measures taken within the
development and found effective disturbed area containment and remedial actions taken after
substantial rainfall events. We did note some minor maintenance items that we have discussed
with the developer and those items are being addressed.
LMG would like to move forward with the Corps permitting for Phase 2 of the development.
We would like to make our submittal so that the review can proceed in a timely manner.
Please contact us with any questions that you may have and we look forward to your
response. Thank you for your assistance.
1
www.lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403
Sincerely,
Steve Morriso
Environmental Consultant
Attachments
Cc: Mickey Sugg
Robb Mairs
WLI Investments, LLC
www.lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403
(1) Overview of Salters Haven Stream Outlet and Downstream Waters
(2) View of powerline disturbance along Factory Rd causing sedimentation in downstream waters (looking
north towards stream)
Salter's Haven Site Photos 1 I P a g e
03/19/2020
7, A
(3) View of sedimentation from powerline disturbance (looking north - at stream confluence)
(4) View of sedimentation from powerline disturbance (looking (east) downstream)
Salter's Haven Site Photos 2 1 P a g e
03/19/2020
(S) View at Grovediere Ln with little sedimentation (looking upstream (west) towards Salters Haven)
.T*
(6) View at Grovediere Ln looking downstream (east) with sedimentation present (potential washed out
culvert)
Salter's Haven Site Photos 3 1 P a g e
03/19/2020
MT.
P S-%
'w7 4.
(7) Overview of Photo Station location along southern part of tract
P- -
(8) View of PSI (looking south - silt fencing and rock check dam in place to prevent sedimentation into
downstream waters)
Salter's Haven Site Photos 4 1 P a g e
03/19/2020
(9) Overview of PSI sediment and erosion control measures (looking south)
(10) View at PS2 of sediment removal area (looking south -new vegetation re -sprouting)
Salter's Haven Site Photos 5 1 P a g e
03/19/2020
(11) View at PS2 of sediment removal area with silt fencing in place (looking west)
(12) View at PS3 of silt fencing in uplands (looking north)
Salter's Haven Site Photos 6 1 P a g e
03/19/2020
(15) View at PS5 of head of wetland with silt fence and rock check dams in place (minimal
sedimentation at foot of culvert)
(16) View of sewer grate at PS5 with silt fence and rock check dam in place, grass seed, & hay bales
in field to prevent sedimentation of downstream waters
Salter's Haven Site Photos 8 1 P a g e
03/19/2020
r
.-
(17) View of roadside swale (non -jurisdictional) at PS6. Sediment present. Coir fiber waddles or silt
fence to be installed to prevent sediment entry to culvert
(18) View of culvert at PS6 with screen in place. Additional waddles to be installed.
Salter's Haven Site Photos 9 1 P a g e
03/19/2020
(19) PS7 - View of hay bales in place in seeded areas to help prevent erosion
(20) Overview of Photo Station location along northern part of the tract
Salter's Haven Site Photos 10 1 P a g e
03/19/2020
(21) View of silt fence at PS8 effectively holding sediment at temporary crossing area (uplands
below silt fence seeded with grass seed)
r
�y
4�-+.. .:iPS-Aim':• _. •:�: Y ��_.�.. _ _ ._ . 1+_ -
(22) View of pond outlet seeded and with hay down at PS9. Silt fence to be installed around tip of
peninsula.
Salter's Haven Site Photos 11 IPage
03/19/2020
(23) View of minor silt fence failure at PSIO
(24) View of RPW4 (PS10) with silt fence and seeded bank
Salter's Haven Site Photos
03/19/2020
12 1 Page
(25) View of upper end of wetland at PS11 with silt fence in place with banks seeded
(26) View of temporary impact area downstream of PS11 (60" stormwater pipe) just upstream of
head of stream. Silt fence up and area stabilized.
Salter's Haven Site Photos 13 1 P a g e
03/19/2020
(27) View at PS12 of upper end of RPWS (looking upstream). Silt fence up and banks seeded and
stabilized
(28) Rock check dam installed at upper end of Wetland E (PS13)
Salter's Haven Site Photos 14 1 P a g e
03/19/2020
�r fi
Ilk a.
VFW
y• I
i.:s i
' SSA'' 'Ir ;� � •... - ..�_..:• -_ `!�'�}•�,�;_e-',
Y`.Y
� •rye. ' o� �,.
(31) View of stream outlet at PS14 (looking west towards project)
(32) View of stream outlet area at PS14 (looking southwest) with silt fence up and areas adjacent to
stream seeded
Salter's Haven Site Photos 16 1 P a g e
03/19/2020
Salter's Haven Site Photos 17 1 P a g e
03/19/2020
Strickland, Bev
From: Morrison, Stephen <smorrison@lmgroup.net>
Sent: Tuesday, March 24, 2020 2:18 PM
To: Greer, Emily C CIV USARMY CESAW (US); Mickey Sugg; Mairs, Robb L
Cc: Wes Fryar; Kim Williams
Subject: [External] Salter Haven Phase 2 permitting
Attachments: Phase 2 signed Corps letter.pdf, Photos_03-19-20.pdf
27`17'rExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
rbort.spam@nc.gov
Please see the attached. Thank you.
Steve Morrison I Environmental Consultant
Direct: 452-0001 x 1903 1 Fax: 910.452.0060 1 Mobile: 910.471.0502
Email: smorrison(vD_lmgroup.net I Website: www.lmqroup.net flmgroup.netl
Land Management Group I Environmental Consultants
3805 Wrightsville Avenue I Suite 15 1 Wilmington, N.C. 28403
1