Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4200501_Signed Stormwater Narrative_6th submittal_20200602
STO RMWAT E R NARRATIVE Lewisville Muddle School Lewisville Vienna Road Lewisville, North Carolina 27023 June 2020 CLH design, p.a. 400 Regency Forest Drive, Suite 120 Cary, North Carolina 27518 Phone: (919) 319-6716 Fax: (919) 319-7516 CONTENTS Design Narrative Supporting Calculations STORMWATER MANAGEMENT PLAN LEWISVILLE MIDDLE SCHOOL LEWISVILLE-VIENNA ROAD LEWISVILLE, NC CLH Project No: 17-116 PROJECT DESCRIPTION: Lewisville Middle School is a new school that is being constructed on five tracts located southeast of the intersection of Lewisville -Vienna Road and Robinhood Road near the northern limits of Lewisville. The middle school project area is approximately 79 acres. This proposed project consists of constructing a new school with parking, sidewalks, play fields, utilities and stormwater control measures. The construction limits of the project contain approximately 30 acres. The stormwater runoff from the project site discharges easterly to a tributary of Tomahawk Creek (Classification: Q. Streams with 30-foot Town of Lewisville stream buffers are on site, as well as floodway and floodplains as indicated on FEMA FIRM #3710588600J dated January 2, 2009. Soils on the site consist predominately of Hiwasse with minor concentrations of Wahadkee along streams in low areas of site. STORMATER MANAGEMENT: This site is divided and under the stormwater jurisdiction of the Town of Lewisville and NCDEQ for stormwater review. Stormwater design has taken into consideration both Town and State requirements and was design to the most stringent of requirements. This site drainages to three major drainage points. Drainage point A encompasses the majority of drainage area and is located along the midpoint of the eastern property boundary. Drainage point B is located at the southeastern property corner. Drainage point C is located west of drainage point B, along the southern property boundary. Please refer to the stormwater drainage map for additional information. This site is high -density and employs a stormwater network to convey runoff and two ponds to treat. A wet pond treats the majority of the site's runoff and the wetland treats the bus -loop driveway. Per the Town of Lewisville's stormwater management manual, stormwater control measures were designed to control and treat runoff from the 25-year, 6-hour storm leaving the site. The majority of the site has a hydrological soil rating of HSG B and, therefore, storm calculations will reflect constants relating to HSG B type soils. Calculations were performed with Hydraflow software by Autocad 2017 which utilizes the TR-55 Hydrograph method. Additional modeling information has been provided, as requested by the state. This includes a model of the stage storage for the main pool and for the forebay. These were requested and shall be used only as verification with our calculations. There is a 0.2% discrepancy between the wet pond sizing calculations and the hydraflow model of the stage storage as a result of slightly different methodologies for calculating storage volume. This discrepancy should be acceptable per email conversation with Hannah Banks and Jim Farkas. In lieu of receiving a legal agreement among the offsite parcel owners for future BUA allotments as it pertains to the stormwater treatment in the wet pond, the portion of offsite drainage area has been concluded as 100% impervious for less restructure for future development. SUPPORTING CALCULATIONS DATE 8/15/19 PROJECT NAME PROJECT NO Lewisville MS 17-116 0 (f LOCATION BY Forsvth Countv. NC KAL Drainage Area, (DA) = 18.65 ac Impervious Area c= 0.95 8.62 ac Pervious Area c= 0.30 10.03 ac Cc = 0.60 % Impervious = 46.22 % Soil Type: Hiwasse (Type B) Temporary Water Quality Pool Design Storm Rainfall 1.00 in (Typically 1-in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.47 in/in Required Volume (design rainfall)(Rv)(DA) = 31,547 cf Main Pool Volume Required, Vmp = 76,847 cf Main Pool Volume: Main Pool Max. Depth = 3.50 ft Area of Pond Bottom (Above PSS) = 20,780 sf Area at Bottom of Shelf = (826.00) 27,620 sf Area of Permanent Pool = (826.50) 30,040 sf Area at Top of Shelf = (827.00) 32,530 sf Perm. Pool Volume Provided = 87,015 cf > 76,847 cf Surface Area at 1" Storage Volume = 33,800 sf (based on 12" depth) 1" Storage Volume Provided = 32,225 cf > 31,547 OK Required Design Volume= 31,547 cf Interpolation From Stage -Storage Table (Hydraflow Hydrographs)= Elevation Depth Storaae 827.30 ft 0.80 ft 30484 cf Depth at Rea'd DE 827.35 ft 0.85 ft 32472 cf Volume (ft) _ 0.83 Temp. Storage Depth above Dewatering Hole = 0.83 ft Diameter of Dewatering Hole = 2.50 in Detention (Draw -Down) Time = 4.5 days T days=(Temp. Storage Vol Req / (0.6 * A (2'g*(h))A1/2) , 86400 (where h = one third temp. storage depth measured to centroid of orifice) Max Drawdow Rate= 0.14 cfs Main Pool Volume- 87,015 cf Forebay Volume: Forebay Max. Depth = Area of Forebay Bottom (Above PSS) _ Area at Bottom of Shelf = Area of Permanent Pool = Forebay Volume Required = Forebay Volume Provided = (2-5 days Required) 4.50 ft 1,540 sf 4,400 sf 5,330 sf 11,527 - 15,369 14,313 cf 16.45 % _ 76,847 OK 15-20 OK s:\1319\0001 \calcs\17-116 - PondSize-Wet Pond-MDC-Piedmont and Mountain-HRTIXk&d: 6/2/2020 9:49 AM Page 1 Of 1 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Pond No. 4 - Forebay Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 822.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (tuft) 0.00 822.00 1,540 0 0 2.00 824.00 2,800 4,277 4,277 4.00 826.00 4,400 7,139 11,417 4.50 826.50 5,330 2,429 13,845 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 1000.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 826.50 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = --- --- Broad --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 822.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.00 4,277 824.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.00 11,417 826.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.50 13,845 826.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Pond No. 3 - Main Pool Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 823.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (tuft) 0.00 823.00 20,780 0 0 1.00 824.00 22,990 21,874 21,874 3.00 826.00 27,620 50,534 72,408 3.50 826.50 30,040 14,409 86,817 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 1000.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 826.50 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = --- --- Broad --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 823.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.00 21,874 824.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.00 72,408 826.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.50 86,817 826.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 ' DATE 8/15/19 PROJECT NAME PROJECT NO Lewisville MS 17-116 LOCATION BY Forsyth County, NC KAL Drainage Area, (DA) = Impervious Area c= 0.95 Pervious Area c= 0.30 Cc = Wetland Surface Area & Volume % Impervious = Design Storm Rainfall Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) _ Required Volume (design rainfall)(Rv)(DA) _ Depth of Temporary Pool (Dplants) = Approx. Ave. Surface Area for Design = 2.05 ac 0.75 ac 1.30 ac 0.54 37 % 1.00 in 0.38 in/in 2,822 cf 12 in 2,822 sf Includes 0.06 AC Future (15-in max) Surface Area at Permanent Pool= ( 812.00) 2,738 sf @ 0.0 in. ponding Surface Area at 1/2 Depth= ( 812.50) 3,908 sf @ 6.0 in. ponding Surface Area at Secondary Spillway= ( 813.00) 4,676 sf @ 12.0 in. ponding Temporary Ponding Volume Provided= 3,808 cf > 2,822 cf OK Required Design Volume= 2,822 cf Interpolation From Stage -Storage Table (Hydraflow Hydrographs)= Elevation Depth Storage 812.60 ft 0.60 ft 2436 cf 812.80 ft 0.80 ft 3248 cf Surface Area at Design Volume Depth (sf) = 4274 sf Depth at Reg'd Design Volume (ft) _ 0.70 Temp. Storage Depth above Dewatering Hole = 0.70 ft Diameter of Dewatering Hole = 1.00 in Detention (Draw -Down) Time = 2.7 days T days=(Req. Temp. Storage Vol / (0.6 * A * (2*g*(h ))Al /2) * 86400 (where h = one third temp. storage depth measured to centroid of orifice) Wetland Zones Required Forebay Surface Area (10-15%) = 427 - 641 sf Non-Forebay Deep Pools (5-15%) = 214 - 641 sf Shallow Water Zone (35-45%) = 1496 - 1923 sf Temp. Inundation Zone (30-45%) = 1282 - 1923 sf Wetland Zones Provided Forebay Surface Area = 539 sf 13% OK Non-Forebay Deep Pools = 373 sf 9% OK Shallow Water Zone = 1,826 sf 43% OK Temporary Inundation Zone = 1,536 sf 36% OK s:\1319\0001\calcs\17-116 - PondSize-Wet1and-2017-MDC.XLS printed: 6/2/2020 9:03 AM Page 1 of 1 Wetland Stage -Storage Elevation Cross Sectional Area Notes Sediment storage bottom @ forebay 809 51 entrance Forebay bottom @ entrance/Sediment 809.5 116 storage bottom @ forebay exit 810 208 131 Forebay bottom @ exit/ bottom of deep pool 811 463 315 Forebay/Deep Pool Shallow Water Zone Bottom/Forebay & DP 811.25 539 373 To Permanent Pool/Shallow Water Top/ Temp. 812 2738 Inundation Bottom 812.7 Temporary Pool WSE/Temp. Inundation Top 4274 813 4676 Secondary Spillway Elevation 814.13 5662 Peak Attenuation WSE �y'draibw Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Return Period ReH Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 3.011 9.441 ------- ------- 43.34 71.95 ------- 127.39 Area A - Pre 2 SCS Runoff ------ 0.147 0.883 ------- ------- 4.334 6.951 ------- 11.83 Area B - Pre & Post 3 SCS Runoff ------ 0.048 0.290 ------- ------- 1.424 2.284 ------- 3.887 Area C - Pre & Post 7 SCS Runoff ------ 29.10 41.83 ------- ------- 79.43 103.53 ------- 144.14 Area to SCM 1 8 Reservoir 7 0.574 1.363 ------- ------- 5.545 10.15 ------- 49.34 Route SCM 1 10 SCS Runoff ------ 2.885 4.272 ------- ------- 8.379 11.10 ------- 15.72 Area to SCM 2 11 Reservoir 10 0.063 0.215 ------- ------- 2.302 5.806 ------- 11.58 Route SCM 2 13 SCS Runoff ------ 2.558 7.646 ------- ------- 33.24 54.48 ------- 95.18 Area A that bypasses SCMs 15 Combine 8, 11, 13, 2.718 8.436 ------- ------- 39.94 66.51 ------- 131.12 Total Area A - Post Dev Proj. file: 17-116 Pond Routing.gpw Tuesday, 06 / 2 / 2020 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.011 2 762 46,894 ------ ------ ------ Area A - Pre 2 SCS Runoff 0.147 2 722 1,393 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 0.048 2 722 458 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 29.10 2 720 66,934 ------ ------ ------ Area to SCM 1 8 Reservoir 0.574 2 1124 54,862 7 827.74 48,575 Route SCM 1 10 SCS Runoff 2.885 2 718 5,808 ------ ------ ------ Area to SCM 2 11 Reservoir 0.063 2 1042 4,585 10 813.03 4,192 Route SCM 2 13 SCS Runoff 2.558 2 760 36,954 ------ ------ ------ Area A that bypasses SCMs 15 Combine 2.718 2 760 96,402 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 1 Year Tuesday, 06 / 2 / 2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 3.011 cfs Storm frequency = 1 yrs Time to peak = 12.70 hrs Time interval = 2 min Hyd. volume = 46,894 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' ' ---" 0 2 4 — Hyd No. 1 Area A - Pre Hyd. No. 1 -- 1 Year 6 8 10 12 14 16 Q (cfs) 4.00 3.00 2.00 1.00 V ' 0.00 18 20 22 24 26 Time (hrs) Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 2 4 Hyd No. 2 Area B - Pre & Post Hyd. No. 2 -- 1 Year Tuesday, 06 / 2 / 2020 = 0.147 cfs = 12.03 hrs = 1,393 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.80 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 0.10 0.09 0.08 0.07 0.05 0.04 0.03 0.02 0.01 0.00 0 2 4 Hyd No. 3 Area C - Pre & Post Hyd. No. 3 -- 1 Year Tuesday, 06 / 2 / 2020 = 0.048 cfs = 12.03 hrs = 458 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 29.10 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 66,934 cuft Drainage area = 18.650 ac Curve number = 78* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(10.030 x 61) + (8.620 x 98)] / 18.650 Q (cfs) 30.00 25.00 15.00 10.00 5.00 0.00 0 2 4 Hyd No. 7 6 8 Area to SCM 1 Hyd. No. 7 -- 1 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report I U Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used Q (cfs) 30.00 25.00 15.00 10.00 5.00 0.00 0 10 Hyd No. 8 Route SCM 1 Hyd. No. 8 -- 1 Year 20 30 40 Hyd No. 7 Tuesday, 06 / 2 / 2020 = 0.574 cfs = 18.73 hrs = 54,862 cuft = 827.74 ft = 48,575 cuft 50 60 70 80 90 I_I_I_I_I_I_1 Total storage used = 48,575 cuft Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 1 0.00 100 Time (hrs) Pond Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Pond No. 1 - SCM 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 826.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (tuft) 0.00 826.50 35,380 0 0 0.50 827.00 38,870 18,554 18,554 1.00 827.50 40,680 19,884 38,438 1.50 828.00 42,820 20,871 59,308 3.50 830.00 48,600 91,350 150,658 5.50 832.00 54,620 103,151 253,809 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 30.00 2.50 0.00 0.00 Crest Len (ft) = 19.00 10.00 1.00 0.00 Span (in) = 30.00 2.50 0.00 0.00 Crest El. (ft) = 829.50 830.00 827.50 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 823.50 826.50 0.00 0.00 Weir Type = 1 Broad Rect --- Length (ft) = 62.00 0.50 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 826.50 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.05 1,855 826.55 24.65 oc 0.00 is --- --- 0.00 0.00 0.00 --- --- --- 0.005 0.10 3,711 826.60 24.65 oc 0.02 is --- --- 0.00 0.00 0.00 --- --- --- 0.018 0.15 5,566 826.65 24.65 oc 0.04 is --- --- 0.00 0.00 0.00 --- --- --- 0.035 0.20 7,422 826.70 24.65 oc 0.05 is --- --- 0.00 0.00 0.00 --- --- --- 0.051 0.25 9,277 826.75 24.65 oc 0.06 is --- --- 0.00 0.00 0.00 --- --- --- 0.063 0.30 11,132 826.80 24.65 oc 0.07 is --- --- 0.00 0.00 0.00 --- --- --- 0.073 0.35 12,988 826.85 24.65 oc 0.08 is --- --- 0.00 0.00 0.00 --- --- --- 0.081 0.40 14,843 826.90 24.65 oc 0.09 is --- --- 0.00 0.00 0.00 --- --- --- 0.089 0.45 16,698 826.95 24.65 oc 0.10 is --- --- 0.00 0.00 0.00 --- --- --- 0.096 0.50 18,554 827.00 24.65 oc 0.10 is --- --- 0.00 0.00 0.00 --- --- --- 0.103 0.55 20,542 827.05 24.65 oc 0.11 is --- --- 0.00 0.00 0.00 --- --- --- 0.110 0.60 22,531 827.10 24.65 oc 0.12 is --- --- 0.00 0.00 0.00 --- --- --- 0.116 0.65 24,519 827.15 24.65 oc 0.12 is --- --- 0.00 0.00 0.00 --- --- --- 0.121 0.70 26,507 827.20 24.65 oc 0.13 is --- --- 0.00 0.00 0.00 --- --- --- 0.127 0.75 28,496 827.25 24.65 oc 0.13 is --- --- 0.00 0.00 0.00 --- --- --- 0.132 0.80 30,484 827.30 24.65 oc 0.14 is --- --- 0.00 0.00 0.00 --- --- --- 0.137 0.85 32,472 827.35 24.65 oc 0.14 is --- --- 0.00 0.00 0.00 --- --- --- 0.142 0.90 34,461 827.40 24.65 oc 0.15 is --- --- 0.00 0.00 0.00 --- --- --- 0.146 0.95 36,449 827.45 24.65 oc 0.15 is --- --- 0.00 0.00 0.00 --- --- --- 0.151 1.00 38,438 827.50 24.65 oc 0.16 is --- --- 0.00 0.00 0.00 --- --- --- 0.155 1.05 40,525 827.55 24.65 oc 0.16 is --- --- 0.00 0.00 0.04 --- --- --- 0.197 1.10 42,612 827.60 24.65 oc 0.16 is --- --- 0.00 0.00 0.11 --- --- --- 0.269 1.15 44,699 827.65 24.65 oc 0.17 is --- --- 0.00 0.00 0.19 --- --- --- 0.361 1.20 46,786 827.70 24.65 oc 0.17 is --- --- 0.00 0.00 0.30 --- --- --- 0.470 1.25 48,873 827.75 24.65 oc 0.18 is --- --- 0.00 0.00 0.42 --- --- --- 0.592 1.30 50,960 827.80 24.65 oc 0.18 is --- --- 0.00 0.00 0.55 --- --- --- 0.726 1.35 53,047 827.85 24.65 oc 0.18 is --- --- 0.00 0.00 0.69 --- --- --- 0.872 1.40 55,134 827.90 24.65 oc 0.19 is --- --- 0.00 0.00 0.84 --- --- --- 1.029 1.45 57,221 827.95 24.65 oc 0.19 is --- --- 0.00 0.00 1.00 --- --- --- 1.195 1.50 59,308 828.00 24.65 oc 0.19 is --- --- 0.00 0.00 1.18 --- --- --- 1.371 1.70 68,443 828.20 24.65 oc 0.21 is --- --- 0.00 0.00 1.95 --- --- --- 2.158 1.90 77,578 828.40 24.65 oc 0.22 is --- --- 0.00 0.00 2.84 --- --- --- 3.063 2.10 86,713 828.60 24.65 oc 0.23 is --- --- 0.00 0.00 3.84 --- --- --- 4.074 2.30 95,848 828.80 24.65 oc 0.24 is --- --- 0.00 0.00 4.94 --- --- --- 5.179 2.50 104,983 829.00 24.65 oc 0.25 is --- --- 0.00 0.00 6.12 --- --- --- 6.372 2.70 114,118 829.20 24.65 oc 0.26 is --- --- 0.00 0.00 7.38 --- --- --- 7.646 Continues on next page... N scM 1 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B ft cuft ft cfs cfs cfs cfs cfs cfs 2.90 123,253 829.40 24.65 oc 0.27 is --- --- 0.00 0.00 3.10 132,388 829.60 24.65 oc 0.28 is --- --- 2.00 0.00 3.30 141,523 829.80 24.65 oc 0.29 is --- --- 10.40 0.00 3.50 150,658 830.00 35.80 oc 0.26 is --- --- 22.37 0.00 3.70 160,973 830.20 49.06 is 0.18 is --- --- 37.06 2.33 3.90 171,288 830.40 54.02 is 0.11 is --- --- 44.86 s 6.58 4.10 181,604 830.60 55.88 is 0.08 is --- --- 47.69 s 12.08 4.30 191,919 830.80 57.29 is 0.07 is --- --- 49.75 s 18.60 4.50 202,234 831.00 58.50 is 0.06 is --- --- 51.44 s 26.00 4.70 212,549 831.20 59.59 is 0.05 is --- --- 52.89 s 34.18 4.90 222,864 831.40 60.62 is 0.04 is --- --- 54.18 s 43.07 5.10 233,179 831.60 61.60 is 0.04 is --- --- 55.37 s 52.63 5.30 243,494 831.80 62.55 is 0.03 is --- --- 56.51 s 62.79 5.50 253,809 832.00 63.47 is 0.03 is --- --- 57.56 s 73.54 ... End Wr C Wr D Exfil User Total cfs cfs cfs cfs cfs 8.72 --- --- --- 8.996 10.13 --- --- --- 12.42 11.62 --- --- --- 22.31 13.16 --- --- --- 35.80 11.83 s --- --- --- 51.38 9.05 s --- --- --- 60.59 8.10 s --- --- --- 67.96 7.46 s --- --- --- 75.89 7.00 s --- --- --- 84.50 6.64 s --- --- --- 93.77 6.37 s --- --- --- 103.67 6.15 s --- --- --- 114.19 5.98 s --- --- --- 125.32 5.84 s --- --- --- 136.97 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 2.885 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 5,808 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 10 Area to SCM 2 Hyd. No. 10 -- 1 Year 6 8 10 12 14 16 Q (cfs) 3.00 2.00 1.00 0.00 18 20 22 24 26 Time (hrs) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation Reservoir name = SCM 2 Max. Storage Storage Indication method used. Q (cfs) 3.00 2.00 1.00 0.00 0 10 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 1 Year 20 30 40 Hyd No. 10 Tuesday, 06 / 2 / 2020 = 0.063 cfs = 17.37 hrs = 4,585 cuft = 813.03 ft = 4,192 cuft 50 60 70 80 90 I_I_I_I_I_I_1 Total storage used = 4,192 cuft Q (cfs) 3.00 2.00 1.00 1 0.00 100 Time (hrs) Pond Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Pond No. 2 - SCM 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 812.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (tuft) 0.00 812.00 2,738 0 0 2.00 814.00 5,545 8,119 8,119 4.00 816.00 7,468 12,964 21,083 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 0.75 0.00 0.00 Crest Len (ft) = 11.00 8.00 1.00 0.00 Span (in) = 15.00 0.75 0.00 0.00 Crest El. (ft) = 814.00 815.00 813.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 809.50 812.00 0.00 0.00 Weir Type = 1 Broad Rect --- Length (ft) = 54.00 0.50 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 2.78 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 812.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.20 812 812.20 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.006 0.40 1,624 812.40 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.009 0.60 2,436 812.60 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.011 0.80 3,248 812.80 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.013 1.00 4,059 813.00 8.09 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.015 1.20 4,871 813.20 8.09 is 0.02 is --- --- 0.00 0.00 0.30 --- --- --- 0.314 1.40 5,683 813.40 8.09 is 0.02 is --- --- 0.00 0.00 0.84 --- --- --- 0.860 1.60 6,495 813.60 8.09 is 0.02 is --- --- 0.00 0.00 1.55 --- --- --- 1.567 1.80 7,307 813.80 8.09 is 0.02 is --- --- 0.00 0.00 2.38 --- --- --- 2.403 2.00 8,119 814.00 8.09 is 0.02 is --- --- 0.00 0.00 3.33 --- --- --- 3.351 2.20 9,415 814.20 8.09 is 0.02 is --- --- 3.28 0.00 4.38 --- --- --- 7.676 2.40 10,712 814.40 11.83 is 0.01 is --- --- 8.50 s 0.00 3.32 s --- --- --- 11.83 2.60 12,008 814.60 12.36 is 0.00 is --- --- 9.70 s 0.00 2.66 s --- --- --- 12.36 2.80 13,304 814.80 12.71 is 0.00 is --- --- 10.37 s 0.00 2.34 s --- --- --- 12.70 3.00 14,601 815.00 13.01 is 0.00 is --- --- 10.86 s 0.00 2.14 s --- --- --- 13.00 3.20 15,897 815.20 13.29 is 0.00 is --- --- 11.25 s 1.86 2.01 s --- --- --- 15.13 3.40 17,194 815.40 13.55 is 0.00 is --- --- 11.60 s 5.26 1.92 s --- --- --- 18.79 3.60 18,490 815.60 13.81 is 0.00 is --- --- 11.90 s 9.67 1.86 s --- --- --- 23.43 3.80 19,786 815.80 14.07 is 0.00 is --- --- 12.23 s 14.89 1.82 s --- --- --- 28.94 4.00 21,083 816.00 14.31 is 0.00 is --- --- 12.46 s 20.80 1.78 s --- --- --- 35.04 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 2.558 cfs Storm frequency = 1 yrs Time to peak = 12.67 hrs Time interval = 2 min Hyd. volume = 36,954 cuft Drainage area = 52.920 ac Curve number = 57.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 3.00 2.00 1.00 0.00 ' 0 2 4 Hyd No. 13 Area A that bypasses SCMs Hyd. No. 13 -- 1 Year 6 8 10 12 14 16 Q (cfs) 3.00 2.00 1.00 ' 0.00 18 20 22 24 26 Time (hrs) Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 2.718 cfs Storm frequency = 1 yrs Time to peak = 12.67 hrs Time interval = 2 min Hyd. volume = 96,402 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Q (cfs) 3.00 2.00 1.00 Total Area A - Post Dev Hyd. No. 15 -- 1 Year Q (cfs) 3.00 2.00 1.00 0.00 ' ' 0.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 15 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 9.441 2 748 95,225 ------ ------ ------ Area A - Pre 2 SCS Runoff 0.883 2 720 2,978 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 0.290 2 720 979 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 41.83 2 720 95,747 ------ ------ ------ Area to SCM 1 8 Reservoir 1.363 2 902 83,192 7 828.00 59,215 Route SCM 1 10 SCS Runoff 4.272 2 718 8,543 ------ ------ ------ Area to SCM 2 11 Reservoir 0.215 2 800 7,314 10 813.13 4,602 Route SCM 2 13 SCS Runoff 7.646 2 746 73,447 ------ ------ ------ Area A that bypasses SCMs 15 Combine 8.436 2 750 163,952 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 2 Year Tuesday, 06 / 2 / 2020 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 9.441 cfs Storm frequency = 2 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 95,225 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 10.00 . 11 4.00 2.00 0.00 ' ' 0 2 4 Hyd No. 1 6 8 Area A - Pre Hyd. No. 1 -- 2 Year Q (cfs) 10.00 . 11 4.00 2.00 .� 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 2.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 1.00 0.90 0.80 0.70 0.50 0.40 0.30 0.20 0.10 0.00 0 2 4 Hyd No. 2 Area B - Pre & Post Hyd. No. 2 -- 2 Year Tuesday, 06 / 2 / 2020 = 0.883 cfs = 12.00 hrs = 2,978 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.39 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 2 4 Hyd No. 3 Area C - Pre & Post Hyd. No. 3 -- 2 Year Tuesday, 06 / 2 / 2020 = 0.290 cfs = 12.00 hrs = 979 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 41.83 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 95,747 cuft Drainage area = 18.650 ac Curve number = 78* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(10.030 x 61) + (8.620 x 98)] / 18.650 Q (cfs) 50.00 40.00 O e 1l 20.00 10.00 0.00 0 2 4 Hyd No. 7 6 8 Area to SCM 1 Hyd. No. 7 -- 2 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 1� ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used Q (cfs) 50.00 20.00 10.00 0.00 -' 0 Route SCM 1 Hyd. No. 8 -- 2 Year 10 20 30 40 Hyd No. 8 — Hyd No. 7 Tuesday, 06 / 2 / 2020 = 1.363 cfs = 15.03 hrs = 83,192 cuft = 828.00 ft = 59,215 cuft 50 60 70 80 90 III Total storage used = 59,215 cuft Q (cfs) 50.00 40.00 20.00 10.00 1 0.00 100 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 4.272 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 8,543 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 10 6 8 Area to SCM 2 Hyd. No. 10 -- 2 Year Q (cfs) 5.00 4.00 IM11111 2.00 1.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation Reservoir name = SCM 2 Max. Storage Storage Indication method used Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 -' 0 Route SCM 2 Hyd. No. 11 -- 2 Year 10 20 30 40 Hyd No. 11 — Hyd No. 10 Tuesday, 06 / 2 / 2020 = 0.215 cfs = 13.33 hrs = 7,314 cuft = 813.13 ft = 4,602 cuft 50 60 70 80 90 III Total storage used = 4,602 cuft Q (cfs) 5.00 4.00 3.00 2.00 1.00 1 0.00 100 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 7.646 cfs Storm frequency = 2 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 73,447 cuft Drainage area = 52.920 ac Curve number = 57.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 8.00 4.00 2.00 0.00 ' 0 2 4 Hyd No. 13 Area A that bypasses SCMs Hyd. No. 13 -- 2 Year 6 8 10 12 14 16 Q (cfs) 8.00 4.00 2.00 ' 0.00 18 20 22 24 26 Time (hrs) Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 8.436 cfs Storm frequency = 2 yrs Time to peak = 12.50 hrs Time interval = 2 min Hyd. volume = 163,952 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Q (cfs) 10.00 : M .M 4.00 2.00 Total Area A - Post Dev Hyd. No. 15 -- 2 Year Q (cfs) 10.00 IIIIMI 4.00 2.00 0.00 0.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 25 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 43.34 2 742 282,010 ------ ------ ------ Area A - Pre 2 SCS Runoff 4.334 2 718 9,293 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 1.424 2 718 3,054 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 79.43 2 718 181,858 ------ ------ ------ Area to SCM 1 8 Reservoir 5.545 2 768 168,728 7 828.86 98,653 Route SCM 1 10 SCS Runoff 8.379 2 716 16,918 ------ ------ ------ Area to SCM 2 11 Reservoir 2.302 2 724 15,677 10 813.78 7,209 Route SCM 2 13 SCS Runoff 33.24 2 742 212,341 ------ ------ ------ Area A that bypasses SCMs 15 Combine 39.94 2 742 396,746 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 10 Year Tuesday, 06 / 2 / 2020 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 43.34 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 282,010 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 50.00 40.00 O e 1l 20.00 10.00 0.00 0 2 4 Hyd No. 1 6 8 Area A - Pre Hyd. No. 1 -- 10 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 .� 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 4.334 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 9,293 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 2 6 8 Area B - Pre & Post Hyd. No. 2 -- 10 Year Q (cfs) 5.00 4.00 IM11111 2.00 1.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.97 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 0.00 0 2 4 Hyd No. 3 Area C - Pre & Post Hyd. No. 3 -- 10 Year Tuesday, 06 / 2 / 2020 = 1.424 cfs = 11.97 hrs = 3,054 cuft = 55 = 0 ft = 5.00 min = Type II = 484 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 1 0.00 26 Time (hrs) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 79.43 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 181,858 cuft Drainage area = 18.650 ac Curve number = 78* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(10.030 x 61) + (8.620 x 98)] / 18.650 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Area to SCM 1 Hyd. No. 7 -- 10 Year IiE Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Time (hrs) Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used 0 10 Hyd No. 8 Route SCM 1 Hyd. No. 8 -- 10 Year 20 30 40 Hyd No. 7 Tuesday, 06 / 2 / 2020 = 5.545 cfs = 12.80 hrs = 168,728 cuft = 828.86 ft = 98,653 cuft 50 60 70 80 90 TTTTMI Total storage used = 98,653 cuft 100 Time (hrs) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 8.379 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 16,918 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 10.00 . 11 4.00 2.00 0.00 ' 0 2 4 Hyd No. 10 6 8 Area to SCM 2 Hyd. No. 10 -- 10 Year Q (cfs) 10.00 . 11 4.00 2.00 y� ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 32 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation Reservoir name = SCM 2 Max. Storage Storage Indication method used. Route SCM 2 Tuesday, 06 / 2 / 2020 = 2.302 cfs = 12.07 hrs = 15,677 cuft = 813.78 ft = 7,209 cuft Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 L0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 11 Hyd No. 10 I_I_I_I_I_I_1 Total storage used = 7,209 cuft 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 33.24 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 212,341 cuft Drainage area = 52.920 ac Curve number = 57.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 0.00 0 2 4 Hyd No. 13 Area A that bypasses SCMs Hyd. No. 13 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 11 L L L L L I� '- 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 34 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 39.94 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 396,746 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Q (cfs) 40.00 30.00 20.00 10.00 0.00 ' 0 4 Hyd No. 15 Total Area A - Post Dev Hyd. No. 15 -- 10 Year 8 12 Hyd No. 8 16 20 Hyd No. 11 24 28 Hyd No. 13 Q (cfs) 40.00 30.00 20.00 10.00 =it- 0.00 32 Time (hrs) 35 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 71.95 2 740 425,708 ------ ------ ------ Area A - Pre 2 SCS Runoff 6.951 2 718 14,232 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 2.284 2 718 4,677 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 103.53 2 718 238,109 ------ ------ ------ Area to SCM 1 8 Reservoir 10.15 2 750 224,778 7 829.47 126,333 Route SCM 1 10 SCS Runoff 11.10 2 716 22,481 ------ ------ ------ Area to SCM 2 11 Reservoir 5.806 2 722 21,237 10 814.12 8,855 Route SCM 2 13 SCS Runoff 54.48 2 740 318,383 ------ ------ ------ Area A that bypasses SCMs 15 Combine 66.51 2 740 564,399 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 25 Year Tuesday, 06 / 2 / 2020 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 71.95 cfs Storm frequency = 25 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 425,708 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Area A - Pre Hyd. No. 1 -- 25 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 '1 1 1 1 ' ' ' ' ' ' n, -1 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 6.951 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 14,232 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 .M 5.00 i 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 2 Area B - Pre & Post Hyd. No. 2 -- 25 Year Q (cfs) 7.00 M 5.00 4.00 3.00 2.00 MR1111 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 38 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.93 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 3 Area C - Pre & Post Hyd. No. 3 -- 25 Year 6 8 10 12 14 16 Tuesday, 06 / 2 / 2020 = 2.284 cfs = 11.97 hrs = 4,677 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 3.00 2.00 1.00 0.00 18 20 22 24 26 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 103.53 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 238,109 cuft Drainage area = 18.650 ac Curve number = 78* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(10.030 x 61) + (8.620 x 98)] / 18.650 Q (cfs) 120.00 100.00 20.00 0.00 0 2 4 Hyd No. 7 6 8 Area to SCM 1 Hyd. No. 7 -- 25 Year Q (cfs) 120.00 100.00 40.00 20.00 'q-- ' ' ' - ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 40 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used. Q (cfs) 120.00 100.00 20.00 Route SCM 1 Hyd. No. 8 -- 25 Year Tuesday, 06 / 2 / 2020 = 10.15 cfs = 12.50 hrs = 224,778 cuft = 829.47 ft = 126.333 cuft Q (cfs) 120.00 100.00 40.00 20.00 0.00 — ' 0.00 0 8 16 24 32 40 48 56 64 72 80 88 Time (hrs) Hyd No. 8 Hyd No. 7 I_I_I_I_I_I_1 Total storage used = 126,333 CA 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 11.10 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 22,481 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' ' 0 2 4 Hyd No. 10 Area to SCM 2 Hyd. No. 10 -- 25 Year 6 8 10 12 14 16 Q (cfs) 12.00 10.00 4.00 2.00 0.00 18 20 22 24 Time (hrs) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation Reservoir name = SCM 2 Max. Storage Storage Indication method used. Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' ' 0 2 4 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 25 Year Tuesday, 06 / 2 / 2020 = 5.806 cfs = 12.03 hrs = 21,237 cuft = 814.12 ft = 8,855 cuft Q (cfs) 12.00 10.00 4.00 2.00 ' — '' ' ' 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 10 I_I_I_I_I_I_1 Total storage used = 8,855 cuft 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 54.48 cfs Storm frequency = 25 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 318,383 cuft Drainage area = 52.920 ac Curve number = 57.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 Hyd No. 13 6 8 Area A that bypasses SCMs Hyd. No. 13 -- 25 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 i J I I I I I I I ` 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 66.51 cfs Storm frequency = 25 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 564,399 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Total Area A - Post Dev Q (cfs) Hyd. No. 15 -- 25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 45 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 127.39 2 740 698,793 ------ ------ ------ Area A - Pre 2 SCS Runoff 11.83 2 718 23,703 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 3.887 2 718 7,789 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 144.14 2 718 335,052 ------ ------ ------ Area to SCM 1 8 Reservoir 49.34 2 728 321,492 7 830.18 159,623 Route SCM 1 10 SCS Runoff 15.72 2 716 32,166 ------ ------ ------ Area to SCM 2 11 Reservoir 11.58 2 720 30,916 10 814.39 10,631 Route SCM 2 13 SCS Runoff 95.18 2 740 519,017 ------ ------ ------ Area A that bypasses SCMs 15 Combine 131.12 2 736 871,425 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 100 Year Tuesday, 06 / 2 / 2020 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 127.39 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 698,793 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 Area A - Pre Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 11.83 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 23,703 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 12.00 10.00 4.00 2.00 0.00 ' ' 0 2 4 Hyd No. 2 6 8 Area B - Pre & Post Hyd. No. 2 -- 100 Year Q (cfs) 12.00 10.00 4.00 2.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 48 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.52 in Distribution Storm duration = 24 hrs Shape factor Area C - Pre & Post Tuesday, 06 / 2 / 2020 = 3.887 cfs = 11.97 hrs = 7,789 cuft = 55 = 0 ft = 5.00 min = Type II = 484 Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 3 Time (hrs) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 144.14 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 335,052 cuft Drainage area = 18.650 ac Curve number = 78* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(10.030 x 61) + (8.620 x 98)] / 18.650 Area to SCM 1 Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 7 Time (hrs) Hydrograph Report 50 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation Reservoir name = SCM 1 Max. Storage Storage Indication method used Q (cfs) Tuesday, 06 / 2 / 2020 = 49.34 cfs = 12.13 hrs = 321,492 cuft = 830.18 ft = 159,623 cuft Route SCM 1 Hyd. No. 8 -- 100 Year Q (cfs) mom 0 4 Hyd No. 8 8 12 Hyd No. 7 16 20 24 28 32 Time (hrs) I_I_I_I_I_I_I Total storage used = 159,623 CA 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 15.72 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 32,166 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 Q (cfs) 18.00 15.00 12.00 .M 3.00 0.00 ' 1' 0.0 2.0 4.0 Hyd No. 10 6.0 8.0 Area to SCM 2 Hyd. No. 10 -- 100 Year Q (cfs) 18.00 15.00 12.00 M 3.00 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report 52 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation Reservoir name = SCM 2 Max. Storage Storage Indication method used. Q (cfs) 18.00 15.00 12.00 .M 3.00 0.00 ' ' 0 2 4 Hyd No. 11 Route SCM 2 Hyd. No. 11 -- 100 Year Tuesday, 06 / 2 / 2020 = 11.58 cfs = 12.00 hrs = 30,916 cuft = 814.39 ft = 10,631 cuft Q (cfs) 18.00 15.00 12.00 m 3.00 0.00 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 10 I_I_I_I_I_I_1 Total storage used = 10,631 cuft Time (hrs) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 95.18 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 519,017 cuft Drainage area = 52.920 ac Curve number = 57.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 Q (cfs) 100.00 90.00 80.00 70.00 .1 11 50.00 40.00 30.00 20.00 Q (cfs) 100.00 90.00 80.00 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 n nn 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 54 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 2 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 131.12 cfs Storm frequency = 100 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 871,425 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac Total Area A - Post Dev Q (cfs) Hyd. No. 15 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 Hydraflow Rainfall Report 6V Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 0.0000 0.0000 0.0000 -------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 0.0000 0.0000 0.0000 -------- 25 0.0000 0.0000 0.0000 -------- 50 0.0000 0.0000 0.0000 -------- 100 0.0000 0.0000 0.0000 -------- File name: Sample.idf Intensity = B / (Tc + D)^E Tuesday, 06 / 2 / 2020 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tc = time in minutes. Values may exceed 60. Storm rreci . The name: yam ie. c Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.80 3.39 0.00 3.30 4.97 5.93 6.80 7.52 SCS 6-Hr 1.93 2.34 0.00 3.38 3.41 4.04 4.57 5.07 Huff -1st 0.00 0.00 0.00 2.75 0.00 0.00 6.50 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 2.75 0.00 0.00 6.50 0.00 Custom 0.00 0.00 0.00 2.80 0.00 0.00 6.00 0.00