Loading...
HomeMy WebLinkAboutSW4200501_C07.06_202006020 Z J UI J Lu 0 Lu 0 r 0 U Lu Lu 2 U) O J d 6 U 0 0 0 U) a� 0 0 c 0 O r U 0 0 N w > E 09 Lo E N co r N o� PLANTING PERIOD TYPE PLANTING RATE APRIL 15 - JULY 15** HULLED SUNSTAR OR RIVERA BERMUDA 85 LBS /ACRE* JULY 15-AUG. 15 SUNSTAR OR RIVERA BERMUDA SPRIGS 5 BUSHELS11,000 SF AUG. 15-APRIL 15 TEMPORARY SEEDING APPLIES** * OR AS REQUIRED TO ACHIEVE 95% COVERAGE AS DETERMINED ON A PER SQUARE YARD BASIS PRIOR TO SUBSTANTIAL COMPLETION. "WHEN SEEDING MUST TAKE PLACE OUT -OF -SEASON FOR PERMANENT GRASS, APPROPRIATE TEMPORARY SEEDING SHALL BE DONE AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR PERMANENT SEEDING AS SPECIFIED IN SEASON AT NO ADDITIONAL COST TO THE OWNER. LAWN MAINTENANCE NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR LAWN MAINTENANCE UNTIL FINAL COMPLETION. 2. LAWN MUST BE AT 95% COVERAGE AT SUBSTANTIAL COMPLETION REVIEW TO BE ACCEPTED. 3. IF NOT AT 95% COVERAGE, SUBSTANTIAL COMPLETION WILL BE DELAYED UNTIL THE FOLLOWING GROWING SEASON. SUBSTANTIAL COMPLETION NOTES (GRASS): CONTRACTOR SHALL BE RESPONSIBLE FOR LAWN MAINTENANE AND WATERING UNTIL SUBSTANTIAL COMPLETION. LAWNITURF SHALL BE CONSIDERED SUBSTANTIALLY COMPLETE WHEN GRASS ESTABLISHMENT IS AT A MIN. 95% COVERAGE AND THE SURFACE COMPLIES WITH THE SLOPE, SMOOTHNESS AND OTHER SPECIFIED TOLERANCES. IF THE MINIMUM REQUIREMENTS ARE NOT MET, SUBSTANTIAL COMPLETION WILL BE DELAYED UNTIL THE MINIMUM REQUIREMENTS ARE MET (POSSIBLY INTO THE FOLLOWING GROWING SEASON). THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR WATERING AND MAINTENANCE OF THE GRASS UNTIL SUBSTANTIAL COMPLETION IS REACHED. SEE SPECIFICATIONS FOR FURTHER INFORMATION. I»:�',T L9a.`j��a��1L`I���':I��I�11� ��:�'I�I�I ����►� PLANTING PERIOD TYPE PLANTING RATE TALL FESCUEAND 70 LBS/ACRE AUGUST 15 -FEBRUARY 1 WINTER RYE (GRAIN) 25 LBS/ACRE TALL FESCUE AND 720LBS/ACRE APRIL 1 -AUGUST 15 GERMAN MILLET (SMALL STEMMED VARIETY)*** 25 LBS/ACRE ***TEMPORARY -RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" HEIGHT BEFORE MOWING. NOTES: PERMANENT OR TEMPORARY GROUND COVER SHALL BE PROVIDED OVER ALL DISTURBED AREAS OF THE SITE AS SOON AS POSSIBLE, HOWEVER, NO LATER THAN 30 DAYS AFTER CONSTRUCTION ACCTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED DURING ANY PHASE OF WORK. TEMPORARY OR PERMANENT GROUND COVER SHALL BE PROVIDED ON ALL SLOPES WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS AFTER CONSTRUCTION ACTIVITIES PERMANENTLY OR TEMPORARILY CEASE. CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ALL SLOPES 3:1 OR STEEPER TO HAVE BIODEGRADABLE EROSION CONTROL MATTING INSTALLED. TEMPORARY SEEDING SCHEDULE PUMP FLOW TO LOCATION /DOWNSTREAM OF UTILITY TRENCH. PLANTING PERIOD TYPE PLANTING RATE 60 LBS PER ACRE OR PER MARCH 1 -DUNE 1 NATIVE STEEP SLOPE MIX WITH ANNUAL RYEGRASS MANUFACTURER'S REQUIREMENTS FOR 90% COVERAGE MIX COMPOSITION (BASED ON ERNMX-181) 31.9% SORGHASTRUM NUTANS NY4 ECOTYPE (INDIANGRASS, NY4 ECOTYPE) 20.0% LOLIUM MULTIFLORUM (ANNUAL RYEGRASS) 70.0% ELYMUS VIRGINICUS, PA ECOTYPE (VIRGINIA WILDRYE, PA ECOTYPE) 9.6 % ANDROPOGON GERARDII, 'NIAGARA' (BIG BLUESTEM, NIAGARA ) 70% ELYMUS CANADENSIS (CANADA WILDRYE) 5.07. AGROSTIS PERENNANS, ALBANY PINE BUSH -NY ECOTYPE (AUTUMN BENTGRASS, ALBANY PINE BUSH -NY ECOTYPE) 4.07. PANICUM WRGATUM, NJ ECOTYPE (SWITCHGRASS, NJ ECOTYPE) 3.0% PANICUM CLANDESTINUM, 'TIOGA' (DEERTONGUE, TOGA) 2.0% SCHIZACHYRIUM SCOPARIUM, 'CAMPER' (LITTLE BLUESTEM, 'CAMPER) 1.37. CHAMAECRISTA FASCICULATA, PA ECOTYPE (PARTRIDGE PEA, PA ECOTYPE) 1.2% ECHINACEA PURPUREA (PURPLE CONEFLOWER) ALL SLOPES 3:1 OR STEEPER TO HAVE 1.27. TRIDENS FLAWS (PURPLETOP) BIODEGRADABLE EROSION CONTROL 1.07. COREOPSIS LANCEOLATA (LANCELEAF COREOPSIS) MATTING INSTALLED. 1.0% RUDBECKIA HIRTA, COASTAL PLAIN NC ECOTYPE (BLACKEYED SUSAN, COASTAL PLAIN NC ECOTYPE) 0.7% HELIOPSIS HELIANTHOIDES, PA ECOTYPE (OXEYE SUNFLOWER, PA ECOTYPE) 0.2% MONARDA FISTULOSA, FORT INDIANTOWN GAP -PA ECOTYPE (WILD BERGAMOT, FORT INDIANTOWN GAP -PA ECOTYPE) 0.1% ASTER LAEWS, NY ECOTYPE (SMOOTH BLUE ASTER, NY ECOTYPE) 0.1% ASTER NOVAE-ANGLIAE, PA ECOTYPE (NEW ENGLAND ASTER, PA ECOTYPE) 0.1% GEUM CANADENSE, PA ECOTYPE (WHITE AVENS, PA ECOTYPE) 0.1% LIATRIS SPICATA, PA ECOTYPE (MARSH (DENSE) BLAZING STAR (SPIKED GAYFEATHER), PA ECOTYPE) 0.1% PENSTEMON DIGITALIS, PA ECOTYPE (TALL WHITE BEARDTONGUE, PA ECOTYPE) 0.1% PYCNANTHEMUM TENUIFOLIUM (NARROWLEAF MOUNTAINMINT) O.M. SOLIDAGO JUNCEA, PA ECOTYPE (EARLY GOLDENROD, PA ECOTYPE) SOURCE: ERNST SEED CO. (1-800-873-3321) OR APPROVED EQUAL JUNE 1- FEBRUARY 28 SEE TEMPORARY SEEDING SCHEDULE SEEDING AND MAINTENANCE NOTES: 1. PRIOR TO SEEDING, A LICENSED SPRAY TECHNICIAN SHALL APPLY AN APPROVED HERBICIDE. 2. FOR AREAS WITH A SLOPE GREATER THAN 3:1, FINAL TRACKING SHALL BE PERPENDICULAR TO THE SLOPE AS THE TRACKS WILL HELP REDUCE EROSION, RETAIN SEED, AND RETAIN MOISTURE. 3. FOR THE FIRST GROWING SEASON, WHENEVER THE VEGETATION REACHES A HEIGHT OF 18"-24", USE A BRUSH HOG MOWER OR STRING TRIMMER TO TRIM THE MEADOW TO A HEIGHT OF 8". PLEASE NOTE THAT A MOWER IS NOT RECOMMENDED AS THE MOWER HEIGHT WILL BE TOO LOW AND THE NATIVE GRASSES WILL BE KILLED. 4. FOR THE SECOND GROWING SEASON, TRIM ANY MATERIAL STANDING FROM THE PREVIOUS YEAR CLOSE TO THE GROUND WHILE IT IS DORMANT. THIS WILL ALLOW THE SOIL TO WARM MORE QUICKLY WHICH WILL STIMULATE THE EMERGENCE OF NEW GROWTH. 5. DO NOT TRIM THE MEADOW AT A HEIGHT OF LESS THAN 8" AS THIS WILL KILL THE NATIVE GRASSES. PERMANENT SEEDING SCHEDULE- NATURALIZED SEED 'NO -MOW' MIX TO BE APPLIED TO ALL PLANTING BEDS MULCH BED DETAIL N.T S. t1. LOCATE ALL EXISTING UTILITIES PRIOR TO INSTALLATION OF PLANT MATERIAL. NOTIFY LANDSCAPE TOP OF BANK ARCHITECT OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THOSE SHOWN ON THE PLAN. 2. VERIFICATION OF TOTAL QUANTITIES AS SHOWN ON THE PLANT LIST SHALL BE THE RESPONSIBILITY ❑ ❑ OF THE CONTRACTOR, AND THE TOTAL QUANTITIES SHALL BE AS SHOWN ON THE PLAN. ❑ ❑ ❑ ❑ 3. CONTACT THE LANDSCAPE ARCHITECT FOR INSPECTION 48 HOURS IN ADVANCE OF THE ❑ ❑ ❑ ❑ SCHEDULED SITE VISIT AND AT THE FOLLOWING INTERVALS: ❑ ❑ ❑ ❑ ❑ ❑ - REVIEW OF GRADING PRIOR TO PLANT AND LAWN INSTALLATION ❑ ❑ ❑ ❑ ❑ ❑ - REVIEW OF PLANT MATERIAL PRIOR TO INSTALLATION. FLOW 0 [I ❑ ❑ ❑ ❑ BOTTOM OF CHANNEL - ONE SUBSTANTIAL COMPLETION MEETING FOR PLANT INSTALLATION. ❑ ❑ ❑ El El E]- ONE FINAL INSPECTION FOR ALL SEEDING/PLANTING OPERATIONS. ❑ ❑ ❑ D 4. ALL PLANT MATERIAL SHALL CONFORM WITH THE STANDARDS SET FORTH BY THE AMERICAN El ElASSOCIATION OF NURSERYMEN AND THE WRITTEN SPECIFICATIONS. El 5. ESTABLISH POSITIVE DRAINAGE IN ALL PLANTING BEDS AND AWAY FROM BUILDING. Ll ❑ 6. APPLY PRE -EMERGENT HERBICIDE TO ALL NEW PLANTING BEDS AT MANUFACTURER'S TOP OF BANK RECOMMENDED RATE PRIOR TO INSTALLATION OF PLANT MATERIAL. TEMP. COFFER DAM UTILITY TRENCH 7 DO NOT INSTALL PLANT MATERIAL IN IMPERVIOUS SOILS i.e. HOLES WHICH WHEN FILLED WITH ( /j WATER, DO NOT COMPLETELY DRAIN WITHIN TWO HOURS). & LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING ALL PLANTS AND LAWN AREAS TEMP. TIMBER AT HIS COST FROM HIS OWN WATER SOURCE INCLUDING DURING PERIODS OF DROUGHT UNTIL MAT FINAL COMPLETION. ANY WATERING OR MAINTENANCE REQUIRED AFTER FINAL COMPLETION SHALL BE AT OWNER'S COST. PLAN 9. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL EQUIPMENT & SUBCONTRACTORS AWAY FROM SEEDED AREAS. IF DAMAGE OCCURS, THROUGH NO FAULT OF THE OWNER, AREAS TEMP. COFFER DAM 2' SHALL BE REGRADED AND RESEEDED IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER. TOP OF BANK CONTRACTOR SHALL WATER AND MAINTAIN THOSE AREAS UNTIL THEY ARE AT 959 COVERAGE AT o SUBSTANTIAL COMPLETION. 00 1 2' MIN. o __o_ la SUBSTITUTIONS OF PLANT MATERIAL SHALL ONLY BE ACCEPTED 60 DAYS PRIOR TO COMMENCEMENT FLOW SAND BAGS OF PLANTING OPERATIONS. SUBSTITUTION REQUESTS MUST BE IN WRITING AND WILL ONLY BE o 0000o BOTTOM OF CHANNEL ACCEPTED FOR LACK OF AVAILABILITY REASONS WHICH CAN BE SUBSTANTIATED OR FOR SUPERIOR 6' STOCK SUBSTITUTIONS. SEEDING TEMP. TIMBER 11. GENERAL LAWN AREAS SHALL BE SEEDED WITH SUNSTAR/RIVIERA BERMUDAGRASS OR APPROVED EQUAL. MAT 12. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT TO REVIEW GRADING ONE WEEK UTILITY TRENCH PRIOR TO SEEDING, IF THE LANDSCAPE CONTRACTOR AND LANDSCAPE ARCHITECT FIND GRADING UNACCEPTABLE FOR FINAL SEEDING, LANDSCAPE CONTRACTOR SHALL BRING IT TO THE ATTENTION O OF THE GENERAL CONTRACTOR. LANDSCAPE CONTRACTOR SHALL NOT PROCEED WITHOUT APPROVAL BY LANDSCAPE ARCHITECT. SECTION COFFER DAM N.T.S LANDSCAPE NOTES II (JS 6"x6' SIDE BOARDS ° o NO GAPS BETWEEN BOARD o 0 a PERSPECTIVE VIEW TEMP. BRIDGEMAT SHALL BE SIZED, DESIGNED AND MONITORED BY A LICENSED ENGINEER HIRED BY THE CONTRACTOR AS NEEDED TO ACCOMMODATE EQUIPMENT REQUIRED FOR PROJECT. 1/4 SUPPORTED ROAD/LOG MAT LOCATED THROUGH EXTENTS OF WETLAND AREA aoinc STREAM SIDE VIEW TEMPORARY TIMBER MAT TIMBER MATING V Q O ANCHOR BRIDGEMAT TO A TREE, OR OTHER PERMANENT OBJECT WITH SUFFICIENT STRENGTH, USING STEEL CHAIN OR CABLE. ROAD/LOG MAT PER CAROLINA MAT INCORPORATED OR SUBMITTED EQUAL WWW.CAROLINAMAT.COM (252) 793-4045 LOCATED ON BOTH SIDES OF APPROACH AND THROUGH EXTENTS OF WETLAND AREAS. 1/4 SUPPORTED ROAD/LOG MAT LOCATED THROUGH EXTENTS OF WETLAND AREA ORIGINAL STREAMBANK N.TS 1. CHISEL ALL CUT GRADED OR COMPACTED AREAS TO A MINIMUM DEPTH OF 8". 2. DISC ALL AREAS TO RECEIVE GRASS TO A MINIMUM OF 8 INCHES, MIX AND AMEND WITH 3 INCHES OF WELL SCREENED TOPSOIL. ON -SITE TOPSOIL MAY BE USED IN PLACE OF IMPORTED TOPSOIL, IF WELL -SCREENED AND DRY PRIOR TO APPLICATION IN ACCORDANCE WITH SPECIFICATION SECTION 329000. J. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND PHOSPHATE UNIFORMLY AS PER SPECIFICATIONS AND MIX WELL WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED TO A 6 INCHES DEPTH. 6. SEED AT RATE SPECIFIED OR AS NEEDED TO ACHIEVE AND MAINTAIN A THICK HEALTHY GROUND COVERAGE. 7 MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. BEGIN THOROUGH WATERING OF GRASSED AREAS IMMEDIATELY UPON INSTALLATION. DO NOT ALLOW GRASSED AREAS TO BECOME EXCESSIVELY DRY. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS AS NEEDED. 9. IF CONFLICTS OCCUR BETWEEN WRITTEN SPECIFICATIONS AND THE DRAWINGS, THE WRITTEN SPECIFICATIONS SHALL PREVAIL. SEEDBED PREPARATION APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY A MINIMUM 3,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND A MINIMUM 500 LB/ACRE 10-10-10 FERTILIZER, AS NEEDED TO ESTABLISH 95% COVERAGE (AS DETERMINED ON A PER SQUARE YARD BASIS) PRIOR TO SUBSTANTIAL COMPLETION. CONTRACTOR TO SUBMIT A COPY OF ALL SOIL REPORTS TO OWNER UPON RECEIPT. LIME & FERTILIZATION SCHEDULE 1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. J. USE EXCELSIOR MATTING OR OTHER APPROVED CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS. 4. APPLY 4000 LB/ACRE(2 TONS LB/AC) GRAIN STRAW OVER SEEDED AREAS AND ANCHOR STRAW CRIMPING WITH HAND OR MECHANICAL CRIMPER 8" MAX. SPACING, ASPHALT TACKING OR OTHER APPROVED METHOD. ASPHALT TACKING SHALL BE 400 GAL/ACRE (9 GAL/1000 SF). 5. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES AND CLOG DRAINAGE DEVICES. SURFACE STABILIZATION REQUIREMENTS DO NOT PRUNE OR CUT LEADER. SEE SPECIFICATIONS SECTION 32 90 00 FOR DETAILS. MULCH IS NOT TO BE - IN CONTACT WITH TRUNK OF TREE ARBORTAPE OR 3/4" - WOVEN BELT SYNTHETIC FABRIC STRAP, GREEN. FLUORESCENT SAFETY FLAGGING 3" MULCH 6" EARTH SAUCER 2" x 2" STAKE 24" MIN. BELOW GRADE REMOVE TOP 2/3 - OF WIRE BASKET WHERE PRESENT. REMOVE FROM PIT ARBORTAPE OR 3/4" WOVEN BELT SYNTHETIC FABRIC STRAP, GREEN. FLUORESCENT \ SAFETY FLAGGING / \ 2„ x 2" STAKE COi EDGE OF HOLE STAKES IN SOLID GROUND ONLY / GUYING PLAN I, ONLY STAKE TREES ON SLOPES 3:1 OR GREATER I OR IN HIGH WIND CONDITIONS. ORIENT TREES AS THEY WERE IN THE FIELD. / WRAP ONLY TREES SUSCEPTIBLE TO SCORCH. START TREE WRAP, IF REQUIRED, AT SECOND BRANCH. TIE SECURELY AT TOP, BOTTOM, AND AT 2' INTERVALS. ROOT BALL x 2 TREE PLANTING DETAIL WETLAND NOTES: 2" x 2" STAKE 48" MIN. ABOVE GRADE TOP OF ROOT BALL AT FINISHED GRADE. REMOVE BURLAP AND TWINE FROM TOP 1/3 OF ROOT BALL. /FINISHED GRADE �1r PREPARED & MULCHED PLANT BED OR PREPARED LAWN AREA SOIL BACKFILL MIXTURE 1 PART GROUND PINE BARK TO 6 PARTS SOIL WITH 8-8-8 FERT.MIXED IN AT 1 LB/100 S.F. MAKE HOLE 1' WIDER ON ALL SIDES THAN ROOT BALL DIAMETER N. T. S. 1. IF NATIVE TOPSOIL ON SITE IS TO BE UTILIZED, A SOIL ANALYSIS SHOULD BE CONDUCTED TO DETERMINE THE VIABILITY OF SOILS FOR HEALTHY VEGETATION GROWTH. IMPORTED OR IN -SITU SOILS MAY BE AMENDED WITH ORGANIC MATERIAL, DEPENDING ON SOIL ANALYSIS TO ENHANCE THE SUITABILITY AS PLANTING MEDIA. CONTRACTOR SHALL SUBMIT RESULTS OF SOIL ANALYSIS TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO CONSTRUCTION. 2. INSTALL AND FINE GRADE TOPSOIL TO FINISH GRADES. IF SOIL AMENDMENTS ARE REQUIRED PER THE SOIL ANALYSIS, THE SOIL IS TO BE AMENDED TO A DEPTH OF 12" PER THE STATE REQUIREMENTS. J. SEE SHEET C0705 FOR FURTHER WETLAND CONSTRUCTION NOTES AND DETAIL. 3" MULCH 4" EARTH SAUCER - FINISHED GRADE TOP OF ROOT BALL AT FINISHED GRADE. REMOVE BURLAP AND TWINE FROM TOP 1/3 OF ROOT BALL, REMOVE CONTAINER. �iMSOIL BACKFILL MIXTURE III-LI NOTE i -_ 1 PART GROUND PINE PLANT PITS ONLY FOR III_ III BARK TO 6 PARTS SOIL SINGLE PLANTS. FOR II ILII-I Ly`L-� ; WITH 8-8-8 FERT.MIXED OTHER PLANTING PREPARE L-LI-II II -II II -II II IN AT 1 LB/100 S.F. THE ENTIRE BED AREA MAKE HOLE 12" WIDER ON BALL + 24" ALL SIDES THAN ROOT BALL DIAMETER TYPICAL SHRUB PLANTING DETAIL N.T.S. 5 3" MULCH FINISH GRADE Co I _ II II BACKFILL MIXTURE : 1 PART SCREENED PINE BARK TO 2 PARTS SOIL WITH 8-8-8 FERT. MIXED IN AT 1 LB./100 S.F. GROUND COVER PLANTING DETAIL N.T.S WETLAND CALCULATIONS SHALLOW LAND PLANT LIST - SCM 2' TOP 3' VEGETATED SHELF KEY PLANT SCHEDULE QTY. REMARKS ASCLEPIAS INCARNATA - SWAMP MLKWEED 76 4" CUBIC CONTAINTERS (QT) HELIANTHUS ANGUS71FOLIUS - SWAMP SUNFLOWER 76 2' O.C. LOBELIA CARDINALIS - CARDINAL FLOWER 76 LANDSCAPE ARCHITECT TO IRIS WRGINICA - BLUE FLAG IRIS 78 APPROVE LOCATIONS IN THE FIELD CAREX STRICTA - TUSSOCK SEDGE 78 PRIOR TO INSTALLATION 1,536 SF REQUIRED: 384 PLANTS (50 HERBACEOUS PLANTS/20OSF) 384 TOTAL PLANTS PROVIDED SHALLOW WATER PLANT LIST - SCM '2' BOTTOM 3' VEGETATED SHELF KEY PLANT SCHEDULE QTY. REMARKS ` F' ` i' `:=. ACORUS AMERICANUS -SWEET FLAG 91 4° CUBIC CONTAIWERS (QT) JUNCUS EFFUSUS - SOFT RUSH 91 2' O.C. -` c ' " • -` �, ' " -`: PELTANDRA WRGINIANA - ARROW ARUM 91 LANDSCAPE ARCHITECT TO PONTEDERIA CORDATA - PICKEREL WEED 91 APPROVE LOCATIONS IN THE FIELD SAURURUS CERNUUS - LIZARD'S TAIL 93 PRIOR TO INSTALLATION 1,826 SF REQUIRED. 457 PLANTS (50 HERBACEOUS PLANTS/2007) 457 TOTAL PLANTS PROVIDED DEEP POOL PLANT LIST - SCM 2' KEY PLANT SCHEDULE QTY. REMARKS NELUMBO LUTEA - AMERICAN LOTUS 31 4" CUBIC CONTAIWERS (QT) NUPHAR LUTEA POLYSEPALA - SPATTERDOCK 31 2' O.C. ........... NYMPHAEA ODORATA - FRAGRANT WATER LILY 32 LANDSCAPE ARCHITECT TO APPROVE LOCATIONS IN THE FIELD PRIOR TO INSTALLATION 373 SF REQUIRED: 94 PLANTS (50 HERBACEOUS PLANTS/20OSF) 94 TOTAL PLANTS PROVIDED LAND / NO MOW / SH WATER i / / \ P ° P 0 MO / \ / / / O ,/_0-- O ° �� D ° ° ° �� D ° _ ° , ° ° �' ° /'O \ DEEP POOL. / X ° /,/-�� 0 a ea a ° °�� e °Q ° ea a ° °� ; ea a ° °� ° at NO PL NTS TO I / P 0 E TED WI HIN 3' /° . \ ,o ° °\ ° p��° e/� D��° ° p�� °/'° �' \ THE OUTLET / ° \P °fir II - �I - ° j/P 6 I O O\ P \ \ a a ° elf / /O a ° ° 10 �� o � o\ �✓ ° o D. a o ° 1 I I ` D \ // -p I 0 I \/ 0 - P O P a II 10 D ° O 0 0 / 0 P 0 ° 0 .r \e o o /ram/ _0 o 0 o-o //-- NO MO / _z __1 / / WETLAND PLANTING SCALE: 1"=10' Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Seal: ISSUE LOG Distribution Civil/Structural/MEP CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 �p*��If111isJJ�J �.•',�N CARO' �•'. �'.<) sv I_�-f0► Date No. REVIEW COMMENTS 11/8/19 1 NCDEQ COMMENTS 1/30/20 NCDEQ COMMENTS 3/18/20 Q 5th NCDEQ REVIEW 5/28/20 6th NCDEQ REVIEW 6/02/20 Q Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Drawing Title: SITE DETAILS Bid Documents Issue Date NOVEMBER 8, 2019 Project Number: Drawn by: 2017-8 RP/KL Drawing Number 07006