Loading...
HomeMy WebLinkAboutNCG500627_Map_20200603 Gat a o a a Stor�a 9e Concrete Block ° Approximate Scale a I Concre e�I ck 60.00' a noun ous S ra Sh B filer Waste Oil Tank KII a IT , Q d� a re use to P nt Air Compressor 0 Hydraulic Oil o Wa ous Tank �/ Ce ifzn In O a / Ral dT k LEGEND General Direction of -; Storm Water Flow / Gate I Fence/Property I� Storage Line ° Approximate Catch WWW Basin.Location ° a a i uil fng a. Concrete Paved Area 4 4 ° oa rrdaaddcres ter rudeff fromareceem steer 4 properly Storm water Borers Into CEMa storm sewer system. ° nc[ete Block a torage U IE oncrete Block - Storage ° ° a T aW araw eales�-e rotten ark ° Filter 4 oSpillwa ° o Crete Block Sedime"erno Storage Basin L1 ° a a d np traw Bales 4 Fife ® tyy\(Oad'(12�Y'c Site Storm water system Asheville Block Plant drains directly to 4ffOMWA 190 Meadow Road Swannanoa River. Asheville, North Carolina Approx. 200 Ft to south Figure 2 une 2011 ovac No 11 Sy .Site Drainage Drawing SCALE AS SHOWN DRAWN BY. KJK SHEET 1 of t LEGEND General Direction of Storm Water Flow / Gate Fence/Property Storage Line Approximate Catch Q p Basin Location �aVIo 4 � iC UII g 4 Concrete Paved Area 4 O S`r1 4 ° a ° a merle Concrete Block Storage °� 4 Depensona receives storm ��I 4 ° .water mff frs.ssovent Approximate Scale ° property Storm weteranterinto I Concree 511 ck el CEMEX storm sewer system. — 60.00' a a ° a ° oncrete Block torage � U P Itoncrete Bloc$ „r.. Storage 4 ° 41 ° S ra Sh ° ndin ou � QUT Lo Dig4 Straw Bales_- mhco /Bpller ank ° Filter 'n W Waste Oi / Q oSPillwa O Tank 4 b Setlimen4Remo 4 FiJ li oncrete Block LI ' Storage Basin Kill s a Is re use to P nt strew bales Filte 4 Nr Compressor i .WI 0 Hydraulic°Oil � ox ° Wa ous Tank Ce el 3 0 ee as �� �pto ,sllroadTrar"' Site Storm water Asheville Block Plant X '.. 17OVrr drains directly to y W '19—Meadow Road Swannanoa River. Asheville, North Carolina Approx. 200 Ft to southI, Figure 2 June zo„ "" " 2 �er Site Drainage Drawing SCALE: AS SHOWN DRAWN BY. KJN I SHEET 1 of 1