Loading...
HomeMy WebLinkAbout20061854 Ver 2_401 Application_201001100 t9 -1%S4 v a• OF warF9 as pG Office Use Only: r Corps action ID no. o < DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (MN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Ef Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number. 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express [Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ,_,,/ ? Yes IJ No For the record only for Corps Permit [I Yes ENo 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes El"No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes E](No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes 0'No 2. Project Information 2a. Name of project (, / n/E U2 EE K- G is r -V 2b. County: 04 CWA Re- 2c. Nearest municipality /town: M 1 [_ t?S 2 J ?J'=-A- JAN I ' 2d. Subdivision name: 16 14 vl S 7A- 2e. NCDOT orgy, T.I.P. or state project no: MTLANDSAPIOSTOR^,NYATEIR OR ARC. 3. Owner Information 3a. Name(s) on Recorded Deed: H H V ISM 4fF-- 0L0NiE/ r G/ t r-Ao j 3b. Deed Book and Page No. ZZ Q(o , g?S'?j 3c. Responsible Party (for LLC if applicable): ?ST B2if 3d. Street address: P. 0. zox 8 3e. City, state, zip: A 12 A /()6-0701-- 3f. Telephone no.: 3g. Fax no.. 02-D - 3 0 TX 3h. Email address: $$ E P$ M l4 TT. Page 1 of 10 PCN Form - n v? ?( i1L JAN -72010 ' 4 Jan jary 2009 WATER OUALiTY SGCTiON ASHEVI[ . p i } ?ICY4JW.k:kµy%y„ "1y.ital .•... ta.-nar y.....Ym... u... ,...gyp' 4. Applicant Information (if different from owner) 4a. Applicant is: ? agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 41'. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 94,3 3, O 3 -3o - Gg9,5- 1b. Site coordinates (in decimal degrees): Latitude: ,,? Al Longitude: 6V7,5-1 37 W 1c. Property size: acres .4 2. Surface Waters 2a. Name of nearest body of water to proposed project FriiF foGov t Kom nivi2. 2b. Water Quality Classification of nearest receiving water: -LS 2c. River basin: ?k- troA1] 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: L4kp io uT? -- CpM M or/ J4?n>?E gH-U. ./ ?'tf S I +? ? A-t- (+b Wt&S . G (Tt oru --• AHA0- c)#sn-tT*A-`y 2.,5' U -- FS*T oC-- L-fruAF--C_?«#<- T3#b-JK- 1+A-J ?Ino . 3b. List the total estimated acreage of all existing wetlands on the property: 184IIS 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1300 3d. Explain the purpose of the proposed project Ar-F.s T- B-L-s V - smIP-AM 9 0V? -W P46-JEn)T FUG r6i:--+L-- E?A0S1 iO AJ• 3e. Describe the overall project in detail, including the type of equipment to be used: T NsTkt, -fffA#-%C- M *--r +V6 cAAC,*- n%ok-:& (Loo-- *v sroB iuzF_- 3r.A)k . 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all for phases) in the past? El"Yes ? No ? Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): MVk4 8Av..O T-y OuJQ Agency/Consultant Company: Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? [Yes ? No ? Unknown 5b. If yes, explain in detail according to 'help fille* instructions. m i w t &J B Uf ?- " v !I t 7?+4"?0? 6. Future Project Plans 6a. Is this a phased project? ? Yes No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were com eted below for your project (check all that apply): ? Wetlands Streams - tributaries Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then compete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - T Choose one IL ID PJ UNA-- CA- - -a ref + So S2 - Choose one ru P -/l _ S3 - Choose one S4 - Choose one - S5 - Choose one _ S6 - Choose one - 3h. Total stream and tribu tary impacts SO 3i. Comments: Page 4 of 10 PCN Form - Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ? Neuse [] Tar-Pamlico 0 Catawba [3Randeman ? Other. 6b_ Buffer Impact number- Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet 6g. Zone 2 impact (square feet 81 - T (?I r1te es/ o .ZOQ B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: -LOO 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically- describe measures taken to avoid or minimize the proposed impacts in designing project. / r 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. f0- 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes g No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: A/ h?E 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete N Maki a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linearfeet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWO 6a. Will the project result in an impact within a protected riparian buffer that requires ?es ? No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 ? AEA0S O' J 200 3 (2 for Catawba) 600 Zone 2 1.5 6f. Total buffer mitigation required: 600 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 2t O AN As.) $ v ffkIl_ .Da- V c-.o"l-c art A-SS?s'. W (f* 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes R No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No 2 Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Nn n'lfEyLtJJ 0/Jl S `? /h/ /4?1f 4G /&X47 , . 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? A114 11 Phase 11 ? NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed Other. 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review []Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ?ORW (check all that apply): []Session Law 2006-246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been [] Yes ? No attached. 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes [] No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Page 8 of 10 PCN Form - Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) I a. Does the project involve an expenditure of public (federalistatellocal) funds or the ? Yes S/No use of public (federaUstate) land? 1b. If you answered yes' to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ?Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? I c. If you answered yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 21-1.0500), Isolated N Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ?Yes &3? o or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ?Yes EJ?No 2c. If you answered 'yes' to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in []Yes o additional development, which could impact nearby downstream water quality? 3b. If you answered yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered'no,' provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A- Page 9 of 10 PCN Form - Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes 0 No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes Eff"No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? (?/NL- «fc 1 S A"J I A?TZ...M I T-VJi- STyIE4fA'-J 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources old you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes 21<0 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? ikc FLOOD- 6-hW AJW ]3c2.v)c-F-- EPrs-r 0-10 "'-? )z?3o/og Applicant/Agent's Printed Name -4op Applicant/Agent's Signature Date (Agent's signature is valid orgy N an authorization letter from the a nt is proykied.) Page 10 of 10 A*W?_A_ HCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary December 16, 2009 Bruce East, Property Services Manager High Vista Estates Homeowners Association, Inc. Post Office Box 98 Arden, North Carolina 28704 Subject: Follow-up to Notice of Violation and Recommendation for Enforcement . Buncombe County Dear Mr. East: The Division of Water Quality (DWQ) has received the Buffer ReEstablishment: Final Report from High Vista Estates Homeowners Association, Inc., related to the Notice of Violation and Recommendation for Enforcement, issued November 8, 2006. DWQ has reviewed the information provided and conducted a follow-up site visit on December 11, 2009. The written response and the buffer restoration results observed at the site have satisfactorily resolved the violations noted in the subject Notice of Violation and Recommendation for Enforcement. Should you have any questions regarding these matters, please contact me at (828) 296-4657. Sincer Kevin Barnett, Environmental Specialist Surface Water Protection Section Asheville Regional Office cc: ARO File Copy DWQ Central Files USACE Asheville Office SURFACE WATER PROTECTION SECTION - ASHEVILLE REGIONAL OFFICE One Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 NorthCarolina Phone: 828-29645001 FAX: 828-299-70431 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity i Affirmative Acti Action Employer ?atifiii J N W E sr. — - : Jurisdictional Streams) :Existing 25' Buffer 0 500 1000 2000 Jurisdictional Wetland(s) :jurisdictional Pond(s) Culvert / Road Crossing Golf Course Property Existing <25' Buffer : State Restoration Project High Vista H.O.A. Stabilization Project High Vista H.O.A Property Scale in Feet 1:750 1 WNR 1 7-19-07 High VistaWedand Map ect Name: High Vista Mcombe and Henderson County, North Carolina High Vista Homeowners Association HV -1000 iWM;t Wetland and Natural Resource Consultants P.O. Box 882 Canton, N.C. 28716 828-648-8801 Scale in Feet 1:750 1 WNR 1 7-19-07 High VistaWedand Map ect Name: High Vista Mcombe and Henderson County, North Carolina High Vista Homeowners Association HV -1000 4 { L sy4 „- , c ? ff 4 L r t M t l - ? ?7 c t ?? ? .c k = C { .S t t ? ? c c l a .rt -p r Q TI • J..-,r+ i any ,x.?' nyy ?` '?°• 1 .t _ '•{. ? ?} ?- 'ate-' I Of pf= h`• > L' ? ?!. ?? / 3.. : -s ? ?-`•?,. ? .-... _ _, ' +• .,t?? ter' `, ,., ? Y { ?tt , ? _ 437 .Q S7 t ? ? i 1 ` V. Ir L V. to L... V. ?1 71 ?171 u, T