Loading...
HomeMy WebLinkAbout20131200 Ver 6_Non-compliance response 6-1-20_20200602CLearWaLer C1earWater Environmental Consultants, Inc. www.ewenv corn June 1, 2020 Mr. Steve Kichefski US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 RE: Response to Corps Comments Tryon International Equestrian Center Polk County, North Carolina Action ID SAW-2013-00262 Dear Mr. Kichefski, Please reference the letter dated May 15, 2020 sent by the US Army Corps of Engineers (Corps) regarding the status of the mitigation compliance for the Tryon International Equestrian Center (TIEC). The mitigation project known as the Harmon Dairy Mitigation to the permit application submitted by C1earWater Environmental Consultants, Inc. (CEC), on behalf of Tryon Equestrian Partners, LLC represented by Mr. Jeff Brown. The Corps requested information on the following six items. 1. Provide an As -built report Clearwater has completed portions of the As -built report; however, CEC has only received survey data from Patton Surveying the last week of May. The As -built report will be submitted by June 30, 2020. 2. Details for completion of any required corrective actions on the site The As -built report will detail remaining corrective actions. This report and necessary corrective actions will be provided by June 30,2020. 3. An explanation for TIEC's permit non-compliance and how non-compliance will be prevented during the remaining phases of the mitigation project. TIEC was limited on all construction, infrastructure, planning costs including the Harmon Dairy Mitigation project for much of 2019-20. On or about May 7, 2020 TIEC secured the necessary funding to complete the mitigation project and continue with development operations at TIEC. This funding includes the necessary means to follow through with the required corrective actions, seven years of mitigation monitoring, invasive species treatment as needed for the successful completion of the project. 32 Clayton Street Asheville, NC 28801 828-698-9800 Tel Mr. Steve KichAki June 1, 2020 Page 2 of 2 4. Updated timeline for the completion of the remaining components of the mitigation plan. Following the submittal of the as -built report, CEC is scheduled to conducted MYl monitoring of the streams in July and vegetation monitoring in August. The MY01 report will be submitted by December 31, 2020. If necessary, a separate report will be submitted that documents any corrective actions that are necessary. 5. Details regarding the project stability to include whether adaptive management is necessary to ensure success. This data is still being assessed and will be included in the As -built report. The As -built report will be submitted by June 30, 2020. 6. A Copy of executed Financial assurance TIEC is working on finalizing their financial assurances for the Harmon Dairy Mitigation Project. TIEC will submit a copy of the executed assurances by June 30, 2020. Please do not hesitate to contact me if you have any questions. Sincerely, rl(� �0/0 R. Clement Riddle., P.W.S. Principal cc: Andrew Moore, NCDWR Sue Homewood, NCDWR