Loading...
HomeMy WebLinkAboutNC0038377_Report_20200327 DUKE Mayo Steam Station 10660 Boston Road ENERGY. Roxboro, NC 27574 March 27, 2020 ELECTRONIC SUBMITTAL Ms. Linda Culpepper, Interim Director North Carolina Division of Water Resources n © Q WIE Address: desocdata@ncdenr.gov Subject: Duke Energy Progress, LLC _ MAR 3 0 2"0 Mayo Steam Station EMC SOC WQ S18-005 DIVISION OF WATER RESOURCES 1st Quarter 2020-Monitoring Data Results DIRECTOR'S OFFICE Dear Ms. Culpepper: In accordance with paragraph 2. e. 3)of the NC Environmental Management Commission Special Order by Consent,EMC SOC WQ S18-005, Duke Energy Progress, LLC is hereby submitting the Crutchfield Branch monitoring results for 1st quarter of 2020. If you have any questions,please contact Ms. Lori Tollie(336) 854-4916. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, Tom Copolo- Manager Mayo Electric Generating Plant Duke Energy Carolinas,LLC-Mayo Steam Station Special Order by Consent-SOC No.S18-005 Monitoring Report for 1st Quarter of 2020 z N H GJ t9 o Ql > VI CU ` E a, `^ N c • v - 7 E u C c 7 7 N 7 -O Ul 7 '} •U Q1 U 'B fp > o2 E 0.n — u p u 'O O' 7 N ro N v' m U O L Z v Z O` I O. SAMPLING Date LL m a` F m v1 u , E o LOCATION Sampled O H V z - - - - Total Total Total Total Total Total Total Total Total Total Total Total - - - - - Total mg/L mg/L SU ug/L ng/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L mg/L mg/L mg/L mg/L mg/L °C umho/cm Instream 2/4/2020 3.1 <5 7.7 <100 **1.83 40 <5 <1 901 <0.1 <1 <1 <0.2 <0.2 <1 <1 0.06 0.35 26 33 209 87.4 12 276 Crutchfield Branch *Annual Monitoring Only **Duplicate was gathered at this location and the respective values averaged Duke Energy Carolinas,LLC-Mayo Steam Station Special Order by Consent-SOC No.518-005 Monitoring Report for 1st Quarter of 2020 z * m v v > ro y u E E E _ E a v v c ° > 2 - o E u c c ° ° a, ° -o a 2 �_ a v, ° u N L7 Ia '� u c N ° � E a = y u y •z E w = v F -o LLiti a)` ra N ° 2 ° t0 \ O 3 — ~ O. U SAMPLING Date 00 a `o u Z L.) ri3c` u ;? aE, o LOCATION Sampled = 1— L., z - Total Total Total Total Total Total Total Total Total Total Total Total - - v - - - Total -mg/L mg/L SU ug/L ng/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L mg/L mg/L mg/L mg/L mg/L °C umho/cm Instream 2/4/2020 3.1 <5 7.7 <100 **1.83 40 <5 <1 901 <0.1 <1 <1 <0.2 <0.2 <1 <1 0.06 0.35 26 33 209 87.4 12 276 Crutchfield Branch *Annual Monitoring Only **Duplicate was gathered at this location and the respective values averaged