Loading...
HomeMy WebLinkAboutP3305v i4l. C. DEPARTMENT OF TRANSPORTATION TRANSMITTAL SLIP DATE 'TO: EitIC'GALAMB - DEM-DIHNR I - r FROM: H.F. VICK - P&E ? NOTE AND FILE ? PER OUR CONVERSATION / ? NOTE AND RETURN TO ME ? PER YOUR REQUEST ? RETURN WITH MORE DETAILS ? FOR YOUR APPROVAL ? NOTE AND SEE ME ABOUT THIS ? FOR YOUR INFORMATION ? PLEASE ANSWER ? FOR YOUR COMMENTS ? PREPARE REPLY FOR MY SIGNATURE ? SIGNATURE ? 'TAKE APPROPRIATE ACTION ? INVESTIGATE AND REPORT COMMENTS: ?' RECEIVED MAR 2.01995 March 14, 1995 ENVIRONMENTAL SCIENCES MEMORANDUM TO: File RRAAi/!{? FROM: Jim Buck, P.E. Project Planning Engineer SUBJECT: Realignment of SR 3014 (Carpenter-Morrisville Road) with SR 1002 (Aviation Parkway) and NC 54 in Morrisville, Wake County, Federal Aid Project No. HSR-3014(1), State Project No. 8.2404201, TIP No. P-3305. A scoping meeting was held on March 10, 1995 at 10:00 a.m. in Room 470.of the Transportation Building. TIP Project P-3305 proposes to realign SR 3014 (Carpenter- Morrisville Road) and SR 1002 (Aviation Parkway) at their intersection with NC 54 in Morrisville. The project includes closing two dangerous highway railroad intersections and constructing a new at-grade intersection with four quadrant gates.,, The project will improve safety and increase the capacity of the road by eliminating a "dog-leg" condition and providing a safe, four legged intersection. The project proposes relocating and reconstructing the roadway to consist of two 11' lanes with a curb and gutter along Oak Street, which has been previously abandoned and removed. East of NC 54, two 12' lanes with 6' graded shoulders will be constructed on SR 1002 (Aviation Parkway). Grade changes to NC 54 will be necessary 400' north and south of the intersection. The new intersection of SR 3014 (Carpenter- Morrisville Road) and SR 1002 (Aviation Parkway) at NC 54 will be signalized. The majority of this project occurs within the boundaries of the Morrisville Historic District. This district is eligible for inclusion in the National Register of Historic Places. The boundaries of the historic district were determined by Ruth Little when she surveyed the area and prepared the National Register nomination. This nomination was approved by the state review board, but registration was opposed by a majority of the property owners, and therefore, the district was never actually registered. The contributing houses within the district were documented in the nomination. Since the project utilizes federal funding, the historic district is afforded the same protection as properties which are listed on the National Register. Consequently, if federal funds are used for the project, NCDOT must comply with Section 4(f) of the Department of Transportation Act of 1966 and section 106 of the National Historic Preservation Act of 1966. The State Historic Preservation Office (SHPO) was concerned about the project's effect on the district. SHPO wants to know what the project will look like after completion. This includes: extent of cuts and fills, landscaping plans, and location and appearance of barricades and railroad gates. This office will send a letter to SHPO summarizing all the documentation on the district and request a meeting with SHPO, Division 5, and FHWA to discuss the effect on the district and to draft a Memorandum of Agreement. The capacity of the proposed realigned intersection was discussed. There were concerns that the intersection would operate at a low level of service. In the TIP, Project Number U-3343 is studying the widening of SR 1002 (Aviation Parkway) to five lanes from the I-40 interchange to west of NC 54. The concern was that in the future there would be a need to widen the proposed two lanes to five lanes. It was determined that the purpose and need of this project was strictly to eliminate two dangerous rail crossings and replace them with one safe crossing. Improving the capacity of the intersection would be beyond the scope of this project. Paul Worley, Rail Division, commented that there could not be a five lane, at-grade crossing of the high speed rail corridor due to NCDOT's rail policy. David Allsbrook, Division Five Engineer, was concerned about the time schedule to complete the project., It was suggested that if the project could be switched from federally funded to state funded, NCDOT would not have to comply with the lengthy federal regulations. David Allsbrook and Frank Vick indicated they would explore the possibility of utilizing state funds. Steve Burris, Geotechnical Unit, reported that there are Underground Storage Tanks (USTs) on the northeast corner of the intersection of NC 54 and Aviation Parkway. The owner of the USTs is in the process of having the tanks removed. The USTs are outside of the right of way and will not be impacted by this project. Aviation Parkway and Carpenter-Morrisville Road are designated state bike routes. -NCDOT's Bicycle Unit intends to re-route the bike route thru this area. The bike route will have to be relocated on other roads due to the proposed realignments failure to meet AASHTO bike route standards. Eric Galamb, DEM-DEHNR, called with his comments prior to the meeting. The project is near an unnamed tributary, known as Crabtree Creek. The stream classification is C, Nutrient Sensitive. If construction goes near the tributary, he requests that NCDOT use their normal soil and erosion control measures. David Foster, DEHNR, called prior to the scoping meeting and stated that he perceived no natural resource problems with the proposed project. JAB/ j ab cc: H. Frank Vick, P.E. Lubin Prevatt, P.E. 2 .a 4AiEo V .61 P „y R @aur?? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT, JK GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 February 7, 1995 R. SAMUEL HUNT III SECRETARY RFC@NED FEB t 1995 ENVIRONt QNTA^uCIENCES MEMORANDUM TO: Mr. Eric Galamb DEM - DEHNR, 6th Floor FROM: H. Franklin Vick, P. E., Manager Planning and Environmental Branch SUBJECT: Review of Scoping Sheets for Realignment of SR 3014 (Carpenter-Morrisville Road) with SR 1002 (Aviation Parkway) and NC 54 in Morrisville, Wake County, Federal-Aid Project No. HSR-3014(1), State Project No. 8.2404201, TIP #P-3305 Attached for your review and comments are the scoping sheets for the subject project (See attached map for project location). The purpose of these sheets and the related review procedure is to have an early "meeting of the minds" as to the scope of work that should be performed and thereby enable us to better implement the project. A scoping meeting for this project is scheduled for Friday, March 10, 1995 at 10:00 A. M. in the Planning and Environmental Branch Conference Room (Room 470). You may provide us with your comments at the meeting or mail them to us prior to that date. Thank you for your assistance in this part of our planning process. If there are any questions about the meeting or the scoping sheets, please call Jim Buck, Project Planning Engineer, at 733-7842. JAB/plr GW 2- 7 -7 Attachment g.n PROJECT SCOPING SHEET Date: February 6. 1995 Revision Date: TIP Number P-3305 Project Number 8.2404201 F.A. Project Number HSR-3014(1) Division 5 County Wake Project Development Stage Programming Planning X_ Design Route(s) Intersection of SR 3014 & SR 1002 at NC 54 in Morrisville Length .469 mile Functional Classification NC 54 - Urban Principal Arterial SR 3014 & SR 1002 - Urban Minor Artierals Purpose of Project: The project closes two dangerous highway railroad crossings on the Raleigh-Charlotte high speed rail corridor. The realigned intersection will improve traffic movement in the area and provide a safe railroad crossing. Description of project (including specific limits) and major elements of work: Realignment of SR 3014 (Carpenter-Morrisville Road) with SR 1002 (Aviation Parkway) at NC 54 in Morrisville. Project begins 1200' west of the intersection of SR 3014 & NC 54 and extends 600' east on SR 1002. Grade changes on NC 54 occur 400' north & 400' south of SR 1002. Type of environmental document to be prepared: Categorical Exclusion and Section 4(f). Environmental Study Schedule: As soon as possible. Will there be special funding participation by municipality, developers, or other? Yes X No If yes, by whom and amount: Up to $200.000 by the Town of Morrisville. How and when will this be paid? To be determined. P-3305 PROJECT SCOPING SHEET Type of Access Control: Full Partial None X Number of: Interchanges Grade Separations Stream Crossings Typical Section: Existing NC 54: 2 - 12' lanes with 4' paved shoulders SR 3014: 2 - 10' lanes with 6' graded shoulders SR 1002: 2 - 11' lanes with 6' graded shoulders Typical section: Proposed NC 54: 2 - 12' lanes with 6' graded shoulders SR 3014: 2 - 11' lanes with curb and gutter SR 1002: 2 - 12' lanes with 6' graded shoulders Traffic Projections: Construction Year (1995) 5,300 vpd % TTST 2 % DUAL 3 Design Year (2015) 11,300 vpd % TTST 2 % DUAL 3 Design Standards Applicable: AASHTO 3R Design speed: 40 miph Current. Cost Estimate: Construction cost . . . . . . . . . . . $ 600,000 (including engineering and contingencies) Right of Way Cost . . . . . . . . . . . . . $ 155 , 300 (including rel., util., and acquisition) Force Account Items . . . . . . . . . . $ Preliminary Engineering . . . . . . . . $ 75,000 TOTAL PLANNING COST ESTIMATE . . . . . . . . $ 830,300 TIP Cost Estimate: Construction . . . . . . . . . . . . . . . . $ 635 , 000 Right of Way . . . . . . . . . . . . . . . . $ TOTAL TIP COST ESTIMATE. . . . . . . . . . . $ 635,000 List any special features, such as railroad.involvement, which could affect cost or schedule of project: (1) The project will close two dangerous highway-railroad crossings, one on SR 3014 (734753J) and one on Ashe Street (734752J). The realigned intersection will have four-quadrant gates to protect traffic from the railroad. The project is in a high speed rail corridor. (2) SR 3014, SR 1002 and the section of NC 54 in between are designated as a bike route. (3) The entire project is located within the Morrisville Historic District. (4) There are underground storage tanks on the northeast corner of the intersection of NC 54 and SR 1002. (5) This is a division design and constuct project. 1) P-3305 PROJECT SLOPING SHEET construction: COST Estimated Costs of Improvements: X Pavement: _X_ surface . . . . . . . . . . . . . . . . . . $ 205 , 200 _X_ Base . . . . . . . . . . . . . . . . . . $ 3 , 000 Milling & Recycling . . . . . . . . . . . . $ 4,000 Turnouts . . . . . . . . . . . . . . . . . $ Shoulders: Paved . . . . . . . . . . . . . . . . . . . $ Earth . . . . . . . . . . . . . . . . . . . $ Earthwork . . . . . . . . . . . . . . . . . . . . . $ 60 , 000 _X- Subsurface Items . . . . . . . . . . . . . . . . . . $ 17 , 500 Subgrade and Stabilization . . . . . . . . . . . . . $ Drainage (List any special items) . . . . . . . . . $ sub-Drainage . . . . . . . . . . . . . . . . . . . . $ Structures: Width x Length Bridge Rehabilitation x $ New Bridge x . . . $ Widen Bridge x $ Remove Bridge X $ X New Culvert: Size Length $ 18,620 Fill Ht. Culvert Extension . . . . . . . . . . . . . $ Retaining Walls: Type Ave. Ht. ft $ Skew Noise Walls . . . . . . . . . . . . . . . . $ X_ Any Other Misc. Structures (RR-Xing) . . . . $ 20,000 X Concrete Curb & Gutter . . . . . . . . . . . . . . . $ 7 , 200 _ X Concrete Sidewalk . . . . . . . . . . . . . . . . . $ 2 , 300 - - Guardrail . . . . . . . . . . . . . . . . . . . . . $ Fencing: W.W. . . . . . . . • • • • • • • • • $ C.L. . . . . . . . . . . . . . . $ Erosion Control . . . . . . . . . . . . . . . . . . $ 10,000 _X_ Landscape . . . . . . . . . . . . . . . . . . . . . $ 61000 Lighting • $ _X_ Traffic Control . . . . . . . . . . . . . . . . . . $ 15 , 000 X_ Signing: _ X New . . . . . . . . . . . . . . . . . . $ 40,000 - - Upgrading . . . . . . . . . . . . . . . . . $ Traffic signals: New . . . . . . . . . . . . . . . . . . . . $ Revised . . . . . . . . . . . . . . . . . . $ _X_ RR Signals: X New . . . . . . . . . . . . . . . . . . . . $ 7 0 0 - - Revised . . . . . . . . . . . . . . . . . . $ With or without Arms . . . . . . . . . . . . $ If 3R: Drainage Safety Enhancement . . . . . . . . $ Roadside Safety Enhancement . . . . . . . . $ Realignment for Safety upgrade . . . . . . . $ Pavement Markings: X Paint . . . . . . . . . . . . . . . . . . . $ 800 X Thermo . . . . . . . . . . . . . . . . . . . $ 4 , 660 Xy Markers . . . . . . . . . . . . . . . . . . . $ 5 , 250 Delineators . . . . . . . . . . . . . . . . $ ., P-3305 PROJECT SCOPING SHEET X Other: _X_ clearing and grubbing. . . . . . . . . . . . $ 20,000 _X_ mobilization & misc . . . . . . . . . . . . . $ 21,341 _X_ other . . . $ 68,829 Contract Cost: $ 600.000 Engineering & Contingencies • . . . . . . . . . . . . $ Preliminary Engineering Costs . . . . . . . . . . . . . $ 75.000 Force Account . . . . . . . . . . . . . . . . . . . . $ CONSTRUCTION Subtotal: $ 675,000 Right of Way: Will Exist Right of Way contain Improvements? Yes _X_ No Existing Right of Way Width: Varies, none to 40' _X_ New Right of Way Needed: Width 40' . . . . . . . $ 155,300 Easements: Type Width . . . . . . . $ Utilities: . . . . . . . . . . . . . . . . . . . . $ RIGHT OF WAY Subtotal: $ 155.300 Total Estimated Project Cost: $ 830.300 Prepared By: James A. Buck Date: February 6, 1995 The above scoping information has been reviewed and approved by: INIT. DATE Highway Design Roadway Structure Design Services Geotechnical Hydraulics Loc. & Surveys Photogrammetry Prel. Est. Engr. Planning & Environ. Right of Way R/W Utilities Traffic Engineering Project Management County Manager City/Municipality Others Others INIT. DATE Board of Tran. Member Board of Tran. Member Mgr. Program & Policy Chief Engineer-Precon Chief Engineer-Oper. secondary Roads Off. Construction Branch Roadside Environmental Maintenance Branch Bridge Maintenance Statewide Planning Division Engineer Bicycle Coordinator Program Development FHWA Dept. of Cult. Res. Dept. of EH & NR Others a P-3305 PROJECT SCOP IN G SHEET Scope sheet for local officials will be sent to Division Engineer for handling. If you are not in agreement with proposed project or scoping, note your proposed revisions in below and initial and date after comments. s NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS PLANNING AND ENVIRONMENTAL BRANCH 0 feet 10,0 feet 200 0 meters -10,5 FIG. 1 REALIGNMENT OF SR 3014 (CARPENTER - MORRISVILLE ROAD) WITH SR 1002 (AVIATION PARKWAY) AND NC 54 IN MORRISVILLE WAKE COUNTY P - 3305