Loading...
HomeMy WebLinkAboutU-2009 (2)6.w STA7F n w,w wy' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR LYNDO TIPPETT SECRETARY August 28, 2007 MEMORANDUM TO FROM: SUBJECT: Ms. Chrys Baggett, Director State Clearinghouse Department of Administration Gregory J. Thorpe, Ph.D., Manager Project Development and Environmental Start of Study for NC 3, Widen to multi-lanes from K4(nnapolis (U-2009) to SR 1691 (Loop Road), 2.5 miles, Cabarrus County, Division 10, WBS 39010.1.1, STP-0003(6), TIP U-3440 The Project Development and Environmental Analysis Branch is starting the project development, environmental and engineering studies for the proposed widening of NC 3 to a multi-lane facility from Kannapolis Parkway (U-2009) to SR 1691 (Loop Road). The project is included in the 2007-2013 North Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year 2011 and construction in fiscal year 2013. Attached for your review and comments are the scoping information sheets for the proposed project. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals that may be required by your agency. A scoping meeting will be scheduled with NCDOT staff to discuss the proposed project in more detail. In order to include your comments in our materials for this meeting, we would appreciate your response by November 2, 2007. If you would like to attend the scoping meeting, please notify the project engineer. It is anticipated that a federally funded Environmental Impact Statement/Finding of No Significant Impact (EA/FONSI) will be prepared for this project. This document will be prepared in accordance with the National Environmental Policy Act. If you have any questions concerning the project, please contact Kristina Solberg, P.E., Project Planning Engineer, of this Branch at (919) 733-7844, Ext. 259. Please include the TIP Project Number in all correspondence and comments. GJT/plr Attachment MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699-1548 TELEPHONE: 919-733-3141 FAX: 919-733-9794 WEBSITE: WWW.NCDOT.ORG LOCATION: TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC omeh s`--m Lm--, / 1 C A B l Hunters Ile . A I P" - n Alhemai I V Y 74 Y arr sburg e./ Charlo tt Mint HI51 ®w 29 1 D ------------? ---- ' ??- ?_J ,- ----- --------------- - o ?,auw \ M? 1® 3 ??5'??? END PROJECT ) 3 C ? . 1 BEGIN a 625 i PROJECT 0 p 'P 29 nnnnnn 0 3,000 6;000 12,000 Feet v N°e nr Cq9 VICINITY MAP County: CABARRUS NORTH CAROLINA DEPARTMENT NC 3 WIDEN TO MULTI LANES OF TRANSPORTATION FROM PROPOSED KANNAPOLIS Div: 10 TIP#U-3- Figure : DIVISION OF HIGHWAYS PARKWAY (U-2009) TO LOOP RD v PROJECT DEVELOPMENT AND VVBS: 39010.1.1 9> ENVIRONMENTAL ANALYSIS BRANCH (SR 1691) CABARRUS COUNTY Date: JUNE 2007 TIP PROJECT U-3440 s a STATF au.. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR LYNDO TIPPETT SECRETARY August 28, 2007 MEMORANDUM TO: FROM: SUBJECT: Ms. Chrys Baggett, Director State Clearinghouse Department of Administration Gregory J. Thorpe, Ph.D., Manager Project Development and Environmental Start of Study for NC 3, Widen to multi-lanes from Wnnapolis (U-2009) to SR 1691 (Loop Road), 2.5 miles, Cabarrus County, Division 10, WBS 39010.1.1, STP-0003(6), TIP U-3440 The Project Development and Environmental Analysis Branch is starting the project development, environmental and engineering studies for the proposed widening of NC 3 to a multi-lane facility from Kannapolis Parkway (U-2009) to SR 1691 (Loop Road). The project is included in the 2007-2013 North Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year 2011 and construction in fiscal year 2013. Attached for your review and comments are the scoping information sheets for the proposed project. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals that may be required by your agency. A scoping meeting will be scheduled with NCDOT staff to discuss the proposed project in more detail. In order to include your comments in our materials for this meeting, we would appreciate your response by November 2, 2007. If you would like to attend the scoping meeting, please notify the project engineer. It is anticipated that a federally funded Environmental Impact Statement/Finding of No Significant Impact (EA/FONSI) will be prepared for this project. This document will be prepared in accordance with the National Environmental Policy Act. If you have any questions concerning the project, please contact K istina Solberg, P.E., Project Planning Engineer, of this Branch at (919) 733-7844, Ext. 259. Please include the TIP Project Number in all correspondence and comments. GJT/plr Attachment MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699-1548 TELEPHONE: 919-733-3141 FAX: 919-733-9794 WEBSITE: WWW.NCDOT.ORG LOCATION: TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC Department of Environment and Natural Resources Office of Legislative and Intergovernmental Affairs Project Review Form Project Number co-1 County Date Received qj, ©7 Date Response Due (firm deadline) lv tL0 This project is being reviewed as indicated below: Regional Office Regional Office Area In-House Review _ Asheville ir _ Soil & Water _ Marine Fisheries Fayetteville V- Water _ Coastal Management ?Mooresville - Aquifer Protection . `(Vildlife _D15-k- Raleigh ? Land Quality Engineer v--forest Resources Washington _ Water Resources ./environmental Health Wilmington ?Parks & Recreation _ Solid Waste Mgmt- Winston-Salem _V_Xxater Quality DT Radiation Protection Air Quality _ Other Manager Sign-Off/Region: Date: In-House Reviewer/Agency: Response (check all applicable) _ No objection to project as proposed SSA ?"?? 8$;" 0J No comment ?<'0 _ Insufficient information to complete review ?Sg?WAI?R p %?H - Other (specify or attach comments) RETURN TO: Melba McGee Environmental Coordinator Office of Legislative & Intergovernmental Affairs ?2