Loading...
HomeMy WebLinkAbout20200518 Ver 1_More Info Received_20200601Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* Version* 1 20200518 Is this project a public transportation project?* r Yes r No Reviewer List:* Anthony Scarbraugh:eads\adscarbraugh1 Select Reviewing Office:* Washington Regional Office - (252) 946-6481 Does this project require a request for payment to be sent?* r Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r New Project w Existing ID r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Albemarle Beach Solar, LLC VUio is subaitting the inforrration? Email Address: jeffrey.mcdermott@sunenergyl.com Project Information Existing ID #: Existing Version: 20200518 1 20170001(no dashes) Project Name: Albemarle Beach Solar Farm Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Washington Please upload all files that need to be submited. Oickthe upload button or drag and drop files here to attach document Impacts Map 05292020.pdf 1.32MB Jurisdictional Impacts Drawings A&A - 05282020.pdf 6.41 MB Jurisdictional Impacts Report A&A - 05282020.pdf 1.63MB Only pdt or Iv17 files are accepted. Describe the attachments: The attached is supplemental information describing the proposed impacts to Jurisdictional Waters. The first attachment shows an overall site view, impact locations, and impacted feet/acreage. The second and third attachments describe the impacts in more detail, from a civil engineering perspective. Sign and Submit P By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: Submittal Date: 5/29/2020 Is filled in autorratically. %%%% % %% % % % %%%% % % %%%%%%% % % %% % % % % %%%%%%%%%%%%Sheet 2 Sheet 3 Sheet 4 Sheet 5 Sheet 6 MackeysFerry R d NCHwy32NNC Hwy32 NNixon Rd S u n s e tAveE Folly Rd M ackeys R dMarine rsDr SaintsDelightRd Wil k i nsDr G riffin R d MartinLuther Rd Harris RdWhiteMarsh RdOldF ollyRdBackwoodsRdOspreyLn M allardDrCross RdDa v is R d Parrish RdLandfi l l RdWilliams Lo opRdAl bemarl eBeachRdWoodlawn R d Path: Y:\805\42196-Albemarle Beach Solar\GIS\WTDM\42196-WTDM - Overall.mxdLegend Project Study Li mits - 1,236.4 A cres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data StationCulverts %DitchIntermittent Stream (R4)Palustrine Emergent (P EM) WetlandsPalustrine Forested (P FO) Wetl andsPalustrine Scrub-Shrub (PS S) WetlandsPalustrine Open Water (P OW )Topographic ContoursMajor - 10 FeetMinor - 1 Foot ³ 0 2,000 4,0001,000 Feet 1. Waters of the U.S. within the project study limits have beenlocated using submeter, Bluetooth GPS antennas by TimmonsGroup.2.Waters of the U.S. have not been confirmed by the U.S. ArmyCorps of Engineers until stamped.3. Project limits are approximate.4. Topography based on USGS LiDAR.5. Cowardin Stream Classifications are based solely on fieldobservations. No formal Stream assessment methodology wascompleted to determine these Cowardin Classifications.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.EnvironmentalJOB NUMBER CHECKED BY SCALE SHEET NO. DATE DESIGNED BY DRAWN BYYOUR VISION ACHIEVED THROUGH OURSSite DevelopmentResidentialInfrastructureDATEREVISION DESCRIPTIONTHIS DRAWING PREPARED AT THE1001 Boulders Parkway, Suite 300 | Richmond, VA 23225TEL 804.200.6500 FAX 804.560.1648 www.timmons.comCORPORATE OFFICETechnologyALBEMARLE BEACH SOLAR ADDENDUMFIGURE 6: WETLANDS AND WATERS OF THE U.S. DELINEATION MAP42196WASHINGTON COUNTY, NORTH CAROLINA12/12/2019 A. MEHFOUD A. MEHFOUD S. THEBERT 1 " = 2,000 ' 1 of 6 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)RPW(lf)A 299 NT / NVB731NT / NVC486NT / NVD430NT / NVE366NT / NVF1,841 NT / NVG295NT / NVH442NT / NVI1,309 NT / NVJ4,350 NT / NVL375NT / NVM365NT / NVN1,269 NT / NVO1,016 NT / NVP6,489 NT / NVQ1,544 NT / NVR2,961 NT / NVS1,928 NT / NVT5,404 NT / NVU3,226 NT / NVV1,291 NT / NVW298,581 8,958 NT / VX69,748 NT / VY119,341 12,664 NT / VZ5,556 NT / VA21,098 NT / VB266,519 NT / VC2744,661 NT / VD242,289 NT / VE21,605,324 604,954 NT / VF2295,162 681 NT / VG21,958 6,240 NT / VH252,468 5,019 NT / VI17,514 NT / VJ246,452 NT / VK2425,064 NT / VL212,794 NT / VN21,969 NT / NVO21,127 NT / NVP2193NT / NVR2421NT / NVS2384NT / NVT2232,252 NT / VU2286NT/NVV242NT/NVW2100NT/NVX23,780,055 13,204 NT/VY211,471 NT/VZ2253NT/VA311,759 NT/VTotal7,294,246 1,064,434 67,314 56,043 0 0 0 40,652 Total Stream Length =40,652 lf * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams; RPW = Relatively Permanent Waters Resource Identification Confirmation ResourceDescriptionNotes* Total Wetland Area =8,482,036 sq ft 194.72 ac Albemarle & Associates, Ltd.115 West St. Clair StreetP.O. Box 3989Kill Devil Hills, NC 27948Phone: (252) 441-2113Fax: (252) 441-0965www.AlbemarleAssociates.comCert. of Licensure No. C-1027This document is the propertyof Albemarle & Associates, Ltd.All rights reserved. Anyunauthorized use or alterationis prohibited.OVERALL MAPSUN ENERGY 1, LLCALBEMARLE BEACH SOLARKnow what's R SEAL 028572NORTH C A RO L IN APRO F E S SIO N A LENGIN E E RMIC HAEL J . M O R WAYK:\Active Projects\08386 - Albemarle Beach Solar\08386A - Permitting\Cadd Files\08386A - Sheets.dwg, 5/28/2020 3:11:53 PM Albemarle & Associates, Ltd.115 West St. Clair StreetP.O. Box 3989Kill Devil Hills, NC 27948Phone: (252) 441-2113Fax: (252) 441-0965www.AlbemarleAssociates.comCert. of Licensure No. C-1027This document is the propertyof Albemarle & Associates, Ltd.All rights reserved. Anyunauthorized use or alterationis prohibited.CULVERT INSTALLATION PLANSUN ENERGY 1, LLCALBEMARLE BEACH SOLARSEAL 028572NORTH C A RO L IN APRO F E S SIO N A LENGIN E E RMIC HAEL J . M O R WAYK:\Active Projects\08386 - Albemarle Beach Solar\08386A - Permitting\Cadd Files\08386A - Sheets.dwg, 5/28/2020 1:48:15 PM Albemarle & Associates, Ltd.115 West St. Clair StreetP.O. Box 3989Kill Devil Hills, NC 27948Phone: (252) 441-2113Fax: (252) 441-0965www.AlbemarleAssociates.comCert. of Licensure No. C-1027This document is the propertyof Albemarle & Associates, Ltd.All rights reserved. Anyunauthorized use or alterationis prohibited.CULVERT INSTALLATION PLANSUN ENERGY 1, LLCALBEMARLE BEACH SOLARSEAL 028572NORTH C A RO L IN APRO F E S SIO N A LENGIN E E RMIC HAEL J . M O R WAYK:\Active Projects\08386 - Albemarle Beach Solar\08386A - Permitting\Cadd Files\08386A - Sheets.dwg, 5/28/2020 1:54:45 PM Albemarle & Associates, Ltd.115 West St. Clair StreetP.O. Box 3989Kill Devil Hills, NC 27948Phone: (252) 441-2113Fax: (252) 441-0965www.AlbemarleAssociates.comCert. of Licensure No. C-1027This document is the propertyof Albemarle & Associates, Ltd.All rights reserved. Anyunauthorized use or alterationis prohibited.CULVERT INSTALLATION PLANSUN ENERGY 1, LLCALBEMARLE BEACH SOLARSEAL 028572NORTH C A RO L IN APRO F E S SIO N A LENGIN E E RMIC HAEL J . M O R WAYK:\Active Projects\08386 - Albemarle Beach Solar\08386A - Permitting\Cadd Files\08386A - Sheets.dwg, 5/28/2020 3:03:02 PM J&7- lbemarle & ASSOCIATES, LTD. Albemarle Beach Solar Summary of Analysis of Jurisdictional Impacts May 28, 2020 Impact #1— 50' culvert: The existing ditch separating Phase G & F runs in a generally east / west direction with outfalls on each end. The ditch is a main collector for smaller lateral ditches in the area. It is fairly flat and therefore has the ability to flow either way depending on other conditions. The ditch is approximately 12' wide at the top of bank and just under 3' deep. Impact #1 is located towards the western end and appears to predominately flow to the west. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #1 under normal conditions is approximately 52.5 acres and the peak flow for a 10-year rainfall event is calculated to be 14.7 cfs. Tailwater elevations of the flat ditch cause the culvert to be outlet controlled. A 36" HDPE culvert has been chosen based upon the hydraulic analysis using HY- 8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.48 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 7" below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact #2 — culvert replacement/lengthening. The existing farm lateral in phase G discharges into the existing ditch separating Phase G & F (upstream of Impact #1) The ditch is approximately 8' wide at the top of bank and a little more than 2' deep. Impact #2 includes the replacement of an existing culvert located at the western end where it discharges into the main collector ditch. The 20' culvert will be replaced with 35' to allow for improved access. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #2 is approximately 6.5 acres and the peak flow for a 10-year rainfall event is calculated to be 6.7 cfs. Tailwater elevations of the flat ditch cause the culvert to be outlet controlled. A 24" HDPE culvert has been chosen based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.66 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 6" below the bottom of the ditch, or 25% of the culvert diameter. Impact #3 — culvert replacement/lengthening: The existing farm lateral in phase G discharges into the existing ditch separating Phase G & F (upstream of Impact #1) The ditch is approximately 8' wide at the top of bank and a little more than 2' deep. Impact #3 includes the replacement of an existing culvert located at the western end where it discharges into the main collector ditch. The 20' culvert will be replaced with 30' to allow for improved access. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #3 is approximately 14.6 acres and the peak flow for a 10-year rainfall event is calculated to be 13.9 cfs. Tailwater elevations of the flat ditch cause the culvert to be outlet controlled. A 36" HDPE culvert has been chosen based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.37 ft/sec and thus rip -rap should not be necessary for long term stabilization. The culvert invert is to be placed 7" below the bottom of the ditch, or approximately 20% of the culvert diameter. Land Planning - Engineering - Surveying - Environmental - Construction Management P.O. Box 3989, 115 W. Saint Clair St., Kill Devil Hills, North Carolina 27948 Phone: 252-441-2113 www.AlbemarleAssociates.com Far: 252-441-0965 Albemarle Beach Solar Farm Summary of Analysis of Jurisdictional Impacts May 28, 2020 Page 2 of 3 Impact #4 – 60’ culvert: The existing ditch separating Phase G & F runs in a generally east / west direction which has outfalls on each end. The ditch is a main collector for smaller lateral ditches in the area. It is fairly flat and therefore has the ability to flow either way depending on other conditions. The ditch is approximately 12’ wide at the top of bank and about 3’ deep. Impact #4 is located at the apparent / relative high point of this ditch. Due to this fact, there is very little upstream “drainage area” for the culvert, and the primary function for the culvert is to maintain the connection to allow for reverse flow when dictated by certain weather characteristics and / or maintenance issues. For this reason, hydraulic analysis of the culvert would be difficult to perform and a more practical approach is considered. A 30” HDPE culvert has been chosen based upon the ditch depth and maintaining a large of a opening as practical. The culvert invert is to be placed 6” below the bottom of the ditch, 20% of the culvert diameter. Impact #5 – 50’ culvert: The existing ditch in Phase F collected runoff from the east and south and routes the runoff to the west. It is fairly flat, with only about 7” of fall in more than 1200 feet. For this reason, the ditch is hydraulically inadequate to carry the 10-year rainfall event within its banks. The ditch is approximately 6’ wide at the top of bank and less than 2’ deep at the east where Impact #5 is located. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #5 under normal conditions is approximately 19.1 acres and the peak flow for a 10-year rainfall event is calculated to be 19.6 cfs. Tailwater elevations of the flat ditch exceed the ditch banks. For this reason, out of bank / overland flow is inevitable without further modifications to the channel. A 36” HDPE culvert has been chosen based upon the ditch depth and maintaining a large of a opening as practical. The outlet velocity is calculated to be 0.32 ft/sec and thus rip-rap should not be necessary for long term stabilization. The culvert invert is to be placed 7” below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact #6 – 50’ culvert: The existing ditch at the north end of Phase E runs from the south to the north. The ditch is approximately 10’ wide at the top of bank and about 2’ deep. Impact #6 is near the outfall of this ditch, just upstream from the wood / swamp line to the north. Based upon topographic survey, field review and aerial photography, the contribution drainage area for Impact #6 is approximately 41.1 acres and the peak flow for a 10-year rainfall event is calculated to be 35 cfs. North of this location the ditch is flat and surrounding grades are lowering, so the ditch depth is getting more shallow and the 10-year flow is no longer maintained within the banks of the ditch. Due to the high flow and relatively shallow ditch depth, two 36” HDPE culverts has been chosen based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 2.99 ft/sec and thus rip-rap should not be necessary for long term stabilization. The culvert invert is to be placed 7” below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact A – Wetland Crossing: In order to facilitate overhead transmission lines and access between Phase C & D, a 14’ wide access road is being installed that will need to cross two wetlands fingers. The crossings are being designed to minimize wetland impacts while maintaining drainage. Based upon topographic survey, LiDAR data and field review, the contribution drainage area for Impact A is approximately 16.6 acres and the peak flow for a 10-year rainfall event is calculated to be 7.1 cfs. Dual 24” HDPE culverts are being provided to allow for a hydraulic connection based Albemarle Beach Solar Farm Summary of Analysis of Jurisdictional Impacts May 28, 2020 Page 3 of 3 upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 3.86 ft/sec and thus rip-rap should not be necessary for long term stabilization. The culvert invert is to be placed 4” below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact B – Wetland Crossing: In order to facilitate overhead transmission lines and access between Phase C & D, a 14’ wide access road is being installed that will need to cross two wetlands fingers. The crossings are being designed to minimize wetland impacts while maintaining drainage. Based upon topographic survey and LiDAR data, field review and aerial photography, the contribution drainage area for Impact B is approximately 148.4 acres. Due to the large drainage area, the SCS TR-55 method was used to estimate the peak flow for a 10-year rainfall event which is calculated to be 45.3 cfs. This was calculated considering soil types and land uses to determine the curve number (CN=64) and is included within the attached calculations along with the soils maps for the approximate drainage area. Three 30” HDPE culverts are being provided to allow for a hydraulic connection based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 5.49 ft/sec and thus rip-rap should be provided for long term stabilization. The culvert invert is to be placed 6” below the bottom of the ditch, or approximately 20% of the culvert diameter. Impact C – Wetland Crossing: In order to facilitate overhead transmission lines and access between Phase E & H, a 14’ wide access road is being installed that will need to cross a low-lying swamp. The crossing has been designed to minimize wetland impacts while maintaining drainage. The swamp provides a hydraulic connection from a large portion of land to the west and southwest. Based upon topographic survey and LiDAR data, field review and aerial photography, the contribution drainage area for Impact C is approximately 400 acres. Due to the large drainage area, the SCS TR-55 method was used to estimate the peak flow for a 10-year rainfall event which is calculated to be 82 cfs. This was calculated considering soil types and land uses to determine the curve number (CN=73) and is included within the attached calculations along with the soils maps for the approximate drainage area. Five 36” HDPE culverts are being provided to allow for a hydraulic connection based upon the hydraulic analysis using HY-8, which indicates the culvert can pass the 10-yr rainfall event without overtopping the top of the access route. The outlet velocity is calculated to be 5.62 ft/sec and thus rip-rap should be provided for long term stabilization. The culvert invert is to be placed 7” below the bottom of the ditch, or approximately 20% of the culvert diameter. Attached to the summary are calculations for each crossing including time of concentration, peak discharge (10-yr rainfall event) and HY-8 analysis summary table. ALBEMARLE BEACH SOLAR FARMCULVERT DISCHARGE CALCULATIONS (10 YR EVENT)JURISDICTIONAL IMPACTSculvert c T (C) I added total c * A c * A cQarea area (incr) (sum) (cumm.)design(in/hr)(ac.)(ac.)(cfs)Impact #1 50' culvert 0.25 197 1.12 52.54 52.54 13.14 13.140.2514.7Impact #2 20' lengthen 0.25 29 4.1 6.51 6.51 1.63 1.63 0.256.7Impact #3 10' lengthen 0.25 34 3.81 14.55 14.55 3.64 3.64 0.2513.9Impact #4 60' culvert0.000.0Impact #5 50' culvert 0.25 29 4.1 19.10 19.10 4.78 4.78 0.2519.6Impact #6 50' culvert 0.25 43 3.4 41.13 41.13 10.28 10.28 0.2535.0WL Crossing #A 0.15 55 2.84 16.60 16.60 2.49 2.49 0.157.1WL Crossing #B 115148.4045.3WL Crossing #C 321400.0082.0(high point in existing ditch)(SCS TR-55 used due to drainage area size)(SCS TR-55 used due to drainage area size) TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 125.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 16.49 + 0.00 + 0.00 = 16.49 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 885.06 64.00 0.00 Wetted perimeter ((ft)) = 14.90 7.66 0.00 Channel slope (%) = 0.00 0.15 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 0.16 2.38 0.00 Flow length (ft) = 1600.0 2500.0 0.0 Travel Time (min) = 162.54 + 17.53 + 0.00 = 180.07 Total Travel Time, Tc .............................................................................. 197.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #1 (36” culvert – 50 LF) Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10 yr 14.70 14.70 9.17 2.15 2.48 0.75 8.85 25 yr 17.90 15.33 9.58 2.40 2.53 0.79 9.10 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 130.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.40 0.00 0.00 Travel Time (min) = 21.28 + 0.00 + 0.00 = 21.28 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 162.82 0.00 0.00 Wetted perimeter ((ft)) = 9.82 0.00 0.00 Channel slope (%) = 0.20 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) = 3.18 0.00 0.00 Flow length (ft) = 1400.0 0.0 0.0 Travel Time (min) = 7.35 + 0.00 + 0.00 = 7.35 Total Travel Time, Tc .............................................................................. 29.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #2 (Replace 20 LF culvert with 35’ LF of 24” HDPE) Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10 yr 6.70 6.70 9.59 2.30 2.66 0.00 9.00 25 yr 7.70 6.99 9.63 2.30 2.78 0.00 9.00 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #3 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 125.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 16.49 + 0.00 + 0.00 = 16.49 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 162.82 64.00 0.00 Wetted perimeter ((ft)) = 9.82 7.66 0.00 Channel slope (%) = 0.20 0.15 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 3.18 2.38 0.00 Flow length (ft) = 0.0 2500.0 0.0 Travel Time (min) = 0.00 + 17.53 + 0.00 = 17.53 Total Travel Time, Tc .............................................................................. 34.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #3 (Replace 20 LF culvert with 30 LF 36” HDPE) Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10 yr 13.90 13.90 9.25 2.20 2.37 0.00 9.00 25 yr 16.00 16.00 9.32 2.20 2.72 0.00 9.00 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #5 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 175.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 18.71 + 0.00 + 0.00 = 18.71 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 144.00 100.00 0.00 Wetted perimeter ((ft)) = 12.60 8.66 0.00 Channel slope (%) = 0.18 0.05 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 2.45 1.47 0.00 Flow length (ft) = 970.0 360.0 0.0 Travel Time (min) = 6.61 + 4.09 + 0.00 = 10.69 Total Travel Time, Tc .............................................................................. 29.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #5 (36” culvert – 50 LF) Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10-yr 19.60 1.98 14.26 2.66 0.32 0.00 14.26 25-yr 22.40 2.12 14.27 2.66 0.34 0.00 14.26 TR55 Tc Worksheet Hydraflow Express by Intelisolve Rational Impact #6 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 190.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 19.98 + 0.00 + 0.00 = 19.98 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area ((sqft)) = 144.00 201.64 0.00 Wetted perimeter ((ft)) = 12.60 10.33 0.00 Channel slope (%) = 0.20 0.20 0.00 Manning's n-value = 0.025 0.025 0.015 Velocity (ft/s) = 2.58 3.30 0.00 Flow length (ft) = 2400.0 1500.0 0.0 Travel Time (min) = 15.51 + 7.58 + 0.00 = 23.08 Total Travel Time, Tc .............................................................................. 43.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Crossing Impact #6 ( Two 36” culverts – 50 LF) Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10-yr 35.00 35.00 7.66 2.28 2.99 0.38 7.28 25-yr 40.50 40.50 7.75 2.35 3.41 0.39 7.35 TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing A Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.70 0.00 0.00 Travel Time (min) = 33.22 + 0.00 + 0.00 = 33.22 Shallow Concentrated Flow Flow length (ft) = 170.00 0.00 0.00 Watercourse slope (%) = 0.70 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.35 0.00 0.00 Travel Time (min) = 2.10 + 0.00 + 0.00 = 2.10 Channel Flow X sectional flow area ((sqft)) = 6400.00 189225.00 0.00 Wetted perimeter ((ft)) = 110.00 200.00 0.00 Channel slope (%) = 0.60 0.10 0.00 Manning's n-value = 0.100 0.100 0.015 Velocity (ft/s) = 0.93 0.79 0.00 Flow length (ft) = 1100.0 0.0 0.0 Travel Time (min) = 19.66 + 0.00 + 0.00 = 19.66 Total Travel Time, Tc .............................................................................. 55.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Wetland Crossing A (2 – 24” HDPE Culverts) Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10-yr 7.10 7.10 6.95 0.12 3.86 1.10 5.02 25-yr 8.30 8.30 7.04 0.13 4.06 1.16 5.03 TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing B Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 31.49 + 0.00 + 0.00 = 31.49 Shallow Concentrated Flow Flow length (ft) = 425.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.44 0.00 0.00 Travel Time (min) = 4.91 + 0.00 + 0.00 = 4.91 Channel Flow X sectional flow area ((sqft)) = 144.00 189225.00 0.00 Wetted perimeter ((ft)) = 12.60 200.00 0.00 Channel slope (%) = 0.28 0.10 0.00 Manning's n-value = 0.026 0.100 0.015 Velocity (ft/s) = 2.93 0.79 0.00 Flow length (ft) = 600.0 3600.0 0.0 Travel Time (min) = 3.41 + 75.66 + 0.00 = 79.07 Total Travel Time, Tc .............................................................................. 115.00 min 6RLO0DS²:DVKLQJWRQ&RXQW\1RUWK&DUROLQD :HWODQG&URVVLQJ&'UDLQDJH$UHD 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI  ƒ  1 ƒ  :ƒ  1ƒ  :ƒ  1 ƒ  :ƒ  1 ƒ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²:DVKLQJWRQ&RXQW\1RUWK&DUROLQD :HWODQG&URVVLQJ&'UDLQDJH$UHD 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI Wetland Crossing B Drainage Area Curve Number total area 140 ac CN % AaA C meadow 71 15%10.65 At C woods 73 3%2.19 C meadow 71 3%2.13 BoA B meadow 58 2%0.87 Ds C woods 73 0%0 C meadow 71 5%3.55 Dr D woods 79 5%3.555 Ro D woods 79 17%13.43 meadow 78 5%3.9 To B meadow 58 7% Wa D meadow 78 7%5.46 WkB B woods 60 5%3 meadow 58 27%15.66 100%64.395 Hydrology Report Hydraflow Express by Intelisolve Thursday, May 28 2020, 11:36 AM Albemarle Beach - Wetland Crossing B Hydrograph type = SCS Peak discharge (cfs) = 45.32 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 148.000 Curve number (CN) = 64 Basin Slope (%)= See Worksheet Hydraulic length (ft)= See Worksheet Tc method = TR55 Time of conc. (min) = 115 Total precip. (in) = 5.74 Storm Distribution = Type III Storm duration (hrs) = 24 Shape factor = 200 Hydrograph Volume = 1,117,848 (cuft); 25.662 (acft) 0.0 3.0 6.0 9.0 12.0 15.0 18.0 21.0 24.0 27.0 30.0 33.0 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Runoff Hydrograph 10-yr frequency Runoff Hyd - Qp = 45.32 (cfs) HY-8 Analysis Results Customized Table Culvert Crossing: Crossing B – (3) 30” HDPE Culverts Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10-yr 45.30 45.30 5.83 0.85 5.87 0.32 4.45 25-yr 68.90 68.90 6.90 1.10 7.02 0.38 4.70 TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing C Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.60 0.00 0.00 Travel Time (min) = 134.81 + 0.00 + 0.00 = 134.81 Shallow Concentrated Flow Flow length (ft) = 650.00 0.00 0.00 Watercourse slope (%) = 0.60 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 1.57 0.00 0.00 Travel Time (min) = 6.88 + 0.00 + 0.00 = 6.88 Channel Flow X sectional flow area ((sqft)) = 156025.00 0.00 0.00 Wetted perimeter ((ft)) = 295.00 0.00 0.00 Channel slope (%) = 0.12 0.00 0.00 Manning's n-value = 0.100 0.015 0.015 Velocity (ft/s) = 0.63 0.00 0.00 Flow length (ft) = 6750.0 0.0 0.0 Travel Time (min) = 179.24 + 0.00 + 0.00 = 179.24 Total Travel Time, Tc .............................................................................. 321.00 min Soil Map—Washington County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/13/2020 Page 1 of 3397400039742003974400397460039748003975000397520039754003975600397580039760003976200397400039742003974400397460039748003975000397520039754003975600397580039760003976200350500350700350900351100351300351500351700351900352100 350500 350700 350900 351100 351300 351500 351700 351900 352100 35° 55' 10'' N 76° 39' 26'' W35° 55' 10'' N76° 38' 14'' W35° 53' 53'' N 76° 39' 26'' W35° 53' 53'' N 76° 38' 14'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 500 1000 2000 3000 Feet 0 150 300 600 900 Meters Map Scale: 1:11,500 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AaA Altavista fine sandy loam, 0 to 2 percent slopes 17.4 4.4% At Augusta fine sandy loam 9.9 2.5% CtA Conetoe loamy fine sand, 0 to 3 percent slopes 9.2 2.3% DgA Dogue fine sandy loam, 0 to 3 percent slopes 35.7 9.0% Dr Dorovan mucky silt loam, overwash (Chowan) 24.6 6.2% Ro Roanoke loam 214.4 54.0% Wa Wahee fine sandy loam 37.3 9.4% WkB Wickham loamy sand, 0 to 4 percent slopes 48.8 12.3% Totals for Area of Interest 397.3 100.0% Soil Map—Washington County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/13/2020 Page 3 of 3 Wetland Crossing C Drainage Area Curve Number total area 400 ac CN % AaA C meadow 71 4%2.84 At C meadow 71 2%1.42 CtA A woods 36 3%1.08 DgA C woods 73 2%1.46 meadow 71 7%4.97 Dr D woods 79 6%4.74 Ro D woods 79 35%27.65 meadow 78 19%14.82 To B D Wa D meadow 78 9%7.02 WkB B woods 60 4%2.4 meadow 58 9%5.22 100%73.62 Hydrology Report Hydraflow Express by Intelisolve Monday, May 18 2020, 9:11 AM Albemarle Beach - Wetland Crossing C Hydrograph type = SCS Peak discharge (cfs) = 82.04 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 400.000 Curve number (CN) = 73 Basin Slope (%)= See Worksheet Hydraulic length (ft)= See Worksheet Tc method = TR55 Time of conc. (min) = 321 Total precip. (in) = 5.74 Storm Distribution = Type III Storm duration (hrs) = 24 Shape factor = 200 Hydrograph Volume = 4,174,422 (cuft); 95.832 (acft) 0.0 4.0 8.0 12.0 16.0 20.0 24.0 28.0 32.0 36.0 40.0 44.0 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) Runoff Hydrograph 10-yr frequency Runoff Hyd - Qp = 82.04 (cfs) TR55 Tc Worksheet Hydraflow Express by Intelisolve SCS Albemarle Beach - Wetland Crossing C Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. ((in)) = 3.74 0.00 0.00 Land slope (%) = 0.60 0.00 0.00 Travel Time (min) = 134.81 + 0.00 + 0.00 = 134.81 Shallow Concentrated Flow Flow length (ft) = 650.00 0.00 0.00 Watercourse slope (%) = 0.60 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) = 1.57 0.00 0.00 Travel Time (min) = 6.88 + 0.00 + 0.00 = 6.88 Channel Flow X sectional flow area ((sqft)) = 156025.00 0.00 0.00 Wetted perimeter ((ft)) = 295.00 0.00 0.00 Channel slope (%) = 0.12 0.00 0.00 Manning's n-value = 0.100 0.015 0.015 Velocity (ft/s) = 0.63 0.00 0.00 Flow length (ft) = 6750.0 0.0 0.0 Travel Time (min) = 179.24 + 0.00 + 0.00 = 179.24 Total Travel Time, Tc .............................................................................. 321.00 min HY-8 Analysis Results Customized Table Culvert Crossing: Wetland Crossing C – (5) 36” Culverts Discharge Names Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) Tailwater Elevation (ft) 10 year 82.00 82.00 5.49 0.89 5.62 0.33 4.39 25 year 115.50 115.50 6.01 1.09 6.38 0.38 4.59