Loading...
HomeMy WebLinkAboutU-2923MEMORANDUM DWQ - Water Quality Section RECEIVED DATE: August 6, 1996 AUG i.2 1996 TO: Eric Galamb, ESB, Wetlands - DOT Steve Mauney, WSRO - DWQ ENVIRONMENTAL SCIENCES oawrH Bradley Bennett, Technical Support, Stormwater FROM: Michelle Suverkrubbe, Planning Branch iy?S THROUGH: Alan Clark, Supervisor RE: Transmittal of Scoping Request NCDOT; Clemmonsville Road Widening Winston-Salem, Forsyth County Yadkin Pee Dee River Basin; Sub-Basin 03-07-04 Attached is a copy of the above document. The project is not a new road, but a widening project. It appears that the road does not cross any streams. The nearest stream is Perryman Branch, which is located to the south of the project, on either side of Hwy 150. It is has a Class C designation. Please review the document and provide written comments to me by August 22, 1996. Please give me a call at (919) 733-5083, ext. 567 if you should have any questions. My fax number is (919) 715-5637 if you would prefer faxing y ur comments. Please S let me know if you have no comments. ??? Q, QlA9_ F I would like to expedite this process in the fu a if To this end, can you send me anything you have that is dard "checklist" or "form left " esponse to these types of scoping requests from DOT or projects that may or may not have obvious impacts to streams or bridges proposed)? If I can send out your form letters for you it will save you (and I) time in the long run and would assure consistency in the EA's we review. Thank you. mis.Adotclemo.doc Department of Environment, Health, and Natural Resources i Office of Legislative and Intergovernmental Affairs Project Review Form Project Number: County: Date: g 7 nnC`7 ?l_ ?,i l1 --? ? Project located in 7th floor library Date Response Due (firm deadline): r / `•j ? i C? Inn w . s V 1 e a O( ) - S Do- C_- This project is being reviewed as indicated below: Regional Office/Phone Regional Office Area In-House Review ? Asheville ? All R/O Areas ? Soil and Water ? Marine Fisheries ? Fayetteville ?i ? Air ? Coastal Management ? Water Planning ? Water El Water Resources ? Environmental Health Mooresville Groundwater Wildlife ?'Solid Waste Management ? Raleigh `w`and Quality Engineer R Forest Resources ? Radiation Protection ? Washington ? Recreational Consultant Land Resources ? David Foster ? Wilmington El Coastal Management Consultant k Parks and Recreation ? Other (specify) ? Others )F1 nvironmental Management Winston-Salem PWS Monica Swihart Manager Sign-Off/Region: Date: In-House Reviewer/Agency: Response (check all applicable) Regional Office response to be compiled and completed by Regional Manager ? No objection to project as proposed ? No Comment ? Insufficient information to complete review ? Approve ? Permit(s) needed (permit files have been checked) ? Recommended for further development with recommendations for strengthening (comments attached) ? Recommended for further development if specific & substantive changes incorporated by funding agency (comments attached/authority(ies) cited) In-House Reviewer complete individual response. ? Not recommended for further development for reasons stated in attached comments (authority(ies) cited) ?Applicant has been contacted ?Applicant has not been contacted ? Project Controversial (comments attached) ? Consistency Statement needed (comments attached) ? Consistency Statement not needed ? Full EIS must be required under the provisions of NEPA and SEPA ? Other (specify and attach comments) RETURN TO: Melba McGee Office of Legislative and Intergovernmental Affairs PS-t W y... ° yPn ??! •VY Prr. ?• STATE OF NORTH CAROLINA DEPARTMENT OF TP ANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETT JR. GOVERNOR P.O. BOX 25201. RALEIGH. N.C. 27611-5201 SECRETARY July 23, 1996 MEMORANDUM TO: Mrs. Chrys Baggett, Director State Clearinghouse Dept. of Administration FROM: H. Franklin Vick, P. E., Manag Planning and Environmental Branch SUBJECT: Winston-Salem, Clemmonsville Road (SR 2747), from Old Salisbury Road (SR 3011) to South Main Street, Forsyth County, State Project No. 9.8091853, U-2923 The Planning and Environmental Branch of the Division of Highways has begun studying the proposed improvements to Clemmonsville Road (SR 2747) in Forsyth County. The project is included in the 1997-2003 North Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year 1998 and construction in fiscal year 1999. The proposed project proposes to widen Clemmonsville Road (SR 2747) from Old Salisbury Road (SR 3011) to South Main Street in Winston-Salem. The improvement will widen the existing two-lane roadway to five-lane curb and gutter facility. The total length of the project is 3.1 km (1.9 miles). We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals which may be required by your agency. Your comments will be used in the preparation of a state funded Environmental Assessment. This document will be prepared in accordance with the State Environmental Policy Act. It is desirable that your agency respond by September 6, 1996 so that your comments can be used in the preparation of this document. If you have any questions concerning the projegt, please contact Clarence Coleman, Project Planning Engineer, of this Branch (M 9J $42. Ext. 208. kEC BFV/plr Attachment _ N:? S'. :,.?; NORTH CAROLLNA DEPARTMENT OF ?. TRANSPROTATION DIVISION OF HIGHWAYS PLANNLNG AND ENVIRONMFrNTAL BRANCH WINSTON-SALEM SR 2747 (CLEMMONSVILLE ROAD) FROM SR 30n (OLD SALISBURY ROAD) TO SOUTH MAIN STREET FORSYTH COUNTY T. I. P. PROJECT U-2923 t Mlle 1/ FIGURE 1 State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality AmesB. Hunt, Jr., Govemor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director August 29, 1996 MEMORANDUM To: Melba McGee From: Eric GalambM Subject: Water Quality Checklist for EA/EIS Clemmonsville Road Forsyth County, TIP # U-2923 DEHNR No. 97-0053 AT.R?FA ?Iaj 02 ID EHNR Documents The Division of Water Quality (WQ) requests that the following topics be discussed in the EA/EIS documents: A. Identify the streams potentially impacted by the project. The stream classifications should be current. Are the streams supporting their uses? B. Identify the linear feet of stream channelization/relocations. If the original stream banks were vegetated, it is requested that the channelized/relocated stream banks be revegetated. C. Number of stream crossings. D. Will permanent spill catch basins be utilized? WQ requests that these catch basins be placed at all water supply stream crossings. Identify the responsible party for maintenance. E. Identify the stormwater controls (permanent and temporary) to be employed. F. Please ensure that sediment and erosion control measures are not placed in wetlands. G. Wetland Impacts i) Identify the federal manual used for identifying and delineating jurisdictional wetlands. ii) Have wetlands been avoided as much as possible? iii) Have wetland impacts been minimized? iv) Mitigation measures to compensate for habitat losses. v) Wetland impacts by plant communities affected. vi) Quality of wetlands impacted. vii) Total wetland impacts. viii) List the 401 General Certification numbers requested from WQ. Environmental Sciences Branch • 4401 Reedy Creek Road Raleigh, North Carolina 27607 Telephone 919-733-9960 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 500% recycled110% post consumer paper H. Borrow/waste areas should avoid wetlands to the maximum extent practicable. Prior to the approval of any borrow/waste site in a wetland, the contractor shall obtain a 401 Certification from WQ. Did NCDOT utilize the existing road alignments as much as possible? Why not (if applicable)? J. Please provide a detailed discussion for mass-transit as an option. K. To what extent can traffic congestion management techniques alleviate the traffic problems in the study area? L. Please provide a conceptual mitigation plan to help the environmental review. The mitigation plan may state the following: 1. Compensatory mitigation will be considered only after wetland impacts have been avoided and minimized to the maximum extent possible. 2. On-site, in-kind mitigation is the preferred method of mitigation. In-kind mitigation within the same watershed is preferred over out-of-kind mitigation. 3. Mitigation should be in the following order: restoration, creation, enhancement, and lastly banking. M. To the maximum extent practicable, DOT should not install the bridge bents in the creek. N. DWQ requests that weep holes not be installed in the replacement bridges in order to prevent sediment and other pollutants from entering the body of water. If this is not completely possible, weep holes should not be installed directly over water. WQ is also concerned about secondary wetland impacts. For WQ to concur with an alternative in the mountains or the piedmont, DOT will need to commit to full control of access to the wetland parcels or DOT to purchase these parcels for wetland mitigation. Please note that a 401 Water Quality Certification cannot be issued until the conditions of NCAC 15A: 01C.0402 (Limitations on Actions During NCEPA Process) are met. This regulation prevents WQ from issuing the 401 Certification until a FONSI or Record of Decision (ROD) has been issued by the Department requiring the document. It is recommended that if the 401 Certification application is submitted for review prior to the sign off, the applicant states that the 401 should not be issued until the applicant informs WQ that the FONSI or ROD has been signed off by the Department. Written concurrence of 401 Water Quality Certification may be required for this project. Applications requesting coverage under our General Certification 14 or General Permit 31 (with wetland impact) will require written concurrence. Please be aware that 401 Certification may be denied if wetland or water impacts have not been avoided and minimized to the maximum extent practicable. u-2923.sco cc: Michelle Suverkrubbe fAXW AUG 2 9 1996 o-?,v. SCA7Ep STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. GOVERNOR DIVISION OF HIGHWAYS P.O. BOX 25201, RALEIGH, N.C. 27611-5201 July 23, 1996 MEMORANDUM TO: FROM: SUBJECT: Mr. Eric Galamb RECE1VED L/lit :r.0 1996 cJVCS8 ??I RON NrA ti cl, GARLAND B. GARRETT JR. SECRETARY DEM - DEHNR - Water Quality Lab 4401 Reedy Creek Road H. Franklin Vick, P. E., Manager Planning and Environmental Branc Winston-Salem, Clemmonsville Road (SR 2747), from Old Salisbury Road (SR 3011) to South Main Street, Forsyth County, State Project No. 9.8091853, U-2923 The Planning and Environmental Branch of the Division of Highways has begun studying the proposed improvements to Clemmonsville Road (SR 2747) in Forsyth County. The project is included in the 1997-2003 North Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year 1998 and construction in fiscal year 1999. The proposed project proposes to widen Clemmonsville Road (SR 2747) from Old Salisbury Road (SR 3011) to South Main Street in Winston-Salem. The improvement will widen the existing two-lane roadway to five-lane curb and gutter facility. The total length of the project is 3.1 km (1.9 miles). We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals which may be required by your agency. Your comments will be used in the preparation of a state funded Environmental Assessment. This document will be prepared in accordance with the State Environmental Policy Act. It is desirable that your agency respond by September 6, 1996 so that your comments can be used in the preparation of this document. If you have any questions concerning the project, please contact Clarence Coleman, Project Planning Engineer, of this Branch at (919) 733-7842. Ext. 208. HFV/plr Attachment N-4641 NORTH CAROLINA DEPARTMENT OF r TRANSPROTATION DIVISION OF HIGHWAYS PLATING AND ENVIRONMENTAL BRANCH IVINSTON-SALEM SR 2747 (CLEMMONSVILLE ROAD) FROM SR 3011 (OLD SALISBURY ROAD) TO SOUTH MAIN STREET FORSYTH COUNTY T. I. P. PROJECT U-2923 0 mile 1 /2 1 1 1 . FIGURE 1 State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Govemor Jonathan B. Howesy Secretary A. Preston Howard, Jr., P.E., Di%.ctor eptember A p ' T4 X 4;1i [D F= F1 17, 1996 MEMORANDUM To: Melba McGee From: Eric Galamb Subject: Water Quality Checklist for EA/EIS Documents Clemmonsville Road (SR 2747) Forsyth County, TIP # U-2923 The Division of Water Quality (WQ) requests that the following topics be discussed in the EA/EIS documents: A. Identify the streams potentially impacted by the project. The stream classifications should be current. Are the streams supporting their uses? B. Identify the linear feet of stream channeIization/re locations. If the original stream banks were vegetated, it is requested that the channelized/relocated stream banks be revegetated. C. Number of stream crossings. D. Will permanent spill catch basins be utilized? WQ requests that these catch basins be placed at all water supply stream crossings. Identify the responsible party for maintenance. E. Identify the stormwater controls (permanent and temporary) to be employed. F. Please ensure that sediment and erosion control measures are not placed in wetlands. G. Wetland Impacts i) Identify the federal manual used for identifying and delineating jurisdictional wetlands. ii) Have wetlands been avoided as much as possible? iii) Have wetland impacts been minimized? iv) Mitigation measures to compensate for habitat losses. v) Wetland impacts by plant communities affected. vi) Quality of wetlands impacted. vii) Total wetland impacts. viii) List the 401 General Certification numbers requested from WQ. Environmental Sciences Branch • 4401 Reedy Creek Road Raleigh, North Carolina 27607 Telephone 919-733-9960 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 5096 recycled/100/6 post consumer paper H. Borrow/waste areas should avoid wetlands to the maximum extent practicable. Prior to the approval of any borrow/waste site in a wetland, the contractor shall obtain a 401 Certification from WQ. 1. Did NCDOT utilize the existing road alignments as much as possible? Why not (if applicable)? J. Please provide a detailed discussion for mass-transit as an option. K. To what extent can traffic congestion management techniques alleviate the traffic problems in the study area? L. Please provide a conceptual mitigation plan to help the environmental review. The mitigation plan may state the following: 1. Compensatory mitigation will be considered only after wetland impacts have been avoided and minimized to the maximum extent possible. 2. On-site, in-kind mitigation is the preferred method of mitigation. In-kind mitigation within the same watershed is preferred over out-of-kind mitigation. 3. Mitigation should be in the following order: restoration, creation, enhancement, and lastly banking. M. To the maximum extent practicable, DOT should not install the bridge bents in the creek. N. DWQ requests that weep holes not be installed in the replacement bridges in order to prevent sediment and other pollutants from entering the body of water. If this is not completely possible, weep holes should not be installed directly over water. WQ is also concerned about secondary wetland impacts. For WQ to concur with an alternative in the mountains or the piedmont, DOT will need to commit to full control of access to the wetland parcels or DOT to purchase these parcels for wetland mitigation. Please note that a 401 Water Quality Certification cannot be issued until the conditions of NCAC 15A: 01C . 0402 (Limitations on Actions During NCEPA Process) are met. This regulation prevents WQ from issuing the 401 Certification until a FONSI or Record of Decision (ROD) has been issued by the Department requiring the document. It is recommended that if the 401 Certification application is submitted for review prior to the sign off, the applicant states that the 401 should not be issued until the applicant informs WQ that the FONSI or ROD has been signed off by the Department. Written concurrence of 401 Water Quality Certification may be required for this project. Applications requesting coverage under our General Certification 14 or General Permit 31 (with wetland impact) will require written concurrence. Please be aware that 401 Certification may be denied if wetland or water impacts have not been avoided and minimized to the maximum extent practicable. u-2747.sco cc: Michelle Suverkrubbe a. N. C. DEPARTMENT OF TRANSPORTATION TRANSMITTAL SLIP DATE TO: REF. NO. OR ROOM, BLDG. IL f C ('..) P' 64 IM L7 ?(i ?T N r z "FROM: REF. NO.. OR ROOM, BLDG.. l"ilCl?,?r?G S14Mt?S f ?L - ACTION ? NOTE AND FILE - ? PER OUR CONVERSATION NOTE AND RETURN TO ME ? PER YOUR REQUEST ?-RETURN WITH MORE DETAILS- ? FOR YOUR APPROVAL ? NOTE AND SEE ME ABOUT THIS FOR YOUR INFORMATION PLEASE ANSWER ? FOR YOUR COMMENTS -? PREPARE REPLY FOR MY "SIGNATURE ? SIGNATURE' TAKE APPROPRIATE ACTION -. ? INVESTIGATE ANDREPORT COMMENTS: '.f 6?;r.5(Aipa, ti STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETr JR. GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 SECRETARY April 17, 1996 MEMORANDUM TO: Mr. Eric Galamb DEM - DEHNR - Water Quality La FROM: H. Franklin Vick, P. E., Manager Planning and Environmental Brrlch SUBJECT: Review of Scoping Sheets for U-2923; Clemmonsville Road (SR 2747) from Old Salisbury Road (SR 3011) to South Main Street; Winston-Salem, Forsyth County; State Project 9.8091853; TIP No. U-2923 Attached for your review and comments are the scoping sheets for the subject project (See attached map for project location). The purpose of these sheets and the related review procedure is to have an early "meeting of the minds" as to the scope of the work that should be performed and thereby enable us to better implement the project. A scoping meeting for this project is scheduled for May 15, 1996 at 2:00 p.m. in the Planning and Environmental Branch Conference Room (Room 434). You may provide us with your comments at the meeting or mail them to us prior to that date. Thank you for your assistance in this part of our planning process. If there are any questions about the meeting or the scoping sheet , please call Michele James, Project Plannin ngineer, at 733-7844, Ext. 213. (Alema-, ?f 23 MJ/tp Attachment ITW ?IVV - I V? ?0 ? C iIZ ,?, ,z _qq -Iz - (q) NCO,) PROJECT SCOPING SHEET Date 4/12/96 Re,6sion Date Project Development Stage Programming Planning X Design TIP #: U-2923 Project #: 9.8091853 F. A. Project #: N/A Division: 9 County: Forsvth Route(s): Clemmonsville. Road (SR 2747) Functional Classification: Collector (SR 2747) Length: 1.9 miles Purpose of Project: To increase traffic carrying capacity and to improve safety Description of Project (including specific limits) and major elements of work: The proposed improvements will widen Clemmonsville Road (SR 2747) f Type of environmental document to be prepared: State EnN ironmental Assessment State Finding Of No Significant Impact Environmental study schedule: Begin Complete SEA In Progress April 97 SFONSI June 97 November 97 Will there be special funding participation by municipality, developers, or other?: Yes No X PROJECT SCOPLNG SHEET Design Standards Applicable: AASHTO Z 3R Design Speed: Current Planning Cost Estimate: Construction (including engineering and contingencies) ............................... S5.850,000 Right of Way (including relocation, utilities, and acquisition) .. S Force Account Items ............................... S Preliminary Engineering .............................. S TOTAL PLA TINTING COST ESTINLATE ........ S 1996-2002 TIP Cost Estimate: Construction .......................................................... S 5,350,000 Right of Way ......................................................... S 3,000,000 Post Year Right of Way and Construction .............................5 2,000.000 TOTAL TIP COST ESTIMATE S 10,350,000 PROJECT SLOPING SHEET Type of Access Control: Full Partial. Number of Interchanges in project area: one Grade Separations: one Stream Crossings: none Typical Section: Proposed: five-lane curb and gutter section Existing : two-lane shoulder section None Traffic (ADT): 1996 2020 SR 2747 13.440 - 18 ,640 Bpd 22,104 - 31,000 Npd PROJECT SCOPING SHEET List any special features, such as railroad involvement, which could affect cost or schedule or project: Bridge at interchange ITEMS REQUIR Estim ted Costs of Pavement: Shoulders: Y COTWME! ITS COST Improvements: Surface .......................................... Base .......................... Nfilling & Recycling .......................... Turnouts ....................................... Paved .......................................... Earth .......................................... Earthwork ............................ ...................... . 'bb=tf=e-Remsr .... Pavement Removal Subgrade & Stabilization .......................................... Drainage (list any special items) .................................... Sub-drainage ......................................................... Structures: lVidth 1 Length Bridge Rehabilitation X. New Bridge _64x 200 ........... Widen Bridge ........... ? Remove Bridge _28 Y 185 ........... New Culverts: Size Length ........... Fill Height Culvert Extension............ Retaining Walls: Type ?-Wg. Hgt. .. Skew Noise Walls ................................................. Miscellaneous Structures .................................... Concrete Curb & Gutter .......................................... Concrete Sidewalk ................................................... Guardrail ............................................................ . Fencing: W.W and/or C.L. .................... Erosion Control ...................................................... Landscape... Utility Construction (water & sewer) Lightingg ............................................................. . Traffic Control ...................................................... Signing: 'New ................................................ Upgrade .......................................... Traffic Signals: 2 New .................................... 2 Upgrade .............................. Railroad Signals: - New .................................... Upgrade .............................. With-without Arms .................. 3R (if applicable): Drainage Safety Enhancement...... Roadside Safety Enhancement...... Realignment for Safety lipgnade... Pavement iVlarkin s: Paint v" TheYmo...>....... . Markers .............................. 1,141, 750 S S is S S 'S S S S 395,600 _30.820 196.250 -332,000 'S S 793,600 IS S X11.1=10 S ?S S S S ;S - 1=11,280 S 'S is 'S IS 33,000 561,600 - S S 103,100 - - - S S S is 70,000 _40,000 ` is S S S S _ 42,750 Delineators........... !S Other (clearing, grubbing. misc.. & mob.)... S 1.185.510 CONTRACT COST (subtotal) S _ 5,109,000- PROJECT SCOPLNG SHEET Contingencies & Engineering ................................................ S 7419000 PE Costs ........................................................................ S Force Account ............................................................... $ SUBTOTAL... S 5,350,000 Right of Way: Will Contain within Existing R/W: Yes No Existing Right of Way Width: Additional Right of Way Needed: Width Est. Cost... S Easements: Type Width Est. Cost... S RIGHT OF WAY SUBTOTAL...... S TOTAL ESTLtiIATED COST...... S Prepared by: Date: The above scoping has been reviewed and approved* by: ENTI' DATE 1 Highway Design Roadway Structure Design Services Geotechnical Hydraulics Location & Surveys Photogrammetry Prelim. Est. Engineer Right of Way Right of Way Utilities Traffic Engineering Project Management County Manager City/tilunicipality Others BUT Member I -4VIgn, Program & Policy Chief En6neer-Preeonstr Chief Engineer-Operations i Secondary Roads Officer j Construction Branch Roadside Environmental Maintenance Branch Statewide Planning Division Engineer Bicycle Coordinator Program Development Federal Highway Admin. Dept. of Cultural Resources DEHNR INTIT DATE Scoping Sheets for Local Officials will be sent to Division Engineer for handling. Comments/Remarks: *If you are not in agreement with proposed project or scoping, note your proposed rexisions in section above and initial and date after continents. NORTH CAROLLXA DEPARTISENT OF TRA\SPROTATION DMSION OF HIGHWAYS PLA\'NL\G A\'D E.NNMON-IMN'TAL BRANCH WriSTON-SALF-M SR 2747 (CLE.XMONS-v= ROAD) FROM SR 3011 (OLD SALISBURY ROAD) TO SOUTH N A?1 STREET FORSYTH COUNTY T. I. P. PROJECT U-2923 0 mil. 1/2 I I FIGURE 1