HomeMy WebLinkAboutNCC202266_ESC Approval Submitted_20200529ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quality
May 8, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
HSREI, LLC
Attention: A. Scott Innis, V.P. & Asst. Sec.
6000 Monroe Road
Charlotte, North Carolina 28212
RE: Project Name: Hendrick Commercial Truck Center (Express Review)
Acres Approved: 10.37
Project ID: CABAR-2020-072
County: Cabarrus, City: Concord
Address: Papa Joe Hendrick Blvd.
River Basin: Yadkin -Pee Dee
Stream Classification: Other
Submitted By: Brian Rossi, PE, EMH&T
Date Received by LQS: May 6, 2020
Plan Type: Revised
Dear Mr. Innis:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee
will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
e:!5-of Mooresville Regional Office ( 610 East Center Avenue. Suite 301 ( Mooresville, North Carolina 28115
NORT:1 AR WE
W
uep. .f U*-W G.1KV 704.663.1699
Letter of Approval with Modifications
HSREI, LLC
May 8, 2020
Page 2 of 3
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
cc: Brian Rossi, PE
Letter of Approval with Modifications
HSREI, LLC
May 8, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Hendrick Commercial Truck Center (Express Review)
Project ID: CABAR-2020-072
County: Cabarrus
1. For Basin #1, the skimmer must be installed at Elev. 661.
2. For Basin #2, the low water window at Elev. 664.8 shall be temporarily plugged until the
basin is allowed to be converted to the permanent measure.
3. All disturbed areas associated with the SS line installation shall be seeded & mulched (or
sodded if desired) with Fescue (or Fescue blend) at an application rate of 100 Ibs/acre
minimum. Straw mulch, lime, and fertilizer rates under temporary seeding specifications
on Sheet C3.2 shall be followed for permanent seeding.