HomeMy WebLinkAbout20200711 Ver 1_CAMA Application_20200527ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
May 27, 2020
MEMORANDUM:
NORTH CAROLINA
E'nvlronmental Quality
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gregg. bod nar(cDncden r. gov
SUBJECT: CAMA /Dredge & Fill Application Review
Applicant: John & Hannah Michels
Project Location: 2147 Drake Road in Currituck County
Proposed Project: Dredge a man-made canal, construct a bulkhead, and install a L-shaped
pier and platform with two designated wet slip areas attached
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Gregg Bodnar at the address above by June 17, 2020. If you have any questions
regarding the proposed project, contact Robert Corbett (252-264-3901, ext. 233 when appropriate, in-
depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY
SIGNATURE
DATE
o,vunnamar w+�
North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City office 1 401 South Griffin Street, Suite 3001 Elizabeth City, North Carolina 27909
252.264.3901
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: John & Hannah Michals
2. LOCATION OF PROJECT SITE: 2147 Drake Road within the Carova Beach s/d of
Corolla, Currituck County adjacent to a man-made canal leading to Knotts Island Bay
which connects to the Currituck Sound
Latitude: 36030'53.21"N Longitude: - 75052'9.69"W
3. INVESTIGATION TYPE: CAMA / Dredge & Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 3/19/20
Was Applicant Present — Yes (Consultant)
5. PROCESSING PROCEDURE: Application Received Complete — 5/14/2020
Office — Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Currituck County
Land Classification from LUP - Limited Service Area
(B) AEC(s) Involved: Coastal Wetlands (CW), Estuarine Waters (EW), Public Trust
Area (PTA), and Estuarine Shoreline (ES)
(C) Water Dependent: Yes
(D) Intended Use: Private Residential
(E) Wastewater Treatment: Existing — None
Planned — None
(F) Type of Structures: Existing — None
Planned - Bulkhead, Platform, Boat Slip
(G) Estimated Annual Rate of Erosion: 8", The erosion is on the north side of the
property adjacent to the existing bulkhead
return. This erosion is believed to be from the
constant boat traffic.
Source — Applicant
7. HABITAT DESCRIPTION: (Area ftZ)
,zw A r)P:n FXr.A\/ATPn Fill OTHFR
(A) High Ground within
5,050 ft2 (Spoils)
5,400 ft2Disturbed
ES AEC
(Bulkhead)
(B) Shallow Bottom
6,300 ft2 (Dredge)
1,170 ft2 (Bulkhead)
EW,PTA& CW AEC
(C) Open Water EW and
144 (Docking
PTA AEC
Facility)
(D) Total Area Disturbed: 18,064 ftZ
(E) Primary Nursery Area: No
(F) Water Classification: SC Open to Shellfishing: No
8. PROJECT SUMMARY: The applicant proposes to dredge a man-made canal,
construct a new bulkhead, and install a new L shape pier and platform with 2
designated wet slip areas attached.
John & Hannah Michals
Field Investigation Report
Page 2
Project Setting
The site of the proposed development is located at 2147 Drake Road, within the Carova
Beach s/d of Corolla, Currituck County, adjacent to a man-made canal leading to Knotts
Island Bay which connects to the Currituck Sound.
The project location is a vacant lot, 14,374 sf in size, and has approximately 180' of
unhardened shoreline. The elevation of the property is approximately +3 feet above NWL.
According to the USDA's Natural Resources Conservation Services' Web Soil Survey, the
soil on the property is made up of Newhan fine sand. A fringe coastal wetland consisting of
Bulrush (Scirpus spp.) was observed growing along the entire shoreline. Other vegetation
on the property consisted of trees and grasses that are mowed periodically.
The adjacent riparian property to the northwest is a similarly vegetated vacant lot with a
bulkheaded shoreline. The bulkhead on this property continues 12' onto the applicant's
property before turning 900 to the south for approximately 20' then 450 to the west for
approximately 15' completing the return wall. This bulkhead return wall has severely eroded
the applicant's shoreline. The adjacent riparian property to the south is another similar
vegetated lot with a bulkheaded shoreline, a pier, and platform.
The man-made canal, which connects to Knotts Island Bay, is classified as Joint waters by
the agreement with the Marine Fisheries Commission and Wildlife Resources Commission.
The Division of Environmental Management's water quality classification for this waterbody
is SC and it is closed to shellfish taking. Water depths within the project site range from 0.5'
to 4.5' below normal water level (NWL) and average -2.6'. The bottom substrate within the
project area is made up of muddy sand. Submerged aquatic vegetation, as defined by the
Division of Marine Fisheries, was not observed growing within the project area.
Development Proposal
The applicant proposes to mechanically dredge a 180' x 35' section of a man-made canal to
a connecting depth of -4.5'. All of the spoils will be kept on the project site and will be
located 30' from NWL. Once the dredging is complete the applicant proposes to construct
180' of wooden bulkhead. In order to connect to the bulkhead located on the adjacent
property to the north, the proposed bulkhead must extend a maximum distance of 25'
waterward of NWL. The proposed bulkhead will continue in a straight alignment connecting
to the bulkhead on the adjacent property to the south over a distance of 180' averaging 6.5'
waterward measured from normal water level. The bulkhead will be backfilled using the
spoils from the dredging once it has dried.
Lastly, centered on the lot, the applicant proposes to construct an L shaped 4' x 12' pier
with a 4' x 24' platform extending to the south. On the west side of the platform, between
the platform and the bulkhead, the applicant proposes 2 designated wet slips. The wet slips
will be designated by placing 2 tie piles in this area. The docking facilities location will not
encroach within the 15' setback area and will not violate the % waterbody width
requirement.
John & Hannah Michals
Field Investigation Report
Page 3
Anticipated Impacts
• The dredging of the canal will result in the removal of 443 yd' of material within
the PTA and EW AEC.
• The dredging of the canal will result in 6,300 ft2 of shallow water bottom
disturbance within the PTA and EW AEC.
• The spoil disposal area will disturb 5,050 ftz of high ground within the ES AEC.
• The construction of the bulkhead along the proposed alignment will result in the
filling of ±1,170 ft2 of the PTA and EW AEC along 180' of the ES AEC filling
±540 ftz of CW AEC.
• The construction of the bulkhead will disturb ±5,400 ft2 of high ground within the
ES AEC. '
• The construction of the docking facility Will shade 144 ft2 of open water of the
PTA and EW AEC. '
Submitted by: Robert Corbett
Date: 05/22/2020
�IL�l
(U.
Received
tt
r
eoa 21 2020
IQ -+„k, •4- 6 -k
Ow d'i�i
Cl'� Y`�A0.iN
�'Int 1.-rYoa�..ee� WL0.tl^Gvil o��
_.
CR�nL0.lye1t,%A �-14r—tO�
t a. u.'
-co-
VLU�Wv �M. ✓�N+9�
o i o
c
r--
11
eL(cc -e ss o
C a l toy � s
` � � t v Y►40 V -e c1
t
Id-o
qqo
r a r-^ d <, -G Jr 1` 5 6 � aV i v'.� V N d��
d— bL,. I k Ltd I
N
Received
hplt 21 2020
ON MP-1
APPLICATION for DCM U
Major Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
Applicant 1: First Name
MI
Last Name
C�LOLls
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
A �-.imj1600 -5o q S
; t '
PO Box
C2,^ry
f1ti��rrR9�r�r,
i
State
VA.
ZIP
241 f! 2
Country
V SA
Phone No.
ext.
FAX No.
Street Address (if different from above)
City
State
ZIP
Email
2. Agent(ContractorInformation
Business Name
Agent/ Contractor 1: First Name
C k e'-5 �
MI
�.
Last Name
I� � 2 K
o✓
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address ,,i/
PO Box
City
// I
State /
ZIP
�L? '-3
Phone No. 1
7 S-7 -335-) S7 3ext.
Phone No. 2
i53 -0573 ext.
FAX No.
Contractor #
Street Address (if different from above)
Ciry
State
ZIP
Email
<Form continues on back>
252-808.2808 :: 1.888.4RCOAST :: www. nccoastalmanagement. net
Form DCM MP-1 (Page 2 of 4) Apt? 2 1 2020 APPLICATION for
Major Development Permit
rNPRA_ P
3. Project Location
County (can be multiple)
Street Address
�ILr7
State Rd. #
Subdivisi/o�n Name /r_
City /L M f /p
State
Zip
Zip
Phone No.
Lot No.(s) (if many, attach additional page with list)
ext.
$a 1 , 7
Ga
a. In which NC river basin is the project located?
p�s f
b. Name of body of water nearest to proposed project
CILKJ kue-145 Tsl4Ka(
V 6 aY.k
da rya
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
❑Natural []UnknowntK Manmade Unknown
JJ �'
1
�u-r r� w � ✓�
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
$yes []No
work falls within. r'
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sci t.)
11180
0.33 ACV S
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(if man; lot sizes, please attach additional page with a list)
❑NHW orWWL S
e. Vegetation on tract
L
oa. k.S Sn4.t I rn
/J /
t— l 41w
4 -CS I
�O
lo't5 WC_
f. Man-made features and uses now on tract
h 0 1^'L
g. Identify and describe the existing land uses adjacent to the proposed project site.
VOL catti4 w%dLll� bw�Lkktad1
In. How does local government zone the tract?
i.
Is the proposed project consistent with the applicable zoning?
J1, �K " I
r GS
(Attach zoning compliance certificate, if applicable)
r v`
D'es ❑No El NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes KNO
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. [--]Yes Oo ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it Involve a ❑Yes Oo ❑NA
National Register listed or eligible property?
<Form continues on next page>
252.808.2808 :: 1-888-4RCOAST :: www. nccoastalmana gement. net
Received
Form DCM MP-1 (Page 3 of 4) APPLICATION for
boo 1 2Q2(J Major Development Permit
M. (1) Are there wetlands on the site?
Y Yes
❑No
(ii) Are there coastal wetlands on the site?
XYes
❑No
(Ili) If yes to either (i) or (ii) above, has a delineation been conducted?
❑Yes
No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
'VIOK-r
o. Describe existing drinking water supply source.
N o K—el
p. Describe existing storm water management or treatment systems.
YL O 1W L
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government
45Private/Community
b. Give a brief description of purpose, use, and daily operations of thelproject when complete.
bI• O Rn oce.-C SS d"0 so--- QµJ Auo,[j ! —q^ C1ctJ
ftv C['J i K5 57 �0v G fr1^L
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored. y,.{O. C A , O1r�c O�0V (ii- 5 W w 11 CSC 4fC/Q J0V-
d. List all development activities you propose.
)r.-p-of3 e- / bw 1kG,� 6P 0N
e. Are the proposed activities maintenance of an existing project, new work, or both?
nGw wo✓k '
.What is the approximate total disturbed land area resulting from the proposed project? Y,(Sq. Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes Mo ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
JU
i. Will wastewater or stormwater be discharge into a wetland? ❑Yes o ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No []NA
j. Is there any mitigation proposed? ❑Yes Wo 0NA---J
If yes, attach a mitigation proposal.
<Form continues on back>
252.808.2808 :: 1-888.4RCOAST :: www.necoastaimanagement.net
Form DCM MP-1 (Page 4 of 4)
Received APPLICATION for
APR 21 2020 Major Development Permit
6. Additional Information �C�j)
In addition to this completed application form, (MP-1) the following items below, if applicab e, mus a rhed In order for the application
package lobe complete. Items (a) - (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authodzed work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims fifie to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR. 400 . _o
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name (3ta,. f ayyor,y Phone No.
Address �:a.y f3,, y t, @ COtr - w e_4- 252, 4-2q - 3 S3,T' '
Name W tt i qM. R. JQ e.,n..lN Phone No.
Address r-F 2-13 .tl .- U fr � . k vJ , L), -a r• • Ae--1 Jq 234&'7 -7S7 ' S 4•<i - 3'S$ Z,
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, If applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
1 7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
further certify that the information provided in this application is truthful to the best of my knowledge
Date 19-1 l— 1 1 Print Name ;TOA/I r::: /t,/Mr r�JGhGu�
Signature /ifl, � V;:In�
Please indicate application attachments pertaining to your proposed project.
DOpCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development Received
XDCM MP-4 Structures Information
MAP 19 2020
252-808-2808 :: 1-888-411COAST :: www.nccoastalmanagement.net
Received
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
hPQ 21 2020
DCM-EC
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Other
Channel
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
Breakwater
(excluding
shoreline
NWL
stabilization
Length
1,00
Width
1357.
Avg. Existing
Depth
NA
NA
16
Final Project
Depth
ll
'1 S
NA
NA
,
1. EXCAVATION
a. Amount of material to be excavated from below NHW or in
cubic yards.
`ftF3
c. (i) Does the area to be excavated Include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feel affected.
INrC`CW ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the excavation in these areas:
�pei, O.CCCss
[]This section not applicable
b. Type of material to be
Ot `a-O(
d. High -ground excavation in cubic yards.
Q
12. DISPOSAL OF EXCAVATED MATERIAL El This section not applicable
a. Location of disposal area. pp ee r Dimensions of disposal area.
C t.N,�..y e� � ed" A r.�µ,�.ey t�n � 1(ysrM M•�avJ'r✓ � � � , K S V `
c. (i) Do you claim title to disposal area?
Wes []No [_]NA
(II) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
[:]WL jgJone
(ii) Describe the purpose of disposal in these areas:
d. (i) Will a disposal area be available for future maintenance?
❑Yes $No ❑NA
(ii) If yes, where?
f. (1) Does the disposal include any area in the water?
❑Yes NNo ❑NA
(ii) If yes, how much water area is affected?
252-808.2808 :: 1-888-4RCOAST :: wwwmccoastalmanagement.net revised: 12/26106
Form DCM MP-2 (Excavation and Fill, Page 2 of 2)
Received
APR 21 2020
3. SHORELINE STABILIZATION ❑Ttn�r's j� t' r/�•a licable
(If development is a wood groin, use MP-4 - Structures) V V 'r pp
a. Type of shoreline stabilization: b. Length: {'-(-,
Mulkhead ❑Riprap ❑Breakwater/Sill ❑Other:
c. Average distance watenvard of NHW orcn) a
e. Type of stabilization ` material: 1
0 pcj kk1 -ej f��a l
g. Number of square feet of fill to be placed below water level.
`lkhead backfll%61li Riprap_
Breakwater/Sill � I I 7C) Other
i. Source of fill material.
yPkci v� �i II + $120 s
-t
Width: I
d. Maximum distance watenvard of NHW or NWL:
n T t
f. (1) Has there been shoreline erosion during preceding 12
months?
P5'es ❑No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
r` r0 �✓ y-Ga V
h. Type of fill material.
sad
4. OTHER FILL ACTIVITIESThis section not applicable
(Excluding Shoreline Stabilization) `
a. (i) Will fill material be brought to the site? ❑Yes ❑No DNA b. (1) Will fill material be placed in coastal wetlands/marsh (CW).
If yes,
(ii) Amount of material to be placed in the water
(III) Dimensions of fill area
(iv)' Purpose of fill
5. GENERAL
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
-Ek" ❑SAV _ ❑SB
OWL ❑None
(ii) Describe the purpose of the fill in these areas:
a. How will excavated or fill material be kept on site and erosion b. What type of construction
controlled? backhoe, or hydraulic dre
s; I+ J{t^C-t % 64-tlich-c f Fix ca✓ok-
c. (i) Will navig tional aids be required as a result of the project?
❑Yes Xo DNA
(it) If yes, explain what type and how they will be implemented.
Date
Lf'13-2O
J. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes %No DNA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental Impacts.
f�a] (Jo�v ptr✓�
Applicant Name
C
Project Name j n ( ApplicV Signature
M I G�^�lS �oto� Pry
252-808-2808 :: 1.888.4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06
Form DCM MP-4 APR 21 2020
STRUCTURES D M-EC
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
[]Commercial ❑Public/Government *rivate/Community
c. (i) Dock(s) and/or ier(s
(ii) Number
(Ili) Length
(iv) Width
(v) Floating ❑Yes I%No
e. (1) Are Platforms included? I4Yes []No
If yes:
(it) Number
(ill) Length
(iv) Width
(v) Floating ❑Yes ONO
Note: Roofed areas are calculated from ddpline dimensions.
g. (i) Number of slips proposed
(ii) Number of slips existing
0
L Check the proposed type of siting:
❑ Land cut and access channel
Open water; dredging for basin and/or channel
❑Open water; no dredging required
❑Other; please describe:
k. Typical boat length: I
m. (i) Will the facility have tie pilings?
Oyes []NO
(ii )If number of tie pilings?
❑This section not applicable
b. (1) Will the facility be open to the general public?
❑Yes PJo
d. (!)Are Finger Piers included? ❑Yes 00
If yes:
(ii) Number
(III) Length
(iv) Width
(v) Floating []Yes []No
I. (i) Are Boatlifts included? []Yes *0
If yes:
(it) Number
(iii) Length
(iv) Width
In. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
(Dockage ("wet slips") only, number of slips: 2
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sailpoats, mixed types).
I. (1) Will the facilit be open to the general public?
❑Yes IJi�No
252-808.2808 :: 1-888.4RCOA8T :: www.nccoastaimanagement.net revised: 12/27/06
Form DCM MP-4 (Structures, Page 2 of 4)
Received
APR 21 2020
12. DOCKING FACILITY/MARINA OPERATIONS S section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: _; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge' signs proposed.
(it) Give the location and number of "Pumpout Available" signs proposed.
I. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
252-808.2808 :: 1-888-4RCOAST :: w .nccoastalmanagement.net revised: 12/27/06
Form DCM MP-4 (Structures, Page 3 of 4)
Received
ppg'� 1 1.020
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes [--]No DMEC
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? dV"
[--]Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
p. Is the proposed marina/docking facility located within or Within close proximity to any shellfish leases? [--]Yes ONO
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) 13117his section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑PubliGGovernment ❑Private/Community
(ii) Number
(III) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) XIhis section not applicable
a. (1) Number
(ii) Length
(III) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS C�Ihis section not applicable
a. Is the structure(s):
❑Commercial ❑PubliGGovernment ❑Private/Community
a Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the wring
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
252.808.2808 :: t-888.4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06
Farm DCM MP-4 (Structures, Page 4 of 4)
7. GENERAL
y%xiry of structure(s) to adjacent riparian property lines
15 v
Note: For buoy or mooring piling, use arc of swing including length
ofvessel.
c. Wldth of water body
701
e. (1) Will navigational aids be required as a result of the project?
[]Yes V!No ❑NA
(ii) If yes, explain what type and how they will be implemented.
Aoq 21 2020
40 Proximity of structure(s) to adjacent docki soXM-E C
,�' is s'
d. Water depth at waterward end of structure at NLW o NW
8. OTHER This section not applicable
a. Give complete description:
Date o n
Project Name rr�
C [to, 2 ()aAj �r1 v ✓Q
Applicant.R*e
Applicant Signature
252.808.2808 :: 1-888-4RCOAST :: www.nccoastatmanagement.net revised: 12/27/06
MAJOR PERMIT FEE MATRIX
Applicant: John & Hannah Michals
Selection
Development Type
Fee
DCM %
DWQ %
(14300 1601 435100093 1625 6253)
(24300 1602 435100095 2341)
I. Private, non-commercial
development that does not
$250
100% ($250)
0% ($0)
involve the filling or
excavation of any wetlands
or open water areas:
11. Public or commercial
❑
development that does not
$400
100% ($400)
0% ($0)
involve the filling or
excavation of any wetlands
or o en water areas:
Major Modification to a
$250
100% ($250)
0% ($0)
CAMA Major permit
III. For development that
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A,
B, C, or D below applies:
111(A). Private, non-
❑
commercial development, if
$250
100% ($250)
0% ($0)
General Water Quality
Certification No. 4097 (See
attached can be applied:
1II(B). Public or commercial
❑
development, if General
$400
100% ($400)
0% ($0)
Water Quality Certification
No. 4097 (See attached)
can be applied:
III(C). If General Water
❑
Quality Certification No.
$400
60% ($240)
40% ($160)
4097 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life:
III(D). If General Wa:No.
®
Quality Certification
60%0($240)
40%($160)
4097 (see attached)
P$475
be applied:
IV. For development that
❑
involves the filling and/or
60% ($285)
40% ($190)
excavation of more than
one acre of wetlands and/or
open water areas:
CD
B•
o
CL
O
w
M
p'
7Q
6
M � �
� ni
rO•'
�c
°•g�
moo.
Q
eo
o
$,
fD �
a��
�d•
dy
xo rn
�'y
�w•�
G.
C
N G
G.
y
`<
P.
o
A
`G g'O
p o
o
R
p .•
z o
ga5
,mn
� p
5•��
d'
N
R
m
E
N
R
O�
O
N
O
a
b
6
�•
0
o
5
to
o
C
.�
a
I
5
0
F'
a
W OINI rAO=
o'ao=
OCp1 3 a..
n AZ�oi.'ppc11 �_
i-MZO NAB
�No _
Joy W
moo
Cw
Vaw NW
N �
\\O\4pnngpye
11tlQTy✓
IV
v=e
q 9
0 =
a��
C /C
ATV, piC\,o°
',11'1111111111111
\\
®
a
CDAJ
CD
�•
en
�y
` ,
o
�^
f�
m
0
y yy .yyam yy
z
y
m 9.
� y
a
yE
A
�
tf
Cs a
ro
y �
�
to
m
o
?r Er
2
x
Y
v
b
N
trJ
T
y
'b
O
N p
xi
rn
S
�
�•'
(^CD 0
�
�
P
P
y
�
V�
w
0E-r
20
�.
Q a
O
O tOi w
p
O
Cr' a O
JM
O
%n
bo
0 0 ro
a
0
Ho
n
o
9
O
?.�5'
w
a
a
6'
"SO
6
O N
~
\Q
O
a
m
Oo
A
�
o $
a 1
00
�w
O
O
lD (D
CRR3
rn
a
-n
w
rm
C
F
o
<
<�
\ r
N
W M
z
'
(�
A
r
rl
r
I
'
'
\\\\III IIIIIII
z
_
n
ti m 2 C)
-o C
(®
/
/
' /
1'
0.
``,, O�'�i�
m� :••,.� d1 PRO y��'.
>
�a
` p�
o
�'11
g N
XTYOM
wW
tr"
-ooN oN0 c f'l
O O O
o
r
O
+/
µ
I
/
: �1 Ln r
i 4.
\yn,dm
11
p
`
O \ +/+
fin C`
V'
aO O•
N
-r° N
y r-1
b7
Oi'4 +/ /
,
�� Q
I I
`\
'O _`\ ,••
011N`nitl
x
o N r
/ / /
I II
,''IIIIIIIIIII \I\\\,,
co y
b y
19
I
\
®i i®JB�D►��O��E
m
q0�6 +/�vH//
i�
r
I I I I I I I I I I I I I I
Z
r
C7
/+//
I �1
\
X
D
2ysos9?g?m
m�
KmZ
ZZ
xm y z
'PNCo
B
�aOo
o
9O
m
�Amo�
9ez �
Z�''g
N
l�w
(11
DZ
Fxn5�on
A
€
/
W
o
m C)
01Cn
-3 !4
<`
q�
// /
i
io
D D'
Z
O
O
."I
�0
(� W �'
m
x
!L�i
z'D•
\
11
I
mD� WAMm?
.�'
W
-%-%-x-%
� � MO-
ND OZ
9-'
�
v mtnswN
Y
I'
> Z
oSi! m
Zr
ZN D
I
-Imi°
m oiF:
\ ��' y �I Zm
/
<�A
Inh MO 'Z'2
y 0
O
O
T,
N
1I
I
is
/\
IIW+
i�o-'o r'i�
zz-ri0s!!I�i
D
`ro
.TI D rri
Oo�
L
>
iA >mC:!d
�3
S yHCn Ii,z2'W
���x
N h
0 c
L_
—__
A ��
ey4gp,��,i2m
-F`m
rr^^
O 1 v,
(�
CZ
0�mi O
D
10'���� _ I
M.B.L I
II
A.9 S�ZD'Ay
imi IS1
m2DAmZ OD-Oi
<Mmm iz
�o tyJy�
�Z
0
121.17'TO SET IRON ROD
l
/
z4''^m31'c1�-n
D v5�u c>o
N
p
n
N _ I
85'02'25'
>
��21 ov
z s ��
qP'. yC,
i O
J
m n
N
c,
W t124.16'\
/ D�C2y�ppn zs
gl" z'c'i
0
/
po
N Zcg
m5D090
\ IJy
w N00 ly
Na.V'
D
I
.-p
0,
S
i0
cgc�g'
n XV -o5'
ai mKS mK{-'
Z
N
r'
of
�9
�o..�Z_-
LqO Qc
_ �H s
tJ�
Ogn �..0
8 =m
o
CANAL
...
- - RIPARIAN WNE ® 4. 5' 9EPTH
PROPOSEDD a
RIPARFkNUNE-0�.45
—45
DEPT}I"_
,z ..
d.5''
DREDGE AIA
'..
PROPOSED buIXNE�S
25
....
'
a'
I EYSTNG BWEAD r I�a
. ...—.
35... .-3tos
5 ,.
—.1:5 ....
...
.." -.-.-. '.' a
I .(,.
.a ...'�.',..7YP1C1.TIE,POLE
.'.'.". .'.'.'.-.-.
1
`a
TE PROPOSTID.DILKNEAD _ ----
INTO DOSTIOG BULI HEAD i _-__ - --
I.
4_.
BUJIMW UCH
� �j 'J.i/�f'rt�
..�
a
EA7571/AS y _, 1_
----------------------
NDM
= OUA 01401 GR MET RAMC 8 AMM
lMroN 0pWlM Wff A�
ROMM a r L16YnAL UM owme
BEFORE YOU DIGI
V
COASTAL xeown
WEB
,y + \\ 8. 7'�----�
\+ \
\ \\
\+ \ AREA
LOT \+ \
10 \ \
( \ \
0
A*
GRAPHIC SCALE
0 46-Ao 40
( IN FEET )
Pn rr
la
ILL AREA
s.
d
m
N
LOT
12
Z. Z4 /qq4U (U
CK,..l'- 0
L �
DRAKE ROAD '
VICINITY MAP
Received
L�-
DCM-EC
• SUBJECT PROPERTY: Lot 11. Soal 7, DP,. B..a SPbdl,l
ftf r TowaNiP, W Y[tP& county. NaM CatlFa
• STREET ADDRESS: 2147 Drake Road
Cordlq NO
• PARCEL ID: 087AOWO0110007
• GLOBAL PIN: 9012-90-970
• RECORDED REFERENCE. D.B. 106 PG. 112
• LOT AREA : 15,359 +/- eq. R
• SU&ECT PROPERTY ZONING: SFR (SIN( FAMILY W1ER BANKS REMOTE DISTRICT)
I
pal►_ Iu �I��..
wow m
Major Gamin Plan
John and Hannah b ichals
19aLfm
2147 Dlnb Rod
Lot 11 soak. 7 Cum D"
m
oto
: lK'SIAE 9MMW'aXlE lal
AMAFLw
AND wY 1 (IAflF R-J09.5) AT CY-9A
Received
rz Au /were ANJ mmt a.vamxw� arwEAau
AAO MD POL' RNI R BrGiFO RK UBE x SKI M
ezerasx wrrsx sw� eF F,ar a rEAenm00 av
Al iax FA^LS wAl'rKYWLY, SCUBwRN PIE IR51
� ), 'C'�,
eE xrtxrrr0 AB �wcmw Av ASC AMxMD cwar
f `•1't
rxv vm,mEs are IEwr rqr FAas x uwx
t
1M• g 2U' W W
DCM-EC
e•M7� rw PV101,.
EYffxlEwr 0 8•4. O.a -m
(1 PCn cnvrrrr iE fim
it F4tl rItlBY�t� SIN
eM4_' RY P5,-4
CYEf 0.a A�CYA
1
(15PJ1 Fq% 5/8411'al /xm M81C.1'
a=1 Pro 51nI
08D.a
B"rt 6 rw LLPIMK OFA
5 e "". Inu'F
�IMBA
08E 64e• le' IAYl6Gw rE
w
mn
BiwH U OGaIW, U✓ Al
U IYP.IIX xmN w (:BADE
Re
fWAT
vxwL
--------- ----- If
•�� ---- .ucrxcrFrtwdorx
p P ro
2
DEPTH OF MATERIAL TO BE 1
REMOVED VARIES (1' TO Y)
AVERAGE = 181 -�
r4esrl' nr
DREDGED BOTTOM ENNEAD s[rnro:
4 '(�mPM
is
D�axv. Raemc
OBsreN
1 ik•Tr e.4Y CV�
141• Te ,�
646' M
O
MT 8As rows ro sse• rw ar &Ws
BA1V w/ (z euaN m ere• as ed r M ssrs• rw cxAEa V
ro creN Pseee W %• Du
,wamNr ears
(1�srs• rw cxorx
earn m sa or snAUB
' rw elft�Pxltl AAYI
pMm W FIbI dMr
TYPICAL PIER CROSS SECTION
llm ]O.GM, L
e,>w�
uIi reb• snow uerOB
PILING TO GIRDER CONNECTION
/OPTIONAL RAILING
xmme
BULKHEAD CROSS SECTION
e mr
4Y/YQ :(U
/ C K
IIII ��� ja
II
6, P. `.
we H.n. Odle m
CAMA Details
Par.
John and Hannah b ichals
ua nnte ado
la d &odd 7 Cam awwh
��m
C2