HomeMy WebLinkAbout670002_Plan of Action_20200526. . •
Facility Number: 67 - 2 County: Onslow
Facility Name: Collins Farm
Certified Operator Name: Teresa Collins
Operator # 23273
Current liquid levels) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): 1 2
Spillway (Yes or No): Y ❑ N® Y❑ N® Y❑ N❑ Y❑ N❑ Y❑ N❑ Y❑ N❑
Level (inches): 17 16
2. Check all applicable items
❑ Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
Within acceptable ranges.
®
Liquid level is
within the 25
year 24 hour storm
elevations for one or
more structures.
A 30 day
Plan of Action
is attached.
Agronomic balance
is within acceptable
range.
❑ Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
❑ Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 5/27/2020
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Teresa Collins
Facility Owner/Manager (print)
Hager (signature)
Phone: 910-389-7246
Date: w5 -
PoA Cover Page 2I21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1#1
2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/fO
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
17.0 inches
19.01 inches
2.0 inches
101556 ftZ
126606 gallons
180 days
g. volume of waste produced according to structural design 116329 ft3
h. current herd # F 1500 certified herd #1 1725
actuaI waste produced =current herd # x line g =
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2/21/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
01156 ft3
61600 fe
202902 gallons
1.97 Ibs/1000 gal.
649.1 Ibs, PAN
PoA (30 Day) 2l21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 67-02 #2 Collins
2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
16.0 inches
19.0 inches
3.0 inches
101556 fe
189910 gallons
180 days
g. volume of waste produced according to structural design 116329 ft3
h. current herd # 1725 certified herd # 3520
actual waste produced =current herd # x line g =
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2/14/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
ft3
0 ft3
61600 ft3
147864 gallons
1.33 Ibs/1000 gal.
449.2 lbs. PAN
PoA (30 Day) 2/21/00
II. TOTAL
POUNDS
OF
PAN STORED
WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR, STORM
STORAGE
ELEVATIONS
IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure
ID:
67-02 #2
Collins line m = 449.2
lb
PAN
2.
Structure
ID:
#1
line m = 649.1
lb
PAN
3.
Structure
ID:
line m =
lb
PAN
4.
Structure
ID:
line m =
lb
PAN
5.
Structure
ID:
line m =
lb
PAN
6.
Structure
ID:
line m =
lb
PAN
n.lines1+2+3+4+5+6= 1098.41bPAN
III, TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
DFDinn nn nlnT I IST FIFI ns Tn WHICH PAN CANNOT RF APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
u. application window'
2171
2
Corn
3.50
95.34
333.7
Feb -Jun
3
Corn
2.30
81.05
186.4
Feb -Jun
4
Corn
4.00
100.29
401.2
Feb -Jun
5
Corn
4.70
103.57
486.8
Feb -Jun
6
Corn
5A0
102.18
551.8
Feb -Jun
7
Corn
5.40
91.10
491.9
Feb -Jun
8
Corn
5.80
89.16
517.1
Feb -Jun
9
Corn
5.80
91.71
531.9
Feb -Jun
10
Corn
5.40
88.50
477.9
Feb -Jun
11
Corn
5.40
91.10
491.9
Feb -Jun
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 4470.E lb. PAN
IV, FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1098.4 Ib, PAN
PoA (30 Day) 2/21/00
x.
Crop's
remaining PAN balance
(line v from section III) =
4470.6
lb,
PAN
y.
Overall
PAN balance (w - x) _
-3372
lb,
PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
Landowner has pumped and lagoon no longer in the red. Landowner will continue to pump when feasible.
PoA (30 Day) 2/21/00