HomeMy WebLinkAboutU-3330 (2)
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Raleigh Field Office
Post Office Box 33726
Raleigh, North Carolina 27636-3726
January 30, 2007
€ R'?%? '
2= U
MAR 2 2 2007
Gregory J. Thorpe, Ph.D. DENR - WATER QUALITY
North Carolina Department of Transportation WETLANDS AND ST ORMWArERSRANCH
Project Development and Environmental Analysis
1548 Mail Service Center
Raleigh, North Carolina 27699-1548
Dear Dr. Thorpe:
This letter is in response to your request for comments from the U.S. Fish and Wildlife Service
(Service) on the potential environmental effects of the proposed widening of US 301 Bypass
from SR 1836 (May Drive) to NC 43/48 (Benvenue Road), Nash County, North Carolina (TIP
No. U-3330). These comments provide scoping information in accordance with provisions of
the Fish and Wildlife Coordination Act (16 U.S.C. 66.1-667d) and section 7 of the Endangered
Species Act (ESA) of 1973, as amended (16 U.S.C. 1531-1543).
For road widening projects the Service recommends the following general conservation
measures to avoid or minimize environmental impacts to fish and wildlife resources:
1. Wetland and forest impacts should be avoided and minimized to the maximal extent
practical. Highway shoulder and median widths should be reduced through wetland
areas;
2. Crossings of streams and associated wetland systems should use existing crossings and/or
occur on a bridge structure wherever feasible. Bridges should be long enough to allow
for sufficient wildlife passage along stream corridors. Where bridging is not feasible,
culvert structures that maintain natural water flow and hydraulic regimes without
scouring or impeding fish and wildlife passage should be employed;
3. Bridges and approaches should be designed to;avoid any fill that will result in damming
or constriction of the channel or flood plain. To the extent possible, piers and bents
should be placed outside the bank-full width of the stream. If spanning the flood plain is
not feasible, culverts should be installed in the flood plain portion of the approach to
restore some of the hydrological funcxions of the flood plain and reduce high velocities of
flood waters within the affected area;
4. Bridge designs should include provisions for roadbed and deck drainage to flow through
a vegetated buffer prior to reaching the affected stream. This buffer should be large
enough to alleviate any potential effects from run-off of storm water and pollutants;
4
5. If unavoidable wetland or stream impacts are proposed, a plan for compensatory
mitigation to offset unavoidable impacts should be provided early in the planning
process. Opportunities to protect mitigation areas in perpetuity via conservation
easements, land trusts or by other means should be explored at the outset;
6. Wherever appropriate, construction in sensitive areas should occur outside fish spawning
and migratory bird nesting seasons. In waterways that may serve as travel corridors for
fish, in-water work should be avoided during moratorium periods associated with
migration, spawning and sensitive pre-adult life.stages. The general moratorium period
for anadromous fish is February 15, _ June 30;
7. Best Management Practices (BMP) for Protection of Surface Waters should be
implemented; and
8. Activities within designated riparian buffers should be avoided or minimized.
Section 7(a)(2) of the Endangered Species Act requires that all federal action agencies (or their
designated non-federal representatives), in consultation with the Service, insure that any action
federally authorized, funded, or carried out by such agencies is not likely to jeopardize the
continued existence of any federally-listed threatened or endangered species. A biological
assessment/evaluation may be prepared to fulfill the section 7(a)(2) requirement and will
expedite the consultation process. To assist you, a county-by-county list of federally protected
species known to occur in North Carolina and information on their life histories and habitats can
be found on our web page at http://nc-es.fws.aov/es/countyfr.html .
The federally endangered dwarf wedgemussel (Alasmidonta heterodon) has been observed in
Stony Creek several miles upstream of the project area. In addition, Stony Creek is a tributary to
the Tar River, which supports the federally endangered Tar spinymussel (Elliptio steinstansana).
Though neither of the species is known to occur near the project area, it is prudent that mussel
surveys be conducted in Stony Creek at the project site if suitable habitat exists. Mussel surveys
must extend 100 meters upstream and 400 meters downstream of the project limits.
If you determine that the proposed action may affect (i.e., likely to adversely affect or not likely
to adversely affect) a listed species, you should notify this office with your determination, the
results of your surveys, survey methodologies, an d an analysis of the effects of the action on
listed species, including consideration of direct, indirect, and cumulative effects, before
conducting any activities that might affect the species. If you determine that the proposed action
will have no effect (i.e., no beneficial or adverse, direct or indirect effect) on listed species, then
you are not required to contact our office for concurrence.
We reserve the right to review any federal permits that may be required for this project, at the
public notice stage. Therefore, it is important that resource agency coordination occur early in
the planning process in order to resolve any conflicts that may arise and minimize delays in
project implementation. In addition to the above guidance, we recommend that the
environmental documentation for this project include the following in sufficient detail to
facilitate a thorough review of the action: .
1. A clearly defined and detailed purpose and need for the proposed project, supported by
tabular data, if available, and including a discussion of the project's independent utility;
2. A description of the proposed action with an analysis of all alternatives being considered,
including a "no action" alternative;
3. A description of the fish and wildlife resources, and their habitats, within the project
impact area that may be directly or indirectly affected;
4. The extent and acreage of waters of the U.S., including wetlands, that are to be impacted
by filling, dredging, clearing, ditching, or draining. Acres of wetland impact should be
differentiated by habitat type based on the wetland classification scheme of the National
Wetlands Inventory (NWI). Wetland boundaries should be determined by using the 1987
Corps of Engineers Wetlands Delineation Manual and verified by the U.S. Army Corps
of Engineers;
5. The anticipated environmental impacts, both temporary and permanent, that would be
likely to occur as a direct result of the proposed project. The assessment should also
include the extent to which the proposed project would result in secondary impacts to
natural resources, and how this and similar projects contribute to cumulative adverse
effects;
6. Design features and construction techniques which would be employed to avoid or
minimize impacts to fish and wildlife resources, both direct and indirect, and including
fragmentation and direct loss of habitat;
7. Design features, construction techniques, or any other mitigation measures which would
be employed at wetland crossings and stream channel relocations to avoid or minimize
impacts to waters of the US; and,
8. If unavoidable wetland or stream impacts are proposed, project planning should include a
compensatory mitigation plan for offsetting the unavoidable impacts.
The Service appreciates the opportunity to comment on this project. Please continue to advise us
during the progression of the planning process, including your official determination of the
impacts of this project. If you have any questions regarding our response, please contact Mr.
Gary Jordan at (919) 856-4520, ext. 32.
Sincerely,
r?
- Pete Benjamin
Field Supervisor
cc: William Wescott, USACE, Washington, NC
Travis Wilson, NCWRC, Creedmoor, NC
Chris Militscher, USEPA, Raleigh, NC
Rob Ridings, NCDWQ, Raleigh, NC