Loading...
HomeMy WebLinkAbout20200566 Ver 1_SR 2 Photos_WRC Comment_20200430Ak Vol, A' • �.��i�V:l i4L��1�i� ' Lai Aerial of SR2 from plans. Trees in red rectangle on left side of stream (facing downstream) are mostly on the terrace outside of the work area and will not be removed during construction. See photo below. The single row of trees in the yellow rectangle are primarily on one side of the creek. See other photo below. SR2 facing upstream. Trees on terrace will not be impacted. The sycamore on the right bank will be protected during construction. SR2 facing upstream in the upper incised reach. The plan in this portion of the reach is to raise the existing bed elevation and provide additional bedform diversity. The contractor should be able to work from the left bank in this section to preserve mature vegetation on the right bank. Trees that are stressed or dead will be harvested for use in the project.