HomeMy WebLinkAbout20090842 Ver 1_Triage Comments_20100105Use this form instead of writing inside the folder
Triage Comment Sheet
DWQ# Doi- v4?-
Triaged By:
Reviewer 1
Reviewer 2
Reviewer 3
? Issue Project (Reviewer 1)
Issue c with conditions (11vi
Date:
Date: V
Date:
? Issue Project (Reviewer 2)
1)
Issue with condition (Revie er 2)
? More Information (Reviewer 1)
? Return Application (Reviewer 1)
? Send to Regions (Reviewer 1)
? Send to Regions (Reviewer 2)
? More Information (Reviewer 2)
? Return Application (Reviewer 2)
SATriage FormsMiage Issue Sheet.doe
PLEASE PRINT CLEARLY
09-0842 First Assembly of God take 2
AML Comments
January 5, 2010
1. Please provide full-sized plan sheets of the entire site at a scale of 1" = 50' or
larger.
2. Per the requirements of the Neuse Riparian Buffer Rule, the stormwater that is
discharged from the dry detention basin during the design storm must be
discharged through a correctly designed level spreader. Level spreader design
requirements are set forth in Chapter 8 of the North Carolina Stormwater BMP
Manual, available at: httpa/h2o.enr.state,nc.us/su?`bmp forms htm. Please provide
a Level Spreader Supplement Form for each proposed level spreader, available at
the same web site. Please include the Required Items checklist and all items
listed therein.
3. Please provide plan details for the proposed dry detention basin, including a table
of elevations and incremental storage volumes. Please explain why the storm
intensity decreases from 5.78 to 1.33 in/hr throughout a 60-minute storm duration
as shown on the submitted spreadsheet. Based on the DWQ's calculations, it
appears that that peak flow from the proposed dry detention basin will be much
greater than 1.83 cfs as stated. If that is the case, the system will need to be
redesigned for the appropriate flow rate.
4. Please provide specifications for topsoil and sod in the filter strip downslope of
the proposed level spreader. Please provide watering specifications to establish
the sod.