As Built -Record Drawing review of Alliance
Follow up
Completed
I reviewed the Alliance AB -Record Drawing. I don't have many comments, some are listed below:
1. Please be sure to include the soil temperature probes on the CCPV for the monitoring reports,
2. Will need to watch a few areas of wetland restoration given some of the grading, particularly upper
UT1- R3, and other similar areas.
3. The drone footage was good. I would recommend next time to include the inset map for full flight
after construction as well.
4. Some drone photos at the end of the document were good to see the tributaries coming out of the
headwater wetland. Perhaps more of these in the future.
5. We (DWR) would like to visit the site. It would be good to see now, although I would not withhold
credit release if it cannot be seen until later in the summer or sometime in the fall. We will see if we
can get down there sometime in early May.
DWR recommends releasing the As -Built credit for Alliance.
Thanks,
Mac