Loading...
HomeMy WebLinkAbout20160405 Ver 1_As Built-Record Drawing Review_20200419Strickland, Bev From: Sent: To: Subject: Follow Up Flag: Flag Status: Kim, Todd, Haupt, Mac Sunday, April 19, 2020 2:00 PM Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Wilson, Travis W.; Bowers, Todd As Built -Record Drawing review of Alliance Follow up Completed I reviewed the Alliance AB -Record Drawing. I don't have many comments, some are listed below: 1. Please be sure to include the soil temperature probes on the CCPV for the monitoring reports, 2. Will need to watch a few areas of wetland restoration given some of the grading, particularly upper UT1- R3, and other similar areas. 3. The drone footage was good. I would recommend next time to include the inset map for full flight after construction as well. 4. Some drone photos at the end of the document were good to see the tributaries coming out of the headwater wetland. Perhaps more of these in the future. 5. We (DWR) would like to visit the site. It would be good to see now, although I would not withhold credit release if it cannot be seen until later in the summer or sometime in the fall. We will see if we can get down there sometime in early May. DWR recommends releasing the As -Built credit for Alliance. Thanks, Mac 1