HomeMy WebLinkAbout20160979 Ver 1_SAW-2016-01985 (Revised) As-Built MR_20200324Strickland, Bev
From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Sent: Tuesday, March 24, 2020 8:23 AM
To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B;
Wilson, Travis W.; Bowers, Todd; Merritt, Katie
Subject: [External] SAW-2016-01985 / EBX-Neuse I, LLC / Neu -Con UMBI / (Revised) Poplar
Creek As -Built Monitoring Report
Follow Up Flag: Follow up
Flag Status: Completed
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Good morning IRT,
I hope this email finds all of you doing well! The below referenced REVISED As -Built Monitoring Report review
has been requested by EBX-Neuse I, LLC. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review
follows the streamlined review process, which requires an IRT review period of 15 calendar days from this
email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below,
unless a site visit is requested/scheduled. Please note that an on -site field visit will be (re) scheduled after the
Covid-19 crisis is over and we have all resumed our normal schedules. Comments will be due 15 days after the
site visit has been completed.
At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the
NCIRT along with District Engineer's intent to approve or disapprove this REVISED As -Built Monitoring Report
credit release.
Sponsor:
EBX-Neuse I, LLC
Name:
Neu -Con UMBI / Poplar Creek
USACE ID:
SAW-2016-01985
River Basin:
Neuse
HUC:
03020201
County:
Johnston
CREDIT RELEASE:
15-percent of the total stream restoration and enhancement credits: 588.9 stream mitigation units.
15-Day Comment Start Date: March 24, 2020 15-Day Comment Deadline: TBD (15 days after site visit has been
conducted) 45-Day Credit Release Approval Deadline: TBD (15 days after site visit has been conducted)
Link to Poplar Creek As -Built Monitoring Report can be found on RIBITs, under the As -Built Monitoring Report:
https://urldefense.com/v3/_https://ribits.usace.army.miI/ribits_apex/f?p=107:278:9607254080622::NO:RP,2
78:P278_ BANK _ID:4416_;!!HYmSToo!LfugFEUXmMvfgfE9kenCwOzsGOZREf_QBAuGgSHbP-
AwvgK3vleQNG N_fg8Uysmjkk$
Please select the arrow beside As -Built Monitoring Report to view and/or download the uploaded documents.
If anyone has trouble downloading the documents, I would be happy to send them via email.
Best Regards,
Sam
Samantha Dailey
Regulatory Project Manager
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 22
mailto:Samantha.j.dailey@usace.army.mil