Loading...
HomeMy WebLinkAbout20140189 Ver 1_Mitigation Remediation Plans_20200420Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Monday, April 20, 2020 9:52 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B; Wilson, Travis W.; Bowers, Todd Subject: [External] FW: Arrington Bridge III Adaptive Management Plan Attachments: 2020_ABIII_Adaptive Management Work Completed.pdf Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Good morning, I wanted to pass along the completed AMP for Arrington Bridge III. As indicated in the credit release letter recently sent, there may be additional monitoring and/or withholding of credits if the planting does not improve on -site. Thanks, Sam Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil -----Original Message ----- From: Katie Webber <kwebber@res.us> Sent: Tuesday, April 14, 2020 5:39 PM To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Cc: Bradley Breslow <bbreslow@res.us>; Ryan Medric <rmedric@res.us> Subject: [Non-DoD Source] RE: Arrington Bridge III Adaptive Management Plan Sa m, Hope you are well. 1 Please see the attached work summary on the Arrington Bridge III replanting effort conducted on April 2. If you have any questions please let us know. Thank you, Katie Webber From: Katie Webber Sent: Wednesday, February 12, 2020 4:42 PM To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Cc: Bradley Breslow <bbreslow@res.us>; Ryan Medric <rmedric@res.us>; Jamey Mceachran <jmceachran@res.us> Subject: Arrington Bridge III Adaptive Management Plan Hi Sam, We would like to submit the Arrington Bridge III adaptive management plan for dissemination to the IRT and subsequent review and approval. We hope that upon approval of this document we may anticipate release of Year 4 Monitoring Credits. If you need any additional information, please do not hesitate to reach out to me. Thank you, Katie Webber, LPSS, CPSS Project Manager RES I res.us <Blockedhttp://www.res.us/> Direct: 540.905.4388 1 Cell:410.279.5741 4 "We're moving on March 2nd! Our new office will be located at 3600 Glenwood Avenue, Suite 100, Raleigh, North Carolina 27612. fires April 14, 2020 Sam Dailey USACE — Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 RE: Arrington Bridge III — Year 4 Monitoring Adaptive Management: Work Completed Dear Ms. Dailey, In response to problem areas identified in the Arrington Bridge III Year 4 Monitoring Report and the Year 4 Adaptive Management Plan, RES performed and completed adaptive management work in early April 2020. The work included planting whips and livestakes in the inundated, low stem density areas. Photographs from the effort are included below (Figures 1 & 2). More information about the work is detailed in the Adaptive Management Plan submitted on February 11, 2020, and accounted below: Planting Date: April 2, 2020 Method: Stick Planting and Livestaking Planting Area: +/- 7.10 acres Stems/Acre: 380 Species Type Size ft Amount Bald cypress Whip 4 750 Water tupelo Bareroot 2 150 Green ash Whip 4 500 Black willow Livestake 3 750 Buttonbush Livestake 3 500 Black willow Pole 6 50 Whip Total 1,400 Livestake/Pole Total 1,300 Grand Total 2,700 res. us 0 Figure 1. RES planting pole black willow at Arrington Bridge 111. Figure 2. After stick planting and livestaking at Arrington Bridge lll. A map displaying the locations of the planting is attached. Thank you, �A/&� Ryan Medric I Ecologist I 760 trees a �I 380 trees c:3 TR , 60 trees fires N W E s( S I 0 175 350 Feet r 1 inch = 350 feet r� Arrington Bridge III Mitigation Project :p 2020 Planting Map Plant 6 ft willows 210 trees in this deep water area eo A a � r 520 trees 67 trees i 140 trees ,7 �7 x�. 4W 400 trees I x - '.14.+ t h Date: 4/14/2020 Drawn by: RTM Let: 35.347869 Long:-78.0161738 LEGEND O Conservation Easement (54.86 ac) O Replant Area (7.10 ac) Vegetation Plot (MY3) >320 stems/acre <320 stems/acre