HomeMy WebLinkAbout20120064 Ver 1_field notes - Apr 19 2017 - 3-54 PM_20200420Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Monday, April 20, 2020 2:45 PM
To: Davis, Erin B
Subject: [External] Crooked Creek notes
Attachments: Crooked Creek 2 field notes - Apr 19 2017 - 3-54 PM.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
My chicken scratch for your records
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG (r)
*NOTE: I am currently teleworking and away from my office. Please contact me via email or at 919.413.6392.
1
Su�ri�
3� �rXkeJ caekt Mitigation Monitoring Review Checklist
Project/Site Name:
Review Meetinn rodd-T f�►
Notes from review meeting: 1�'Y f r�! CO
�T•r P�
MAC - 14.
—JD dahe.�� Zo!(
9or1!j 6 it, rephlh7461
ne�rf tar- . rewdJA
Co4S�;rucfi 0414II&A, IS dry 101 groll"41
-- Tr. i-
^ flat' alga had, Sower hYkic ivtidiCa �N� a
tfk a vVima 3 (FA) °C) or a �(o�
Yrot►lylaravl) pllo �,.4ts 'N � C1•�
Date of
soft (; 6worwa. 2 .
La l� w� Voiunfew Orem ash,
142(l-51) wrf 60 redmc.wrolA roofs
Chronva. q. (I'kil'OuLd (.r�aafi'�.. aoo )
UV4-01 WS /ook I , j, -
" UXA - soil g worQ Gdo q fO 66aina
`% d;C(Ovrs Ire4&AA--
4t Mi I-
�irl
piL - crC bwml *ees dka,%& UT
Preliminary Determination
❑ Site Visit/Additional Data Required ❑ Full Credit Release Approved ❑ Partial Credit Release Approved
❑ Additional Monitoring/Corrective Measures Required
Contingencies/Follow-up Actions:
Mitigation Credit Summary: (credits for release):
Stream Credits
Warm Cool Cold
Total Potential Credits "�Y �,
Prior Released Credits 3 jtf,� .
Current Request 35 �.47w
Credits Approved
S I-rE w rF-
Wetland Credits
Riverine Mm.irian Non-riverine
Coastal
USACE Project Manager Name/Signature Date of Signature
This form is not valid unless signed by the USACE Project Manager. This form is used to document office and field findings
during the monitoring review of USACE-approved mitigation sites. This form does not apply to isolated wetland credits,
buffer credits, or nutrient offsets as approved by NCDWQ. For questions regarding this form or any of the conditions of the
permit authorization, contact the USACE Project Manager shown above.
, h ydr�c
enters
Page 2 of 2
Form Updated 20 April 2015
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
ion Project Monitoring Review Checklist
Pro'ect Information
Project/Site Name: Crooked Creek #2 Mitigation Site Action ID: SAW-2011-02201
Monitoring Year: Year 1 NCDWR Project Number:
Provider/Designer: Wildlands Engineering NCEEP Project Number (if applicable): 94687
Mitigation Type: NCEEP Stream and Wetland Site HUC and Basin: 03040105, Yadkin River Basin
Site Coordinates: 35.13739 ON -80.5227 °W County: Union
Proiect Review Checklist
If a concern is noted during the office or field review, check the box and provide detail in the appropriate section below.
General Site Issues:
❑
Vegetation concerns (species composition, vigor, stem density, etc.): 0 h,. 4 1 a r- S!_5r r ink
❑
Beaver issues (management plan?):
❑
Excessive soil manipulation (compaction, fertility, etc.):
❑
Invasive/exotic species concerns: J06�qiv4 " x (o _ we, r vCf prfl r,` fct'
.epr)
❑
Crossings or utility line impacts: aitA'I�L �3% -a<faW )� PrV' 01 I n +� _
❑
BMP implementation and locations (if proposed):
❑
Fencing missing or inadequate:
❑
Evidence of encroachment (livestock, easement clearing, etc.):
❑
Upstream/downstream or adjacent property owner concerns:
❑
Conservation easement concerns:
❑
Easement marking/signage concerns: _
S12.dortS
Stream Issues
�'' � i��r I G -CL
❑
Stream buffer issues (width, cornpositio.,, �cr r._it) o f r ; ,
❑
Channel stability issues (aggrading or degrad-Ing, revetments, grade control?):
❑
Substrate concerns (scour, particle size, embeddedness, habitat, excess sediment):
❑
Channel hydrology (flow, jurisdiction):_----
[-] Other:
Wetland Issues: N/A
❑ Groundwater monitoring well location/placement concern _ 7
}
Hydro period concerns (too dry or too vet)
❑ Hydric soil indicator and/or soil type concern_:-__-
❑ Onsite/adjacent ditch drainage concerns:
n nthar•
Office Review:
Notes from office review:
� � � ' �✓ lf"..'t" i
3 9 aG af- i o"'
Date of office review: