HomeMy WebLinkAbout20200699 Ver 1_401 Application_20200527DWR
mrlslon of Water Resources
Pre -Construction Notification (PCN) Form
April 11, 2020 Ver 3.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6 Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned * Version#*
20200699 1
Is a payment required for this project?*
r No payment required What amout is owed?*
r Fee received 6 $240.00
6 Fee needed - send electronic notification r $570.00
Reviewing Office *
Winston-Salem Regional Office - (336) 776- Select Project Reviewer*
9800 Dave Wanucha:eads\djwanucha
Information for Initial Review
1a. Name of project:
Broad Street Culvert Replacement
1a. Who is the Primary Contact?*
Randal Howard
1b. Primary Contact Email:*
rhovvard@sungatedesign.com
Date Submitted
5/27/2020
Nearest Body of Water
UT to Tanbark Branch
Basin
Cape Fear
Water Classification
WS-V, NSW
Site Coordinates
1c. Primary Contact Phone:*
(919)710-8462
Latitude:
Longitude:
35.916099
-79.068704
A. Processing Information
County (or Counties) where the project is located:
Orange
Is this a NCDMS Project
r Yes IT No
Is this project a public transportation project?*
c Yes r No
Is this a NCDOT Project?*
r Yes IT No
1a. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number: 14 - Linear transportation
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r Individual Permit
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR401 Certification:
For the record only for Corps Permit:
F- 401 Water Quality Certification - E)press
W Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
O Yes r No
B. Applicant Information
1d. Who is applying for the permit?
r Owner W Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Town of Carrboro
2b. Deed book and page no.:
N/A
2c. Responsible party:
Randy Dodd, Town of Carrboro Stormwater Utility Manager
2d.Address
Street Address
100 Public Works Drive
Address Line 2
City
Carrboro
Postal / Zip Code
27510
2e. Telephone Number:
(919)918-7341
2g. Email Address:*
State/ Province/ Fbgion
NC
Country
USA
2f. Fax Number:
r Yes r No
r Yes r No
rdodd@townofcarrboro.org
3. Applicant Information (if different from owner)
3a. Name:
Randal Howard
3b. Business Name:
Sungate Design Group, PA
3c.Address
Street Address
905 Jones Franklin Rd.
Address Line 2
city
Raleigh
Postal / Zip Code
27606
3d. Telephone Number:
(919)710-8462
3f. Email Address:*
rhovvard@sungatedesign.com
State / Rmince / region
NC
Country
USA
3e. Fax Number:
C. Project Information and Prior Project History O
[Project Information
1b. Subdivision name:
(d appropriate)
1c. Nearest municipality/ town:
Carrboro, NC
project Identification
2a. Property Identification Number:
N/A
2c. Project Address
Street Address
Broad St
Address Une 2
City
Carrboro
Postal / Zip Code
27510
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
UT to Tanbark Branch
3b. Water Resources Classification of nearest receiving water:*
WS-V, NSW
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300020603
4. Project Description and History
2b. Property size:
N/A
State / Rmince / region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Broad Street is a 10' wide public gravel road in the Town of Carrboro, NC. The epsting land use is residential. An unnamed tributary to Tanbark Branch (aka Tanyard Branch) drains
under Broad Street through an epsting 24" culvert. Roadway overtopping of stormwater at this location is a known and documented issue. The Town of Carrboro proposes to replace
the epsting 24" culvert under Broad Street with a 54" culvert.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
USGS NC Chapel Hill _20190805_TM_geo_reduced.pdf
19.38MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
NRCS Orange Cc Soil Map 30.pdf 5.16MB
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
78
4h. Explain the purpose of the proposed project:*
The purpose of this project is to replace and existing, undersized 24" culvert in poor condition with a properly sized 54" culvert.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The project proposes to replace the existing 24" culvert with a 54" culvert using standard construction equipment including, backhoe, bulldozer, and excavator. A temporary detour will
be used to maintain access to residential properties during construction. Stream flow will be maintained during construction using a temporary stream crossing. The proposed culvert will
be constructed adjacent to the existing culvert using standard open -cut trenching. A new headwall and inlet channel with rock cross vane will be constructed as part of the project. 2:1
roadway embankment slopes will be used to minimize impacts. An erosion control permit is not required for this project, however an erosion control plan is included using standard
erosion control practices. A reforestation plan for replanting of existing forested areas within clearing limits is also included as part of the project
4j. Please upload project drawings for the proposed project.
BROAD ST_Plan_60pct Const Plan_20200518.pdf 14.08MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No r Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity?
No.
D. Proposed Impacts Inventory u
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
r Wetlands W Streams -tributaries W Buffers
r Open Waters r Pond Construction
3. Stream Impacts
3a. Reason for impact (?)
3b.lmpact type *
3c. Type of impact*
3d. S. name*
3e. Stream Type*
Type of
3gSwidth *
3h. ImpactM
❑
�[3f.
urisdiction*
length*
S1
Road Crossing
9
Permanent
Culvert
Ui to Tanbark Branch
Intermittent
Both
4
18
Average (feet)
(linearfeet)
S2
Road Crossing
9
Permanent
Relocation
UT to Tanbark Branch
Intermittent
Both
4
46
Average (feet)
(liriearfeet)
S3
Road Crossing
9
Tem orar
p y
Culvert
UT to Tanbark Branch
Intermittent
Both
4
8
Average (feet)
(lin�rfeet)
Crossing ITemporary IlRelocation JUT to Tanbark Branch
Average (feet) 11 (linearfeet)
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
64 14
3i. Total stream and ditch impacts:
78
3j. Comments:
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
C Neuse r Tar -Pamlico
C Catawba r Randleman
C Goose Creek P7 Jordan Lake
C- Other
6b. Impact Type
6c. Per or Temp
6d. Stream name
6e. Buffer mitigation required?
6f. Zone 1 impact
6g. Zone 2 impact
Road Crossing - Excavation
P
Ui to Tanbark Branch
No
1,381
562
Road Crossing - Fill
P
Ui to Tanbark Branch
No
528
0
Road Crossing - Erosion Control
T
LIT to Tanbark Branch
No
1,617
696
Detour - Temporary Fill
T
LIT to Tanbark Branch
No
108
0
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 1,725.00 696.00
Zone 1
Zone 2
Total Permanent impacts: 1,909.00
562.00
Zone 1
Zone 2
Total combined buffer impacts: 3,634.00
1,258.00
6i. Comments:
Supporting Documentation
Broad St Buf_SW Premit Drawings_20200527.pdf 540.83KB
E. Impact Justification and Mitigation U
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Avoidance and minimization design measures include 2:1 embankments, headwall, erosion control, and reforestation.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Avoidance and minimization construction techniques include standard erosion control practices such as, temporary silt fence, ground stabilization
guidelines, wattles and rock checks in ditches, and tree protection. EAsting flow pattern will be maintained during construction using a temporary
detour and stream crossing.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
The proposed road crossing impacts are within the limits of allowable impacts.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) u
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
What type of SCM are you providing?
r Level Spreader
r Vegetated Conveyance (lower SHWT)
r Wetland Swale (higher SMNT)
r Other SCM that removes minimum 30 % nitrogen
W Proposed project will not create concentrated stormwater flow through the buffer
Diffuse Flow Documentation
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
r Yes r No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater
program?
r Yes r No
r N/A- project disturbs < 1 acre
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)? *
r Yes r No
Comments:
No state funding, less than 10 acres disturbed.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
Culvert replacement only. No improvement to the capacity of the transportation facility.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5d. Is another Federal agency involved?*
r Yes r No f Unknown
5e. Is this a DOT project located within Division's 1-87
r Yes r No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS GIS data
Consultation Documentation Upload
USFWS Critical Habitat Map.pdf 137.81 KB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
USFWS GIS Data
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCDNCR GIS data
7c. Historic or Prehistoric Information Upload
NCDNCR Map. pdf 409.73KB
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r Yes r No
8c. What source(s) did you use to make the floodplain determination?*
NC FRIS Online Map
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
DFIRM_NC_3710977800K.pdf 4.56MB
Signature
*
W By checking the box and signing below, I certify that
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Randal C. Howard
Signature
16
v
Date
5/27/2020