Loading...
HomeMy WebLinkAbout20130739 Ver 1_RE Credit Release SAW-2008-02655_20200427Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Monday, April 27, 2020 10:38 AM To: Dow, Jeremiah J; Haupt, Mac Cc: Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B Subject: [External] RE: St Clair Credit Release SAW-2008-02655 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Hi Jeremiah We are requiring an additional year of monitoring, beyond MY7. We would like to visit the site in 2021. So, yes, MY8 will be required. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) *NOTE: I am currently teleworking and away from my office. Please contact me via email or at 919.413.6392. -----Original Message ----- From: Dow, Jeremiah J <jeremiah.dow@ncdenr.gov> Sent: Monday, April 27, 2020 10:00 AM To: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov> Subject: [Non-DoD Source] RE: [External] St Clair Credit Release SAW-2008-02655 Kim / Mac, The email below reads as if you are requiring an additional year of monitoring for St. Clair. This isn't requiring an additional year beyond MY7 is it (at this point)? They are conducting monitoring for MY7 now. There has been some confusion here at DMS as to what is being required. If an additional year (MY8) is required, I assume that would be decided at the closeout site visit in 2021? Thank you, Jeremiah Dow NC DEQ Division of Mitigation Services 217 West Jones St. Raleigh, NC 27699-1652 1 (919) 707-8280 office (919) 218-0226 cell Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Hi Melonie After reviewing the planting season data from Scott King, the IRT discussed St. Clair and the information provided supports what's in the mitigation plan. We agree with the 5% SMU credit release (163.7) for this year, plus the 10% (327.4) SMU from last year. We agree with the 5% WMU credit release (0.140) for this year. We will require an additional year of monitoring on the wetlands, streams, and vegetation, and will add this to the list of sites to visit next year (2021). Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) *NOTE: I am currently teleworking and away from my office. Please contact me via email or at 919.413.6392.