HomeMy WebLinkAbout20171157 Ver 1_Initial Credit Release SAW-2017-01570_20200522Strickland, Bev
From:
Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent:
Friday, May 22, 2020 8:30 AM
To:
Baumgartner, Tim
Cc:
Tugwell, Todd J CIV USARMY CESAW (US); Haupt, Mac; Davis, Erin B; Bowers, Todd;
Merritt, Katie; Byron Hamstead (byron_hamstead@fws.gov); Steve Kichefski; Brown,
David W CIV USARMY CESAW (USA); Jones, M Scott (Scott) CIV USARMY CESAW
(USA); McLendon, C S CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY
CESAW (USA); Wiesner, Paul; Reid, Matthew; Jake McLean; Shawn Wilkerson
Subject:
[External] Notice of Initial Credit Release/ NCDMS Shake Rag Branch Mitigation Site/
SAW-2017-01570/ Madison Co.
Attachments:
Shake Rag Branch_100018_FB 05_STR_Initial Release signed.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning,
The 15-Day Record Drawing review for the Shake Rag Branch Mitigation Site (SAW-2017-01570) ended May 21, 2020.
Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments
received from the NCIRT are incorporated in this email. Please address IRT concerns in the MY1 Report. There were no
objections to issuing the initial credit release. Please find attached the current signed ledger.
EPA Comments, Todd Bowers:
I have done an extensive overview of the Shake Rag Branch As -Built report (MYO) and at this time I have no serious
concerns or comments but a few inquiries. I noted the differences in approach for the various reaches and shifts in work
performed based on actual site conditions encountered and they seem mostly very minor. The planting plan was
adjusted satisfactorily with the inclusion of proper species to replace those unavailable. I appreciated the statement
"Supplemental plantings and volunteer plants must be present for at least two growing seasons before counting toward
performance standards for monitoring years five and seven" in order to remove any ambiguity in later MY reports. As far
as random veg plots are concerned, I am curious how Wildlands determines which to use between the rectangular and
circular plots. I am also wondering what species was used to replace elderberry live stakes that were not planted in the
riparian corridor.
DWR Comments. Erin Davis:
DWR appreciates the inclusion of the construction field adjustments explanations. However, DWR doesn't believe that
"lack of material" is a valid justification to not install structures that were included in the approved mitigation plan
design. There is the option to bring in material from an offsite source to complete construction as designed to provide
in -stream habitat and bank stabilization. And while it's understood that field changes may occur once under
construction, a concerted effort should be made to evaluate whether or not to disturb bank sections to install
stabilization or habitat structures during the design stage, since these improvements are considered when evaluating
the functional uplift in support of appropriate approaches and credit ratios.
Please contact the mitigation office if you have any questions.
Thanks and Happy Memorial Day,
Kim
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG
Mitigation Project Name Shake Rag Branch USACE Action ID 2017-01570
DMS ID 100018 DWR Permit 2017-1157
River Basin French Broad Date Project Instituted 5/17/2017
Cataloging Unit 06010105 Date Prepared 4/27/2020
County Madison Stream/Wet. Service Area French Broad 06010105
BROWNING.KIMBERLY. Digitally signed by
BROWN I NG.KIMBERLY.DANIELLE.1527683510
DANIELLE.1527683510 Date: 2020.05.22 08:28:27 -04'00'
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the
NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Cold Stream Credits
Project Credits
Scheduled
Releases %
Proposed
Releases %
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
1,996.680
0.000
1,996.680
2020
4/27/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.00%
2022
5 - Year 3 Monitoring
10.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
10.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
10.00%
Totals
1,996.680
Total Gross Credits
6,655.600
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,996.680
Total Percentage Released
30.00%
Remaining Unreleased Credits
4,658.920
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Cold Stream
Restoration
4,986.000
Cold Stream
Enhancement I
663.000
Cold Stream
Enhancement II
2,884.000
Cold Stream
Preservation
740.000
Page 1 of 2
Mitigation Project Name
Shake Rag Branch
DMS ID
100018
River Basin
French Broad
Cataloging Unit
06010105
County
Madison
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
2017-01570
2017-1157
5/17/2017
4/27/2020
French Broad 06010105
Stream
Stream
Restoration
Debits
Restoration
Equivalent
Credits
Credits
Beginning Balance (mitigation credits)
6,581.600
74.000
Released Credits
0.000
0.000
Unrealized Credits
0.000
0.000
DCM Permit
Owning Program
Req. Id
TIP #
Project Name
USACE Permit #
DWR Permit #
NC DOT Stream &
Bridges 28 & 29 on
Wetland ILF
REQ-005374
B-4183
2011-00417
260.000
Program
SR 1526
NC DOT Stream &
Bridge 148 on SR
Wetland ILF
REQ-005490
B+4989
1325 over Lamance
2008-01334
53.000
Program
Creek
NC DOT Stream &
SR 1344
Wetland ILF
REQ-005681
Improvements -
2012-01775
83.880
Program
Division 14
NC DOT Stream &
Bridge 246 on SR
Wetland ILF
REQ-005927
B-4182
2012-01773
134.000
Program
1503
NC DOT Stream &
US 19
2007-02197-300
Wetland ILF
REQ-005929
R-2518A
2007-1134
1,443.600
Improvements
2007-02197-357
Program
NC DOT Stream &
A-0010C A
Wetland ILF
REQ-007237
US 19 / 23 Widening
1995-05135
1996-0470
22.200
Program
0010D
Total Credits Debited
1,974.480
22.200
Remaining Available Credits (Released credits)
0.000
0.000
Remaining balances (Unreleased credits)
4,607.120
51.800
Page 2 of 2