Loading...
HomeMy WebLinkAboutSW8940822_Compliance Evaluation Inspection_20200521Weaver, Cameron To: Zak Pierce Subject: RE: [External] Fort Fisher Historic Site Hi Zak. Yes, I have the Ft. Fisher State Stormwater file in my office. This file is not big at all. A faster way for this to occur is for you to pay for a full copy of the file made at Allways Graphics and sent to you at a cost of $35. Or we can set up an appointment for you to review the file. Let me know your availability. Cameron Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver0 ncdenr.eov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality nas adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offces, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this chailenging time. From: Zak Pierce <zpierce@cihdesignpa.com> Sent: Thursday, May 21, 2020 10:32 AM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Mary H. Russo <MRusso@ClarkNexsen.com>; Trent Rogers <TRogers@ClarkNexsen.com>; Christopher T. Aebel <ctaebel@clarknexsen.com>; Saeideh Teymouri <STeymouri@clhdesignpa.com> Subject: RE: [External] Fort Fisher Historic Site Morning Cameron. Just checking in to sce if the files have been located. If not, can we please set up a quick conference call with you, Clark Nexsen (Civil on the project) and CLH design? Let us know if you have some availability early next week. Thanks! Zak Zak Pierce, ASLA, PLA, LEED AP Vice President CILIA design; p.a. Collaborative Landscape Architecture and Civil Engineering 400 Regency sorest Drive, Suite 1 0 Cary, NC 27518 919.319.6716, ext. 4025 Witter [gcc0l.safelinks.protgction.outlook.coml I Linkedln [Rcc0l.safelinks.protection.outlook.com1 I Faceocok [gccOl.safelinks.protection.outlook.coml I Instagram [gcc0l.safelinks.protection.cutlook.coml I clhdesign�)a.com [gccOl.safelinks.protection.outlook.coml From: Weaver, Cameron <cameron.weaver@ncdenr.gov> Sent: Thursday, May 7, 2020 11:04 AM To: Zak Pierce <zpierce clhdesignpa.com> Subject: RE: [External] Fort Fisher Historic Site I am not sure at this point. And i don't think the file of interest has been located yet, unfortunately. I will check into that today and tomorrow. Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Zak Pierce <zpierce@clhdesignpa.com> Sent: Thursday, May 7, 2020 10:43 AM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Cc: Trent Rogers <TRoge�s@ClarkNexsen.com>; Mary H. Russo <MRusso @ClarkNexsen.com>; Saeideh Teymouri <STevmouri@clhdesignpa.com>; Christopher T. Aebel <ctaebel@clarknexsen.com> Subject: RE: [External] Fort Fisher Historic Site • vernal emal. Do rkm ckk links or o verify. Send Good Morning Cameron. Do you anticipate returning to the office on Monday, May 11"'? Zak Pierce, ASLA, PLA, LLEC AP /ice ?res ac It CLH design, p-a Cc `?ccorativ: ' Lin: lscajc4; , > `_c*a„F c=7.1 Civii Engineering 4CO Reg--rcy r'p)re:t CAv—m, SJtz 1'0 -Ire;, 51S.319.G71 G. ; . 4 G 2 5 Twit -ter [eccOl.safelinks.protection.outlook.coml I Linkgdin [Fcc0l.safelinks.protection.outlook.com1 I Facebogk [gccOl.safelinks.protection.outlook.ccm; I(ems+. r : [gccOl.safelinks.protection.c-utlocl;.coml I R-ifI�Llg; L:.;om 'gcc0l.safelinks.p= otection.outiook.ccm? From: Weaver, Cameron <cat-.ieron.i,veavor@ncdenr.eov> Sent: Thursday, April 23, 2020 3:50 PM To: Zak Pierce <zpierce@clhdesienpa.com> Subject: RE: [External] Fort Fisher Historic Site Hi Zak The physical file has been misfiled somewhere in the office and until I can track it down, I can't set up a file review time for you by appointment, which is the only way you can get in the office through at least May 8 now. I have put the word out and will do my best to track it down for you. Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 'Based en the current guidance to rninin-:?za the spread of COVID-19, the Department of Environmental Qualit,.t has adlusted operations to protect the hedth and safet+, of t:�e staff and public. Many employees are Irking remotely or areon staggered shifts. To accom ricdate these staffing changes, a l DEQ office locat;ans are limiting public access to appointmFnts only. ?.ease check witn the a proprate staff before vis irg .gar offices, as we mz:y be able to handle ycur requests by phone or email. We apprec`ate your patience as we con vinue tc serve the ;:ab is during this challeng ng time. From: Zak Pierce <zpierce0cihdesisn2a.ccm> Sent: Thursday, April 23, 202010:49 AM To: Weaver, Cameron <.-as-i:-on.weaver@ncdenr.eov> Cc: Mary H. Russo <MRussoC�Cla:-I<Nexspr..com>; Saeideh Teymouri <ST,ymouri@clhwesigr:pa.co:r.>; Trent Rogers <TRogers@ClarkNexsen.com>; ChristopherT. Aebel <ctaebel@clarknexsen.com> Subject: RE: [External] Fort Fisher Historic Site Hi Cameron, Thank you so much for the attached permit information. We're very interested in seeing any plans or maps that would show the 68 acre project area. Can you please keep us posted when you may be able to pull the plans? Thank you 1 Zak Zak Pierce, ASLA, PLA, LEED AP Vice President ;XH des gr,, p.a. Collaborative Landscape A; chitec�- ure cnf-i Civil Er: yineeri;?g 400 Regency Forest Drive, SJte 120 Cary, NC 27518 919.319.6716, ext. 4025 Twitter[Rcc0l.safeiinks.protection.outlook.comI I L nkedln fgccOl.safelinks.protection.outlook.coml I Facebook fgcc0l.safelinks.protection.outlook.coml I Instagram feccol.safelinks.protection.outlook.coml I dndesisnpa.com fecc0l.safelinks.protection.outlook.comt From: Weaver, Cameron <cameron.weaver@ncdenr.gov> Sent: Friday, April 3, 2020 3:35 PM To: Zak Pierce <zpierce clhdesignpa.com> Subject: RE: [External] Fort Fisher Historic Site Hi Zak Currently our office is closed to the public through at least April 30; staff are working remotely and logging into office files. I was able to look up on RIMS and found 2 permits that you should review that are attached here. I am sorry that I cannot provide access to the entire files at this time. Let me know of other ways I may assist. Cameron Cameron Weaver Environmental Assistance Coordinator NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina PublicAp Records Law and may be disclosed to third parties. From: Zak Pierce <zpierce@clhdesi9np3.com> Sent: Friday, April 3, 2020 2:57 PM To: Weaver, Cameron <cameron.�,vc-aver@^cdenr.eov> Cc: Mary H. Russo <MRusso @ClarkNexsen.com>; Saeideh Teymouri <STeymouri@clhdesignpa.com>; Trent Rogers <TRoeersaClarkNexsen.com>; ChristopherT. Aebel <ctaek:elciciarknexsen.com> Subject: [External] Fort Fisher Historic Sitecvi �CA iSTI�Td: .. Hi Cameron, Hope you are doing well. We have another project down your way that we'd like to review with you. I believe you met about this project already with a few folks on this email thread. We are working on a new visitors center for the Fort Fisher Historic Site. I understand there is an existing stormwater permit for this site. Pre -virus times, we'd come down to your office to review the existing permit. How are these types of meetings handled nowadays? We are interested in seeing the details of the permit as this will inform how we need to handle stormwater for the new visitors center and reconfigured parking lot. Any help would be greatly appreciated. Thanks! Zak Zak Pierce, ASLA, PLA, LEED AP Vice President Collaborative Landscape Architecture and Civil Engineering 400 Regency Forest Drive, Suite 120 Cary, NC 27518 919.319.6716, ext. 4025 Twitterltwitter.coml I Linkedin flinkedin.coml I Facebook ffacebock.coml I Instagram finstagrarrl.coml I clhdesignpa.com fcihdesignpa.coml col.:de.- 4ie r.-oirrr m..:::�cr,:. F...i : i E-mail Confidentiality Notice: The information contained in this transmission is confidential and may be subject to protection under the law. The message is intended for the sole use of the individual or entity to whom it is addressed. If you are not the intended recipient, you are noted that any use, distribution or copying of the message is strictly prohibited. If you received this transmission in error, please contact the sender immediately by replying to this e-mail and delete the material from any computer. North Carolina Department of Environmental Quality SCOPING MEETING REQUEST Please complete all the information below. Call and email the appropriate coordinator with the completed ibmaL E C E ! V E • Asheville Region -Alison Davidson 828-296-4698; alison.davidson(aD-ncdenrgov • Fayetteville and Raleigh Regions - David Lee 919-7914204, david.lee0ricdenr.pov JUL Q 2019 • Mooresville and Winston-Salem Regions — VACANT • Washington Region - Lyn Hardison 252-948-3842; lyn.hardisonOncdenr.pov BY,` • Wilmington Region -Cameron Weaver 910-796-7303; cameron.weaver(pncdenr..cov Project Name: Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park County: New Hanover Applicant: Tony Romaine Company: NCDNCR Address: 109 East Jones Street City: Raleigh State: NC Zip: 27601 Phone: 919.807.7474 F Email: tony.romaine(cDncdcr.gov Physical Location of Project: 1610 Fort Fisher Blvd S, Kure Beach, NC 28449 Engineer/Consultaht: Josh Hurst, PE Company: Clark Nexsen Address: 333 Fayetteville St, Suite 1000 City: Raleigh State: NC Zip: 27601 Phone: 919.576.2120 Fax: Email: _ihurst .clarknexsen.com Please provide a DETAILED project narrative, pdf site plan and a vicinity map with road names along with this Request form. The project narrative should include the following when available: Existing Conditions- List of existing permits, previous project name(s) or owner name(s), existing compliance or pollution incidents, current conditions or development on site, size of tract, streams or wetlands on site*, stream name and classification, historical significance of property, seasonal high water table elevation, riparian buffers, areas of environmental concern, setbacks Proposed- Full scope of project with development phase plan, acreage to be disturbed, wetlands to be disturbed, waste treatment & water supply proposed, soils report availability, % impervious surface, stormwater treatment and number of bmps, public or private funding. *Relative To Wetlands — Federal and coastal wetlands must be delineated by a US Army Corps Regulatory Official, Coastal Management Field Rep or a qualified environmental consultant prior to undertaking work such as filling, excavating or land clearing. The delineations must be approved by the US Army Corps of Engineers (USACE) and/or the Division of Coastal Management. Wetland delineations are valid for a period not to exceed five years from date of USACE approval. Please provide estimated investment & expected employment numbers: $ 22 million 12 Jobs For the scoping meeting, it is best to provide a list of questions and topics of concern. It is helpful to know what you hope to gain from the meeting. Please have thoughts and presentations organized as much as possible to make the best use of time. Agencies Involved: Check all agencies that may be involved with project: ❑ Marine Fisheries ❑ National Marine Fisheries ❑ U.S. Fish & Wildlife ❑ NC Wildlife Resources ❑ Coastal Management ® Land Resources ❑ Stormwater ❑Erosion Control) ® U.S. Army Corps of Engineers ❑ Shellfish Sanitation ®Water Resources: (❑ 401/buffer ❑ NPDES ❑ Non -discharge ❑ Public Water Supply) ❑ Air Quality ❑ Solid Waste ❑ UST ❑ Hazardous Waste ® Other New Hanover County ❑ ® Othe �KfliOcea�Termi�nalSunn Point ❑ ❑ Other NCDEQ Scoping Meeting March 2016 Other Other g5C!DQ \'n,g ANAO'`"`y Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park Project Narrative July 5, 2019 Existing Conditions The project site currently has a visitor center and historic fort remnants from Fort Fisher, and contains the NCDNCR Underwater Archaeology Branch facilities. Most of the project site is owned by the State of North Carolina, with the remainder owned by the United States Government as the MOTSU "Sunny Point Buffer". The project site is historically significant from the Civil War era. According to www.historicsites.nc.gov, during the Civil War, Fort Fisher kept the "... port of Wilmington open to blockade-runners supplying necessary goods to Confederate armies inland. By 1865, the supply line through Wilmington was the last remaining supply route open to Robert E. Lee's Army of Northern Virginia...." Areas of environmental concern include the site being within the erosion rate setback, the site's use as a state park and a historic place, and the site's proximity to estuarine waters, coastal floodplains, and ocean beaches and shorelines. The site location is in conflict with the current erosion rate setback, but is in a similar location as the existing facility. Also, the MOTSU Sunny Point buffer provides a setback on the western edge of the project location, but the new buildings are kept out of the Sunny Point buffer. Proposed Conditions The scope of the project includes demolition of the existing visitor center building, construction of a 2- story 22,000 SF visitor center, construction of a 10,000 SF Underwater Archaeology Branch facility, and site improvements. Site improvements include an approximate 130-space parking lot with associated drive aisles and sidewalks, relocated Duke Energy overhead line to underground through a significant portion of the site, reconstructed earth mounds to simulate the original fort, and associated stormwater management and utility connections. The project will also include temporary visitor facilities south of the proposed site during construction, at a location to be determined. Disturbed acreage is approximately 9 acres. Water supply and sanitary sewer connections for the new facility are provided by the Town of Kure Beach. The proposed site will be approximately 40% impervious. Stormwater treatment is proposed to be treated via approximately 12 stormwater management devices, including measures such as permeable pavers, infiltration, bioretention, and wet ponds. Funding for the project includes approximately $3 million from private sources and approximately $19 million in public funds. 0 ar _< I � z MT, uj I " cc 'vw II I rn lit 11 ................ ----------- �— ph North Carolina Department of Environmental Quality SCOPING MEETING REQUEST Please complete all the information below. Call and email the appropriate coordinator with the completed form. • Asheville Region - Alison Davidson 828-29&4698; alison.davidson(ftcdennoov Fayetteville and Raleigh Regions - David Lee 919-7914204; david.1ee0mcdeni oov G Mooresville and Winston-Salem Regions - VACANT • Washington Region - Lyn Hardison 252-948-3842; Iyn.hardison(a)-ncdennoov • Wilmington Region - Cameron Weaver 910-796-7303; cameron.weaverOncdenr aov Project Name: Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park County: New Hanover Applicant: Tony Romaine Company: NCDNCR Address: 109 East Jones Street Citv: Raleigh State: NC Zip: 27601 Phone: 919.807.7474 Fax: Email: tonv.romaine(cbncdcr.gov Physical Location of Project: 1610 Fort Fisher Blvd S, Kure Beach, NC 28449 Engineer/Consultant: Josh Hurst, PE Company: Clark Nexsen Address: 333 Fa etteville St Suite 1000 City: Raleigh State: NC Zip: 27601 Phone: 919.576.2120 Fax: Email: 'hurst clarknexsen.com Please provide a DETAILED project narrative, pdf site plan and a vicinity map with road names along with this Request form. The project narrative should include the following when available: Existing Conditions- List of existing permits, previous project name(s) or owner name(s), existing compliance or pollution incidents, current conditions or development on site, size of tract, streams or wetlands on site*, stream name and classification, historical significance of property, seasonal high water table elevation, riparian buffers, areas of environmental concern, setbacks Proposed- Full scope of project with development phase plan, acreage to be disturbed, wetlands to be disturbed, waste treatment & water supply proposed, soils report availability, % impervious surface, stormwater treatment and number of bmps, public or private funding. *Relative To Wetlands - Federal and coastal wetlands must be delineated by a US Army Corps Regulatory 01 cial, Coastal Management Field Rep or a qualified environmental consultant prior to undertaking work such as filling, excavating or land clearing. The delineations must be approved by the US Army Corps of Engineers (USA CE) and/or the Division of Coastal Management. Wetland delineations are valid for a period not to exceed five years from date of USACE approval. Please provide estimated investment & expected employment numbers: $ 22 million 12 Jobs For the scoping meeting, it is best to provide a list of questions and topics of concern. It is helpful to know what you hope to gain from the meeting. Please have thoughts and presentations organized as much as possible to make the best use of time. Agencies Involved: Check all agencies that may be involved with project: ❑ Marine Fisheries ❑ National Marine Fisheries ❑ U.S. Fish & Wildlife ❑ NC Wildlife Resources ❑ Coastal Management ® Land Resources ❑ Stormwater ❑Erosion Control) ® U.S. Army Corps of Engineers ❑ Shellfish Sanitation IMWater Resources: (❑ 401/buffer ❑ NPDES ❑ Non -discharge ❑ Public Water Supply) ❑ Air Quality ❑ Solid Waste ❑ UST ❑ Hazardous Waste ® Other New Hanover Countv ❑ Other ® Other Military Ocean Terminal Sunny Point ❑ Other ❑ Other NCDEQ Scoping Meeting March 2016 Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park Project Narrative July 5, 2019 Existing Conditions The project site currently has a visitor center and historic fort remnants from Fort Fisher, and contains the NCDNCR Underwater Archaeology Branch facilities. Most of the project site is owned by the State of North Carolina, with the remainder owned by the United States Government as the MOTSU "Sunny Point Buffer". The project site is historically significant from the Civil War era. According to www.historicsites.nc.gov, during the Civil War, Fort Fisher kept the "... port of Wilmington open to blockade-runners supplying necessary goods to Confederate armies inland. By 1865, the supply line through Wilmington was the last remaining supply route open to Robert E. Lee's Army of Northern Virginia...." Areas of environmental concern include the site being within the erosion rate setback, the site's use as a state park and a historic place, and the site's proximity to estuarine waters, coastal floodplains, and ocean beaches and shorelines. The site location is in conflict with the current erosion rate setback, but is in a similar location as the existing facility. Also, the MOTSU Sunny Point buffer provides a setback on the western edge of the project location, but the new buildings are kept out of the Sunny Point buffer. Proposed Conditions The scope of the project includes demolition of the existing visitor center building, construction of a 2- story 22,000 SF visitor center, construction of a 10,000 SF Underwater Archaeology Branch facility, and site improvements. Site improvements include an approximate 130-space parking lot with associated drive aisles and sidewalks, relocated Duke Energy overhead line to underground through a significant portion of the site, reconstructed earth mounds to simulate the original fort, and associated stormwater management and utility connections. The project will also include temporary visitor facilities south of the proposed site during construction, at a location to be determined. Disturbed acreage is approximately 9 acres. Water supply and sanitary sewer connections for the new facility are provided by the Town of Kure Beach. The proposed site will be approximately 40% impervious. Stormwater treatment is proposed to be treated via approximately 12 stormwater management devices, including measures such as permeable pavers, infiltration, bioretention, and wet ponds. Funding for the project includes approximately $3 million from private sources and approximately $19 million in public funds. = 0 -. 1 W m x vi m x �y R = W C K O n fi •SylA,�. o g W F• J 2R��] • 6 LU 21-1Nday Hill U =As..ay IIIIIIIII I. 1 I li i %I •\ 1 it i'/ o (�\ i I .11 it ! , ; � \ � 'L•..._ ,.�. L, 2 1 a II II \\ I I i i i I ■■ ' i ,*j a �� tl � l i �• i � i I eo� •i!d l ■ I i i � ��g�lyl'tl��i` Z��■i31tli! ! ■ i piP e �`ple�a vm� CO C.) uj 0"� - o W- CIL Amli Weaver, Cameron From: Josh Hurst <jhurst@ClarkNexsen.com> Sent: Wednesday, August 7, 2019 8:42 AM To: Weaver, Cameron Subject RE: [External] Scoping meeting request Thanks Cameron. I understand. Here are some updated dates in August and September that don't work for us, if that is any help: • Monday, August 12 • Friday • esday, August 20 • Wednesday, August 21 • ur ay, August 22 • Tuesday, September 3 • Thursday, September 5 • Thursday, September 19 • Wednesday, September 25 Thanks, Josh From: Weaver, Cameron <cameron.weaver@ncdenr.gov> Sent: Tuesday, August 06, 2019 5:10 PM To: Josh Hurst <jhurst@ClarkNexsen.com> Subject: RE: [External.] Scoping meeting request HI Josh. I sincerely apologize for the delay here. It is on me...I will be sending this out to get you a date as quickly as possible, but it likely is going to be outside your range you gave here. Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Ca meron.Weaver0ncdenr.eov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From: Josh Hurst <ihurst ClarkNexsen.com> Sent: Friday, July 5, 2019 1:18 PM To: Weaver, Cameron <cameron.weaver@ncdenr.eov> Subject: RE: [External] Scoping meeting request Cameron, Attached is the Scoping Meeting Request form, narrative, site plan, and vicinity map for the Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park project. Also, here are dates that do NOT work for our team for a Scoping Meeting in July and August: • Week of July 8 • Tuesday, July 16 • Thursday, July 18 • Friday, July 19 • Monday, July 22 • Tuesday, July 23 Thursday, July 25 • Wednesday, July 31 • Thursday, August 1 • Friday, August 2 • Tuesday, August 6 • Friday, August 9 • Monday, August 12 • Tuesday, August 13 • Thursday, August 15 • Friday, August 16 • Tuesday, August 20 • Friday, August 23 • Tuesday, August 27 Please let me know if you have questions or need anything else from us on this. Thanks! Josh Josh Hurst PE, PTOE, LEED AP BD+C M CLARKNEXSEN 333 FayetteviIIL Street Su;,- 1000 Raleigh, NC 27601 919,516.2120 Direct 919.828.1876 Office jhurst@-,1:3rknc-xsen.com www.clarknexsen.com Per Title lr of tl :. Civ'l Fights Act of 1964 ana other non discriminoteon statutes, Clark Nexsen will nor discriminate or! the grounds of race, color :.at"jnal origin, sex, age, disability, or lo.:, income in ,the selection and retention of sub -consultants. including oroc:lrement cif n1ateriols and leases of 2 1 � equipment. Cia: ;; Nexsen will er;:;ur= that minorities will be ciforded fill opportur ry to submit proposals and will not be disciimircted agai.•ist i•7 consideration for an award. in ru .i From: Weaver, Cameron <cameron.weaver ncdenr.eov> Sent: Monday, June 03, 2019 1:45 PM To: Josh Hurst <ihurst@ClarkNexsen.com> Subject: FW: [External] Scoping meeting request Hi Josh Never heard anything from you on this. Let me know of ways I may assist. Cameron Weaver Environmental Assistance Coordinator NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.eov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Weaver, Cameron Sent: Thursday, May 16, 2019 9:17 AM To: Josh Hurst <ihurst@ClarkNexsen.com> Subject: RE: [External] Scoping meeting request Hi Josh Here is the Scoping Meeting request form that you need to fill out, provide the requested attachments and send back to me with blackout dates where you know the meeting cannot occur. It can take up to six weeks to get the necessary parties to the table so if you have a time. crunch, you need to be prompt in sending the materials back in to me. Let me know. Cameron Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ricdenr.eov Email correspondence to and from this address is subject to the North Carolina Public Records Law and. may be disclosed to third parties. 3 From: Josh Hurst <ihurst ClarkNexsen.com> Sent: Thursday, May 16, 2019 8:48 AM To: Weaver, Cameron <cameron.weaver(@ncdenr.eov> Subject: [External] Scoping meeting request Cameron, I hope you are doing well! We are working on a project for the Fort Fisher visitor center,. and would like to request a scoping meeting for the permitting. We have had some preliminary discussions with Patrick Amico, but he acknowledged that our next step is to coordinate with you on scheduling a scoping meeting. How would you like for us to request this meeting? Thanks, Josh Josh Hurst PE, PTOE, LEED AP BD+C Senior Transportation Engineer I Associate CLARKNEXSEN 333 Fayetteville Street Suite 1000 Raleigh, NC 27601 919.576.2120 Direct 919.828.1876 Office jhurst@clarknexsen.com www.clarknexsen.com Weaver, Cameron From: Josh Hurst <jhurst@ClarkNexsen.com> Sent: Friday, July 5, 2019 1:18 PM To: Weaver, Cameron Subject: RE: [External] Scoping meeting request Attachments: Scoping Meeting Request.docx; Project Narrative.docx; 20190614 Site Plan.pdf, Vicinity Map.JPG Cameron, Attached is the Scoping Meeting Request form, narrative, site plan, and vicinity map for the Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park project. Also, here are dates that do NOT work for our team for a Scoping Meeting in July and August: • Week of July 8 • Tuesday, July 16 • Thursday, July 18 • Friday, July 19 • Monday, July 22 • Tuesday, July 23 • Thursday, July 25 • Wednesday, July 31 • Thursday, August 1 • Friday, August 2 • Tuesday, August 6 • Friday, August 9 • Monday, August 12 • Tuesday, August 13 • Thursday, August 15 • Friday, August 16 • Tuesday, August 20 • Friday, August 23 • Tuesday, August 27 Please let me know if you have questions or need anything else from us on this. Thanks! Josh Josh Hurst PE, PTOE, LEED AP BD+C 0 CLARKNEXSEN 333 Fay Att^_vi'I•� Street Suit= 1000 Raieirh, NC 27601 1 919,576.2120 Direct 919,828,1876 Office jhurst@clarknexsen.com www.clarknexsen.com Per Title V1 of the Civil Rights Act of 1964 and other non-discrimination statutes, Clark Nexsen will not discriminate on the grounds of race, cc:or, national origin, sex, age, disability, or low in:ome in the selection and retention of sub -consultants, including procurement of materials and :eases of equipment. Clark Nexsen will ensure that minorities will be afforded full opportunity to submit proposals and will not be discriminated against in consideration for an award. ou in From: Weaver, Cameron <cameron.weaver@ncdenr.gov> Sent: Monday, June 03, 2019 1:45 PM To: Josh Hurst <jhurst@ClarkNexsen.com> Subject: FW: [External] Scoping meeting request Hi Josh Never heard anything from you on this. Let me know of ways I may assist. Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver(d)ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Weaver, Cameron Sent: Thursday, May 16, 2019 9:17 AM To: Josh Hurst <ihurst ClarkNexsen.com> Subject: RE: [External] Scoping meeting request Hi Josh. Here is the Scoping Meeting request form that you need to fill out, provide the requested attachments and send back to me with blackout dates where you know the meeting cannot occur. It can take up to six weeks to get the necessary parties to the table so if you have a time crunch, you need to be prompt in sending the materials back in to me. Let me know. Cameron Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 2 Cameron.Weaver@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Josh Hurst <ihurst@ClarkNexsen.com> Sent: Thursday, May 16, 2019 8:48 AM To: Weaver, Cameron <cameron.weaver@ncdenr.eov> Subject: [External] Scoping meeting request Cameron, I hope you are doing well! We are working on a project for the Fort Fisher visitor center, and would like to request a scoping meeting for the permitting. We have had some preliminary discussions with Patrick Amico, but he acknowledged that our next step is to coordinate with you on scheduling a scoping meeting. How would you like for us to request this meeting? Thanks, Josh Josh Hurst PE, PTOE, LEED AP BD+C Senior Transportation Engineer I Associate CLARKNEXSEN 333 Fayetteville Street Suite 1000 Raleieh NC 27601 919.576.2120 Direct 919.828.1876 Office jhurst@clarknexsen.com www.clarknexsen.com Weaver, Cameron From: Amico, Patrick J Sent: Monday, August 12, 2019 11:36 AM To: Weaver, Cameron Subject: Re: [External] Scoping meeting request Cameron: Here's my availability with regard to the Fort Fisher scoping meeting request. Thanks, Patrick Patrick Amico Environmental Specialist NC Division of Coastal Management Department of Environmental Quality 910 796-7423 office 910 395-3964 fax patrick.amico@ncdenr.gov I 127 Cardinal Drive Ext Wilmington, NC 28405 --"-^Nothinq Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Weaver, Cameron <cameron.weaver@ncdenr.gov> Sent: Thursday, August 8, 2019.3:19:01 PM To: Hall, Rhonda B <rhonda.hall@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (US) <TYLER.A.Crumbley@usace.army.mil>; Josh Hurst <jhurst@ClarkNexsen.com>; Coburn, Chad <chad.coburn@ncdenr.gov>; Bedsole, Layton (layton.bedsole@nhcgov.com) <layton.bedsole@nhcgov.com>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Debra <debra.wilson@ncdenr.gov>; Amico, Patrick J <Patrick.Amico@ncdenr.gov>; Spears, Courtney <courtney.spears@ncdenr.gov>; fritz.rohde <fritz.rohde@noaa.gov>; twyla.cheatwood@noaa.gov<twyla.cheatwood@noaa.gov>; Lewis,Linda <linda.lewis@ncdenr.gov>; Hall,'Rhonda B <rhonda.hall @ncdenr.gov> Subject: Fw: [External] Scoping meeting request Hi all. Many of you will be receiving meeting requests from me over the next couple of days as I address the backlog of multiagency meeting requests. Attached are materials for the first request. I will be shooting to hold 2-3 meetings on the date selected by the group. This request came in while I was on vacation, and I have updated the potential dates for the meeting to be the following: August 23, August 26, August 27, August 28, August 30, September 4, September 6, September 10, September 12, September 13, September 16, September 17, September 18, and September 20. Please take a look at the request, determine your agency's need to participate, and give me your availability from the dates provided. We will go further out, but hopefully that won't be necessary. Please let me know of any additional agencies that should be included. Josh, please provide me with your best contact at MOTSU, if you have one. I will research it as well. Thank you all for your time and efforts. Let me know of any issues. Cameron Cameron Weaver Environmental Assistance Coordinator NCDENR/DEACS 127 Cardinal Drive, Wilmington NC 28405 910-796-7303 http://portal.nc.gov/ncdenr From: Josh Hurst <jhurst@ClarkNexsen.com> Sent: Friday, July 5, 2019 1:17 PM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: [External] Scoping meeting request Cameron, Attached is the Scoping Meeting Request form, narrative, site plan, and vicinity map for the Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park project. Also, here are dates that do NOT work for our team for a Scoping Meeting in July and August: • Week of July 8 • Tuesday, July 16 Thursday, July 18 • Friday, July 19 • Monday, July 22 Tuesday, July 23 • Thursday, July 25 • Wednesday, July 31 • Thursday, August 1 • Friday, August 2 • Tuesday, August 6 • Friday, August 9 • Monday, August 12 • Tuesday, August 13 • Thursday, August 15 • Friday, August 16 • Tuesday, August 20 • Friday, August 23 • Tuesday, August 27 Please let me know if you have questions or need anything else from us on this. Thanks! Josh Josh Hurst PE, PTOE, LEED AP BD+C M,4 CLARKNEXSEN 333 r-2y_tt: 01,7 Str__t SL'ite 100J Raleigh, NC 276C1 9'_9.576.2120 Cis ect 919MS.1876 Of-,!...- 3 jhurst@clarknexsen,com www.clarknexsen.com Per Title VI of the Civil Rights Act of 1964 and other non-discrimination statutes, Clark Nexsen will not discriminate on the grounds of race, color, national origin, sex, age, disability, or low income in the selection and ret,,ntion of sub -consultants, including procurement of materials and leases of equipment. Clark Nexsen will ensure that minorities wily be aj;orded full opportunity to submit proposals and will not be discriminated against in consideration for an a,;iard. ,rty r,r. rii ; r i r i ::on`. , . t t i,. ri ul t:_ . r I r. itt-.r r .., -?:r -.,c ... 1..":,r . ! �,_ m -r- From: Weaver, Cameron <cameron.weaver@ncdenr.gov> Sent: Monday, June 03, 2019 1:45 PM To: Josh Hurst <jhurst@ClarkNexsen.com> Subject: FW: [External] Scoping meeting request Hi Josh. Never heard anything from you on this. Let me know of ways I may assist. Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Weaver, Cameron Sent: Thursday, May 16, 2019 9:17 AM To: Josh Hurst <jhurst@ClarkNexsen.com> Subject: RE: [External] Scoping meeting request Hi Josh. Here is the Scoping Meeting request form that you need to fill out, provide the requested attachments and send back to me with blackout dates where you know the meeting cannot occur. It can take up to six weeks to get the necessary parties to the table so if you have a time crunch, you need to be prompt in sending the materials back in to me. Let me know. Cameron Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 4 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.p,ov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Josh Hurst <!hurst@ClarkNexsen.com> Sent: Thursday, May 16, 2019 8:48 AM To: Weaver, Cameron <cameron.weaver@ncdenr.eov> Subject: [External] Scoping meeting request Cameron, I hope you are doing well! We are working. on a project for the Fort Fisher visitor center, and would like to request a scoping meeting for the permitting. We have had some preliminary discussions with Patrick Amico, but he acknowledged that our next step is to coordinate with you on scheduling a scoping meeting. How would you like for us to request this meeting? Thanks, Josh Josh Hurst PE, PTOE, LEED AP BD+C Senior Transportation Engineer I Associate CLARKNEXSEN 333 Fayetteville Street Suite 1000 Raleigh, NC 27601 919.576.2120 Direct 919.828.1876 Office jhurst@clarknexsen.com www.clarknexsen.com Weaver, Cameron From: Romaine, Tony Sent: Wednesday, August 14, 2019 1:34 PM To: Weaver, Cameron Cc: Mary H. Russo Subject: RE: [External] Scoping meeting request Cameron, Will these meetings ne in Raleigh or Kure Beach? I assume the meeting would be closer to the site, so the week of the 261h is out for me- my wife is out of town and I will need to be back in Raleigh during business hours to pick my kids up after school. August 22 Not available August 23 September 3 September 6 September 10. Thanks ■itMIMI■ ■■■■■ TONY ROMAINE, PE ■MEN Facility Construction Engineer hMININ Capital Projects Unit MEMO M O R T 14 CRR0LIMA 7nas+�pKr �c Direct: {919) 814-6614 t AT RRAt. ALA Loc«"on: _.r_, _?stJ c.`r, 3Lis!i NK 2760 RESOURCES 'vz:::46:15'1-ali r�r!YzCvr:zri3ia:1_hiVC.176L.7- 4 65 From: Weaver, Cameron <cameron.weaver@ncdenr.gov> Sent: Tuesday, August 13, 2019 3:57 PM To: Josh Hurst <jhurst@ClarkNexsen.com>; Romaine, Tony <tony.romaine@ncdcr.gov>; Hall, Rhonda B <rhonda.hall@ncdenr.gov>; Tyler A CIV USARMY CESAW Crumbley (US) <TYLER.A.Crumbley@usace.army.mil>; Coburn, Chad <chad.coburn@ncdenr.gov>; Bedsole, Layton (Ibedsole@nhcgov.com) <Ibedsole@nhcgov.com>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Wilson, Debra <debra.wilson@ncdenr.gov>; Amico, Patrick J <Patrick.Amico@ncdenr.gov>; Spears, Courtney <courtney.spears@ncdenr.gov>; fritz.rohde <fritz.rohde@noaa.gov>; twyla.cheatwood@noaa.gov; Lewis,Linda <linda.lewis@ncdenr.gov> Subject: FW: [External] Scoping meeting request Hi all I believe most of you received this previously but I have a new range of dates to pick from. This will be the first of 3 meetings to hold on the consensus date. The dates to choose from are: August 22, August 23, August 26, August 27, August 28, September 3, September 6, and September 10. 1 put a range, but I am shooting for September 6. Let's see what we can do! Let me know of others that need to be involved. Next email this afternoon will be for those of you involved with Ocean Isle Beach, and the final one today concerns BHI. Thank you all for your time and efforts! Cameron Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncderr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Josh Hurst <ihurst@ClarkNexsen.com> Sent: Friday, July 5, 2019 1:18 PM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: [External] Scoping meeting request Cameron, Attached is the Scoping Meeting Request form, narrative, site plan, and vicinity map for the Visitor Center and Underwater Archaeology Building at Fort Fisher State Historic Park project. Also, here are dates that do NOT work for our team for a Scoping Meeting in July and August: • Week of July 8 • Tuesday, July 16 • Thursday, July 18 • Friday, July 19 • Monday, July 22 • Tuesday, July 23 • Thursday, July 25 • Wednesday, July 31 • Thursday, August 1 • Friday, August 2 • Tuesday, August 6 • Friday, August 9 • Monday, August 12 • Tuesday, August 13 • Thursday, August 15 • Friday, August 16 • Tuesday, August 20 • Friday, August 23 • Tuesday, August 27 Please let me know if you have questions or need anything else from us on this. Thanks! Josh .lash Hurst PE, FM-, =E_D V Bey - CLARKNEXSEN 9s9.5 t C,2iZ3 C ', _:t Q �.C,Ja0.1J. J Qf�il.: www.clarknexsen.com r , is`,.?rr.c.�rrsc...�,i:.at:�;� cri s, �'. r; _ f r., r. )`. dig^ ;;,. s r.�e, colc.. ..L: cr 'Y,uy,C-:o' `r" �Ir`_ ... ;_ ''rt-:s: ct:;..... cnrr_.; s,,.cc.._'uc�:rts,i�.c;ac':::�prc-+r_.;?,.of;:?t_:,�::67rd.`as2sof -,1 :i:5!: r_' .�.. ,..:(. ''t��.S :.. -`.. �;: f; c•�c':::: lw�i: V� hc.-ti ��7.`h� to Sc. .. Z r . �: a<sals n.:: .. :'l; r;�� `., a;::5im.ir-:t_u ar ::: ist i,. From: Weaver, Cameron <cameron.weaver@ncdenr.eov> Sent: Monday, June 03, 20191:45 PM To: Josh Hurst <ihurst@ClarkNexsen.com> Subject: FW: [External] Scoping meeting request Hi Josh Never heard anything from you on this. Let me know of ways I may assist. Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 3 From: Weaver, Cameron Sent: Thursday, May 16, 2019 9:17 AM To: Josh Hurst <ihurst@ClarkNexsen.com> Subject: RE: [External] Scoping meeting request Hi Josh. Here is the Scoping Meeting request form that you need to fill out, provide the requested attachments and send back to me with blackout dates where you know the meeting cannot occur. It can take up to six weeks to get the necessary parties to the table so if you have a time crunch, you need to be prompt in sending the materials back in to me. Let me know. Cameron Cameron Weaver Environmental Assistance Coordinator NCDEQ-Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington NC 28405 910-796-7265 Cameron.Weaver@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Josh Hurst <ihurst@ClarkNexsen.com> Sent: Thursday, May 16, 2019 8:48 AM To: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: [External] Scoping meeting request * hriks or open its um yauverily. Send O SUSPki" erns AS M aC st t0 Cameron, I hope you are doing well! We are working on a project for the Fort Fisher visitor center, and would like to request a scoping meeting for the permitting. We have had some preliminary discussions with Patrick Amico, but he acknowledged that our next step is to coordinate with you on scheduling a scoping meeting. How would you like for us to request this meeting? Thanks, Josh Josh Hurst PE, PTOE, LEED AP BD+C Senior Transportation Engineer I Associate CLARKNEXSEN 333 Fayetteville Street Suite 1000 Raleigh, NC 27601 919.576.2120 Direct 919.828.1876 Office jhurst@clarknexsen.com www.clarknexsen.com