HomeMy WebLinkAboutWQ0031498_Sewer Extension_20070320•,cACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3
USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number:
(to be completed by DWQ)
1 1. Owner.
la. Town of Aberdeen
Full Legal Name (company, municipality, HOA, utility, etc.)
1 b. Bill Zell, Town Manager
Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!)
1c. The legal entity who will own this system is:
❑ id
� Indivual ❑ Federal ® Municipality ❑ State/County ❑Private Partnership ❑Corporation ❑Other (specify):
0 Id. PO Box 785 - 115 N. Poplar Street Ile. Aberdeen
Z Mailing Address City
If. NC
Z State 1 g 28315
--- ---.. - -- - Zip Code
----- _
4-1115 1 i. 910-944-7459 _ _._..--
� 1j. ze111115Qalltel.net
Q Telephone Facsimile E-mail
(� 2. Project (Facility) Information: -- -- — ---
- ---- _ — --- -- - - -----
a. oodGreen Subdivision Phase 5A - - - - - 1
a � 2b. Moore
Brief Project Name (permit will refer to this name
) County Where Project is Located
Qj3. Contact Person: -
Q 3a. David T. Upchurch, P.E. Hobbs, Upchurch & Associates
Name and Affiliation of Someone Who Can Answer Questions About this Application
3b. 910-692-5616
3c. dupchurch@hobbsupchurch.com
Phone Number E-mail
1. Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No.:
For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. adding another
phase, changing line size/length, etc.). Only include the modified Information in this permit application - do not
duplicate project information in B(7) and B(10-11) that has already been Included in the original permit.
2. Owner is ® Public (skip to Item 8(3)) ❑ Private (go to Item 2(a))
2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one)
❑ RetainingOwnership '
p (i.e. store, church, single office, etc.) or ! ❑Public Utility (Instruction 111)
Z ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction IV)
Q ❑ Selling units (lots, townhomes, etc. - go to Item B(2b))
Q3. Moore County Public Utilities -- ` - ------
Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project
�
4a. Moore County Wastewater Treatment Plant � 4b. NPDES NC 0037508
nm
NJHOBBS, UPCHU CH & ASSOCIA?£,S, P.A. B�T � �� 71
CONSULTING ENGINEERS
P.O. BOX 1737, 300 S.W. BROAD STREET Branch Banking and Trust Company
SOUTHERN PINES. NC 28388 66-112/531
(910)692-5616
Lctly Four hundred and no / 100 Dollars
DATE AMOUNT
3/13/2007 $400.00
C
0
HE
ER N . C . DENR .per.
V ID AFTER 90 DAYS I �J
NC
AUTHORIZED SIGNATURE
..■
FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 1
of W A rFq
*. State of North Carolina
1.JJ Department of Environment and Natural Resources
oY OQ Division of Water Quality
L FAST -TRACK APPLICATION
for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS
(Pressure sewers systems are not to be included as part of this application package)
INSTRUCTIONS: Indicate that you have included/addressed the following list of required application package items by
checking the space provided next to each applicable item. Failure to submit all required items will lead to your application
being returned as incomplete. This form may be photocopied for use as an original.
Application Form - Submit one original and one copy of the completed and appropriately executed application
form. Any changes to this form will result in the application being returned. The Division of Water Quality
(Division) will only accept application packages that have been fully completed with all applicable items
addressed. You do not need to submit detailed plans andspecifications unless you res and NO to Item B(12).
Application Fee - Submit a check in the amount of $400 made payable to: North Carolina Department of
Environment and Natural Resources (NCDENR). Checks shall be dated within 90 days of application submittal.
❑ III. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a
privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN)
which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the
sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities
Commission's Public Staff that states that an application for a franchise has been received, that the service area
is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the
CPCN or letter must match that provided in Item A(2a) of this application.
❑ IV. Operational Agreements — Submit one original and two copies of a properly executed operational agreement if
the sewer extension is permitted by a private applicant and will be serving residential or commercial lots (e.g.,
houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. If the applicant is a
homeowners' association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF
THE PROJECT WILL BE TURNED OVER TO A MUNICIPALITY, FORM DEV 02/03 IS REQUIRED.
Ef"V. Flow Acceptance Letters — If the owner of the downstream sewers and/or WWTF is different from the applicant,
submit two copies of a flow acceptance letter from the owner of the downstream sewers and WWTF, if different.
Flow acceptance letters must contain the following minimum information: applicant and project name, amount of
flow accepted, and name and permit number of the receiving sewers/WWTF. The flow acceptance must not
expire prior to permit issuance and must be dated less than a year prior to the application date.
Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific flow acceptance
letter.
211V*l. Map — Submit an 8.5-inch by 11-inch COLOR copy of the portion of a 7.5-minute USGS Topographic Map along
with this form. The map should identify the entire project area location as well as the closest downslope surface
waters as clearly as possible. Each map portion must be labeled with the map name and number, the identified
location of the sewer line and pump stations, and be of clear and reproducible quality. For instance, if the project
involves 4 miles of interceptor sewer that traverses over or near several different waterbodies (or counties,
basins, etc.), the map should have location ID's shown for each different waterbody (where the sewer line is within
100 feet of such waterbody - see Instruction VII). This location ID is self chosen and used to cross reference the
location in Section C of the permit application.
eVII. Stream Classifications — Section C
• If any portion of the project is within 100 feet of any down slope surface water, Section C must be completed
for the pertinent sections.
• If the entire project area is a minimum of 100 feet away from any down slope surface waters BUT there is a
pump station involved where a history of power outage is to be used to provide adequate design storage
instead of dual feed or permanent or portable generator, Section C must be completed to demonstrate that
the closest down slope surface water is Class C (see 15A NCAC 2H .0219(h)(3)(D)).
• Use the guidance document entitled, "Determining Watershed Classifications for Form FTA 02/03 (Fast -Track
Sewer Systems)" available from http://h2o.enr.state.nc.us/percs or by contacting the appropriate regional
office.
trTA nl in) n___
FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS
• PAGE 2
❑ Vill. Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC
01C], this application can not be used. Send the project application on Form PSFMGSA 10/99 to the PERCS
Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Applications can not be accepted until a Finding of No
Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted
with that permit application.
Rr IX. Certifications — Section D
The application must be certified by both the applicant and a North Carolina Registered Professional Engineer
(PE). The applicant signature must match the signing official listed in Item A(1 b). The PE should NOT certify the
application if he/she is unfamiliar with 15A NCAC 2H .0200, the Gravity Sewer Minimum Design Criteria (most
recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains
(most recent version), as applicable to the project. Certification by a PE who is unfamiliar with these documents
is subject to NC Board referral.
❑ X. Downstream Sewer & Wastewater Treatment Plant Capacity
The applicant has assured downstream pipe, pump station and treatment plant capacity. The addition of new
sources of wastewater from this project has been evaluated along the route to the receiving treatment plant. The
flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream
pump station en route to the receiving wastewater treatment plant. If the applicant is not the owner of the
downstream sewer or receiving treatment plant, submittal of flow acceptance letters) indicates that owner has
adequate capacity and will not violate G.S. 143-215.67(a).
THE COMPLETED FTA02/03 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND$400
FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE
REGIONAL OFFICE
ADDRESS
COUNTIES SERVED
Asheville Regional Office
2090 US Highway 70
Swannanoa, North Carolina 28778
Avery, Buncombe, Burke, Caldwell,
Cherokee, Clay, Graham, Haywood,
(828) 296-4500
(828) 299-7043 Fax
Henderson, Jackson, Macon, Madison,
McDowell, Mitchell, Polk, Rutherford,
Fayetteville Regional OfficeSwain,
g
Street Suite 714
Trans Ivania, Yance
Anson, Bladen, Cumberland, Hamett,ville,
Z225en
North Carolina 28301
Hoke, Montgomery, Moore, Robeson,6-1541
6-0707 Fax
Richmond, Sampson, Scotland
Mooresville Regional Office
.Center Avenue, Suite 301
Mooresville, North Carolina 28115
Alexander, Cabarrus, Catawba,
Cleveland, Gaston, Iredell, Lincoln,
(704) 663-1699
(704) 663-6040 Fax
Mecklenburg, Rowan, Stanly, Union
Raleigh Regional Office
1628 Mail Service Center
Raleigh, North Carolina 27699-1628
Chatham, Durham, Edgecombe, Franklin,
(919) 571-4700
Granville, Halifax, Johnston, Lee, Nash,
Northampton, Orange, Person, Vance,
Washington Regional Office
919 571-4718 Fax
943 Washington Square Mall
Wake, Warren, Wilson
Washington, North Carolina 27889
Beaufort, Bertie, Camden, Chowan,
Craven, Currituck, Dare, Gates, Greene,
(252) 946-6481
(252) 975-3716 Fax
Hertford, Hyde, Jones, Lenoir, Martin,
Pamlico, Pasquotank, Perquimans, Pitt,
Wilmington Regional Office
9 9
127 Cardinal Drive Extension
Tyrrell, Washington, Wayne
Wilmington, North Carolina 28405
(910) 395-3900
Brunswick, Carteret, Columbus, Duplin,
New Hanover, Onslow, Pender
(910) 350-2004 Fax
Winston-Salem Regional Office
585 Waughtown Street
Winston-Salem, North Carolina 27107
ny, Ashe, Caswell,
A=Randolph,
(336) 771-4600
Dorsyth, Guilford,
Rolph, Stokes, Surry,
(336) 771-4631 Fax
WYadkin
For more information, visit our web site at http.//h2o. enr state. nc. us/peres/
PTA niim De I nA/nC
i FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS
PAGE 3
Z
C
Q
C
U.
_Z
Z
O
V
J
a
a
USE THE TAB KEY TO MOVE FROM FIELD TO FIELDI Application Number: y�Q0031468
—------- ___ __ (to be completed by DWO)
1. Owner.• —
1 a. Town of Aberdeen
Full Legal Name (company, municipality, HOA, utility, etc.)
1 b. Bill Zell, Town Manager
Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!)
1 c. The legal entity who will own this system is:
❑ Individual ❑ Federal ® Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify):
Id. PO Box 785 - 115 N. Poplar Street 1 e. Aberdeen
Mailing Address City
1f. NC 1g
State
1 h. 910-944-1115 1 i. 910-944-7459 1j
Telephone Facsimile
Project (Facility) Information:
2a. WoodGreen Subdivision Phase-5A 2b
Brief Project Name (permit will refer to this name)
3 Contact Person:
----
3a. David T. Upchurch P.E. Hobbs Upchurch & As
3b.
sociates
Name and Affiliation of Someone Who Can Answer Questions About this Application
910-692-5616
Phone Number 3c. dupchurch h
com
( g permit) If Modification, Permit No.:
I. Project is ®New El Modification of an existing
For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. adding another
phase, changing line size/length, etc.). Only Include the modified Information In this permit application - do not
duplicate project Information in B(7) and B(10-11) that has already been included In the original permit. j
2. Owner is ® Public (skip to Item B(3)) ❑ Private (go to Item 2(a))
2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one
❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (Instruction III)
0 Z ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction IV)
❑ Selling units (lots, townhomes, etc. - go to Item B(2b))
Q3. Moore County Public Utilities
Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project
4a. Moore County Wastewater Treatment Plant 4b. NPDES NC 0037508
O Name of WWTF WWTF Permit No.
I.L. 5a. Town of Aberdeen 5b. 8"
®Gravity '5c.
Z X
Z Owner of Downstream Sewer ;Receiving Sewer Size !❑ Force Main Permit Number of Downstream Sewer (if known)
�— 6. The origin of this wastewater is (check all that apply):
® Residential Subdivision ❑ Car Wash
W ❑ Apartments/Condominiums El Institution
a ❑ Mobile Home Park El Hospital
100 % Domestic/Commercial
El School
❑ Restaurant ❑ Church % Industrial
m El Nursing Home
Office _ ❑ Other (specify): % Other (specify):
7. Volume of wastewater to be allocated for this particular project: 2,520 gallons per day
_--*Do not include previously permitted allocations
8. If the permitted flow is zero, indicate why:
❑ Interceptor Line - Flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit No.
❑ Rehabilitation or replacement of existing sewer with no new flow expected
I
PTA nIinll n _. nA Inf
FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4
9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H
.0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than
that in 15A NCAC 2H .0219(I)(1-2) must be supported with actual water or wastewater use data in accordance with 15A
NCAC 2H .0219(I)(3).
7 single family homes @ 360 GPD = 2,520 GPD
I j
10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary)
i
Size (Inches) Length (feet) Gravity or Force Main
(use the pull down menu)
8609 Gravity
W
Z
1=
Z
O ENTER TOTAL LINE LENGTH IN MILES 0.11
11_ Summary of Pump Stations to be Permitted (attach additional sheets as necessary)
Z
Location ID Power Reliability Option
(self chosen -as shown on Design Flow Operational Point (1- dual line feed; 2- permanent generator WATS; 3•
Q plans for cross-reference) (MGD) GPM @ TDH portable generator w/telemetry; 4-wet well storage)
_._-.
LA.
Z _ _ _-
F-
12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force
Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable?
W ® Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and Indicate why a
a variance Is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS
adPERTINENT TO THE VARIANCE WITH YOUR APPLICATION
13. Have th e following permits/certifications been submitted for approval?
Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes ® No ❑ N/A j
Sedimentation and Erosion Control Plan? ❑ Yes ❑ No ® N/A
Stormwater? ❑ Yes ❑ No ® N/A
14. Does this project involve aerial lines or siphons? Check if yes: ❑
These lines will be considered hiah orioritv and must be checked once every six months
15. Does this project have gravity sewer lines designed at minimum slopes?
Be aware that the Division will not accept installed lines more than 10% flatter than the minimum slope. Lines installed outside this tolerance should be
corrected prior to submitting the final engineering certification..
FTA 02/03 - Rev. 3 04105
FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS
• PAGE 5
1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03
(FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as
necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality
Z regional office (see instructions for addresses) OR indicate the following:
O
0 ® A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope
i
Q waterbody; AND,
(,� ® A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability
LL option for any pump station near a Class C down slope waterbody.
yLocation ID on Map
(self chosen - as shown on Name of
map for cross-reference) Waterbody
C� 1 Aberdeeen Creek
W
F-
U)
d
rd�
Waterbody Stream Waterbody i
County River Basin Index Classification
i
Moore Lumber 14-2-11-(6) C
Submit the 8.5" x 11" COLOR topographic map as required In Instruction VI
regardless of whether a classification is providedl
1. Applicant's Certification:
I attest that this application for WoodGreen Subdivision Phase-5A has been reviewed by me and is accurate and
complete to the best of my knowledge. I understand that if all required parts of this application are not completed and
that/fall required supporting documentation and that
are not included, this application package is subject to
being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B,
any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of
a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per
violatlo
1 a.
Signing Officiarfignature
2. Professional Engineer's Certification:
17107
Date
1, David Upchurch, P.E. attest that this application for WoodGreen Subdivision Phase-5A has been reviewed by me and is
accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting I
documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has
been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers
adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force
Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain
Portions of this submittal package may have been developed by other professionals, inclusion of these materials under my
signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design.i
Note: In accordance with NC General Statutes 143-215.6A and 143-215.68, an
y person who knowingly makes any false
statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a
fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
2a. David Upchurch P.E.`CA
Professional Engineer Name"
2b. Hobbs, Upchurch $Associates, P.A.
Sf7< `*
Engineering Firm
2c. P.O. Box 1737 SE
r
Mailing Address �
2d. Southern Pines 2e. NC 2f. 28388 �� <
City State Zip„��
2g. 910-692-5616 2h. 910-692-7342 2i. dpchurch@hobbsupchurch com
E-mail ,+►�
Telephone Facsimile r���
----- ---- -- ---
- -- -- ---- ----- Seal, Signature 8 Date
FTA 07/1)1 - V.- -2 n/iinc
N „00'0
.9£0 N „00'0
80 .S£0 N „00'0
LO .WO
n ••\•
�.' S•-a•.\ r � tl
' _ �' ♦ G� : .. ._' ' � Q'
t'r3 ,
• AI • —.--i-r .�'''i,
.. >s (�� �.
Jt
`�'
0
a0
u
cc
LD
to
(\�
�7 i/ i
..,• —J
s4 /
�, fin. \� NO••a.
X.,
`` + �
/�� I ` - It
/3 . P 33
�`O .S
•7
� � •' �, t+:
I �1 �1
M9IN,..r• •ayws. \ l
i
•,( �/ �/s>ps�•�Nrrsr
b
, 3 /
+ R� V
♦ 1 J
l
-0
" q
. t+1 `{ �t �
r 5:�. �'\
I r 11/ 1 44^ f�., ��.�
1 dab• a�i.��'�• �`'.• �/
(' .�i ``NN. ljwlS9,��w= ar +lye'
�t•fJ
- /�'•
,
(( \�
ewr.\ �
• Ay i
6 ♦ ^M}'
_
00
ft ''••���,CsJ
\,a '1.•�
wso Q�.��
iw y r nw/l 4�`t�-•�
jr
—_`_
J
N „00'0
60 AM N „00"0
90 .9£0 N .00.0
L0.9£0
cl
ri
1'. (). BOX 1y17
Carthage, North Carolina
March 14, 2007
Mr. Lee Parris
Hobbs, Upchurch & Associates
P O BOX 1737
Southern Pines NC 28388
Dear Mr. Parris
County of Moore
Public Works
IVIV W. i11 tit V 11C.C]OV
C�JNTV OF M0�9F
0
naa
NORTN :Qom
MAR 16 2007
(910)947-6315 (Telephone)
(910)947-1992 (Facsimile)
RE: Flow Acceptance letter for WoodGreen Subdivision, Phase 5A, Aberdeen, NC.
HUA No. AB0608
The Moore County Water Pollution Control Facility, NPDES # NC 0037508, presently
has sufficient capacity available to conditionally accept up to 2,520 gallons per day from
the above referenced project. This letter does not reflect the capacity of the immediate
collection system owned and operated by the Town of Aberdeen
This project will be required to comply with all specifications and requirements of the
Town of Aberdeen, NC. and AWWA Standards.
Upon completion of the referenced project, the applicant's engineer is to provide our
office with the following items:
1. Certification of Completion.
2. Complete set of As -Built drawings.
If you have any questions or comments please call me at (910) 947-6315.
Property Management
Public Utilities
Solid Waste
Wastewater Treatment Plant
Ph - (910)947-2301
Ph - (910)947-6315
Ph - (910)947-3637
Ph - (910)281-3146
Fax - (910)947-2304
Fax - (910)947-1992
Fax - (910)947-1992
Fax - (910)281-2047
Flow Acceptance, Wood Green, Aberdeen
March 14, 2007
Page 2
Sincerely,
MOORE C PUBL WORKS
Lex K ly, P.E.
County Engineer
Cc: Mr. Delmo Frye, WWTP Superintendent
Mr. Ricky Monroe, Public Works Director, Town of Aberdeen
Mr. Giles Hopkins, Planning Director, Town of Aberdeen