Loading...
HomeMy WebLinkAboutNCC202153_ESC Approval Submitted_20200527ROY COOPER Governor MICHAEL S. REGAN secretary BRIAN WRENN Acting Director NORTH CAROUNA Environmental Quality May 5, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Royalcrest Builders, LLC ATTN: Gary Berg, Manager PO Box 9263 Greensboro, NC 27429 RE: Project Name: Hillcrest Subdivision Phase 2 Acres Approved: 3 Project ID: RANDO-2020-015 County: Randolph City: Asheboro Address: Fermer Rd. River Basin: Yadkin - PeeDee Stream Classification: C Submitted By: Summey Engineering Associates, PLLC Date Received by LQS: April 13, 2020 Plan Type: New Dear Mr. Berg, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 NOFH CAF*LINA oawron.Ma mGULRY /"� 336.776.9800 Letter of Approval With Modifications Royalcrest Builders, LLC May 5, 2020 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Zachary Le tz, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet cc: Summey Engineering Associates, PLLC ATTN: Christian Vestal PO Box 968 Asheboro, NC 27204 WSRO file Letter of Approval With Modifications Royalcrest Builders, LLC May 5, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: HIllCrest Subdivision Phase 2 Project ID: RANDO-2020-015 County: Randolph Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Temporary slope drains must be provided where temporary diversions discharge into sediment basins or traps with a slope height greater than seven feet. [G.S.113A-57(3)] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 3. All areas required for stockpiling of topsoil, contractor staging, temporary access, haul roads, installation or maintenance of erosion control measures, or other land -disturbing activities associated with this project must be covered by an approved erosion control plan. If it is found additional area will be required, an erosion control plan reflecting the additional area must be submitted to this office. [15A NCAC 413.0118] Additional Comments: 1. Be advised that homebuilding and utility installation performed by parties other than the financially responsible party would be required to obtain an independent plan approval as part of this common plan of development, or this plan must be amended to include that work. [GS 113A-54.1, NCG010000] 2. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110]