Loading...
HomeMy WebLinkAboutNC0026565_Pretreatment Compliance Inspection Report_20190416ROY COOPER Governor MICHAEL S. REGAN Secretory LINDA CULPEPPER Director Grant Cheek Town of Ramseur P.O. Box 545 Ramseur, North Carolina 27316 NORTH CAROLINA Environmental Quality April 16, 2019 SUBJECT: Pretreatment Compliance Inspection (PCI) Town of Ramseur NPDES# NCO026565 Randolph County Dear Mr. Cheek: On March 19, 2019 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Ms. Nadine Blackwell, Pretreatment Coordinator for the Town of Ramseur was present for the inspection along with Mr. Terry Lewallen, ORC for the facility. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 0.48 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) which is categorical. The publicly owned treatment works (POTW) has not had any limits violations since the last pretreatment compliance inspection. POTW Interview There are no plant problems related to pretreatment issues and there are no NPDES permit limit or monitoring violations recorded from March 2018 through February 2019. The facility is very well operated. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on December 20, 2017. The HWA was approved on February 8, 2018. The next HWA is due on October 1, 2022. The last Industrial Waste Survey (IWS) was submitted on January 15, 2016. The IWS was approved on March 7, 2016. The next IWS is due on April 1, 2021. NOAn-icJwaur�nD �\� Qbi� nawmnem of Enmronm woviRv North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27103 336,776,9800 The Sewer Use Ordinance (SUO) was approved on October 2, 2015. The Enforcement Response Plan (ERP) was approved on October 2, 2015. The Short Term Monitoring Plan (STMP) was approved on October 2, 2015. STMP File Review The Short Term Monitoring Plan (STMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review The SIU (Matlab, Inc.) was in compliance in 2018. The zinc coating operations has been moved to their Greensboro facility. A review of the file for Matlab, Inc. (#002) revealed that the monitoring data was well organized and compliant. The slug control plan for Matlab, Inc (#002) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Ms. Blackwell maintains an excellent pretreatment program. If you have any questions, please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, EDocuSigned by: �� z SmJtr -"49E225C94EA... Lon T. Snider Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: PERCS Unit — Monti Hassan Nadine Blackwell - Suez Central Files WSRO Files