Loading...
HomeMy WebLinkAbout20200696 Ver 1_CAMA Application_20200522DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Wayne Del Tufo PROJECT NAME: Del Tufo Private Docking Facility 2. LOCATION OF PROJECT SITE: 9241 Peakwood Dr. SW adjacent to the AIWW in Sunset Beach, Brunswick County Coordinates: Latitude N 33°52'24.63" Longitude W 78°32'59.24" 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 5-6-2020, 5-13-2020 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received — 5-4-20 Application Complete — 5-8-2020 Office - Wilmington 6, SITE DESCRIPTION: (A) Local Land Use Plan - Town of Sunset Beach Land Classification From LUP — Low Density Residential (B) AEC(s) Involved: PT, CW (C) Water Dependent: Private Docking Facility — Yes (D) Intended Use: Residential (E) Water and Wastewater Treatment: Existing - None Planned - Septic system (F) Type of Structures: Existing - Single Family Residence under construction Planned - Two (2) slip docking facility with floating dock and boathouse covered boathouse with boatlift and fixed platform underneath (G) Estimated Annual Rate of Erosion: NIA VA HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTUFR (A) Uplands N/A N/A 270 sq. ft. (Disturbed) (B) Vegetated Wetlands NIA NIA 1,872 sq. ft. (Shaded) (C) Open Water N/A N/A 1,365 sq. ft. Inco orated (D) Total Area Disturbed: 3,507 sq. ft. (.08 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA; HQW Open: No PROJECT SUMMARY: The applicant proposes to install a private pier, finger pier, covered boathouse with boatlift and fixed platform underneath, and a floating dock for a total of 2 slips. Del Tufo Private Docking Facility May 18, 2020 Page 2 --------------------------------------------------------------------------------------------------------------------------------------- 9. PROJECT DESCRIPTION The proposed project is located on the mainland side of the AIWW in Sunset Beach, Brunswick County. The property can be reached by traveling NC HWY 17 south towards Sunset Beach. Travel straight through the intersection of HWY 17 and NC 130 in Shallotte, and continue down HWY 17 until you reach Seaside Rd SW/ NC 904. Take a left onto Seaside Rd SW/ NC 904 and continue south until it intersects with NC 179/ Old Georgetown Rd SW. Take a right onto NC 179/ Old Georgetown Rd SW and continue for approximately 3.5 miles. Turn left onto Beach Dr./ NC 179 Business. Continue south for approximately 1.5 miles and then take a right onto Ocean Harbor Golf Club Rd. Take your first left onto Peakwood Dr. and continue until you reach 9241 Peakwood Dr. on the left-hand side. The property consists of a single family residence under construction located on a .71-acre high bluff parcel approximately 16' above normal high water (NHW) and is vegetated with typical coastal -plain tree species found on well -drained, rich soils including Mockernut Hickory (Carya tomentosa) and Tulip Poplar (Liriodendron tulipifera). The property has approximately 124 linear feet of shoreline frontage along the southern edge of the property and is stabilized with landscape grasses. Sporadic patches of Saw Palmetto (Serenoa repens) and Wax Myrtle (Myrica cerifera) separate the landscape grasses from the high marsh. High marsh spans approximately 20' waterward from the toe of the bluff and consists mainly of bulrush (Scirpus spp.). The Coastal Wetlands located water ward of MHW consist primarily of Smooth Cord Grass (Spartina alterniflora), spanning approximately 260' over intermittent mud flats as it extends out to the AIWW. The width of the waterbody measures approximately 618' from marsh to marsh in the vicinity of the proposed docking facility. The waters of the AIWW are classified SA by the Division of Water Quality and ARE designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries. They are CLOSED to the harvest of shellfish. PROPOSED PROJECT The applicant proposes to install a private pier, finger pier, covered boathouse with boatlift and fixed platform underneath, and a floating dock for a total of 2 slips. The applicant proposes to build a 6' x 456' access pier (as measured from MHW) that would originate from an upland point and extend toward the southeast. The proposed access pier would lead to a 6' x 8' (48 sq. ft.) finger pier located at approximately 412' on the west side of the pier. The finger pier would lead down a gangway to an 8' x 12' (96 sq. ft.) floating dock (Slip 2). The access pier would continue beyond the finger pier another 44' where it would terminate with a 13' x 33' (429 sq. ft.) covered boathouse that includes a boatlift (Slip 1) and a 10' x 12' fixed platform (approximately 144' beyond the waterward edge of the marsh). The property has approximately 124 linear feet of shoreline and the facility's design appears to remain within the applicant's area of riparian access and would not encroach into either 15 ft. adjacent riparian access. The applicant's design extends beyond the pier head line of adjacent docking facilities but does not exceed the width of the waterbody. As measured by the contractor, the docking facility would extend across approximately 23% of the waterbody. The proposed design terminates approximately 55' landward of the USACOE 80' federal channel setback. The applicant proposes to extend beyond the pier head line to reach navigable water depths throughout the tidal range and to avoid bottom impacts to the Primary Nursery Area (PNA). Water depths (as measured by the contractor) at the pier head line are approximately -1.0' NLW. The contractor recorded water depths that ranged from -2.0' NLW at the landward edge of the proposed docking facility to -2.5' NLW at the waterward edge of the proposed docking facility. DCM staff recorded water depths ranging from -1.5' NLW at the landward edge of the proposed docking facility to -2.0' NLW at the waterward Del Tufo Private Docking Facility May 18, 2020 Page 3 edge of the proposed docking facility (measurements taken at 9:45am on 5-13-20). 10. ANTICIPATED IMPACTS The proposed docking facility would incorporate approximately 1,365 sq. ft. of Estuarine and Public Trust Area and would shade approximately 1,872 sq. ft. of Coastal Wetlands. The proposed configuration of the docking facility would provide docking space for two (2) vessels in water depths ranging from approximately -2.0 ft. to -2.5 ft. @ NLW as measured by the contractor. The proposed development would be located outside of the adjacent 15' riparian corridor setbacks on both sides and would be constructed outside of the federal channel setback. Minor increases in turbidity should be expected during construction. Submitted by: Brendan Brock Date: May 18, 2020 Office: Wilmington The purpose of the project is to facilitate allowances for riparian property owner's right to use adjacent water as articulated in the property deed of the owners of the property at 9241 Peakwood Dr. Sunset Beach, NC. The deeds stipulate the ability to build slips in accordance with state and federal laws. Currently, the neighboring structures are at an outward point of approx. 1 ft. depth of water at NLW. The "pier head line" which extends from ,the outermost distance of neighboring pier to neighboring pier is typically used for placement of outward distance of new piers in close proximity to them_ Using this headline would place the new structure at the same depth of water as the neighboring piers which causes the inability of using the structure for docking at low tides. This, potentially, could cause problems not only with docking but with distress situations such as being stranded with no place to dock for hours until the tide rises enough to dock a boat. other neighbors have already built their piers to the outward distance that is being proposed with this permit. The owner would like to place the pier approx. 30 ft. water ward of the neighboring pier headline described above. This would be in line with several neighboring piers which have already been built to that distance and allow safer boating so as not to wait hours to dock safely. The USACE has been contacted and reported that the neighboring pier outward position is approx. 85 ft. from the go ft, setback from the toe of the AIV1 W dredge channel. Therefore the proposed distance of this pier is still approx. 55 ft. from the setback. There would be a total of one pier located a distance outward to allow for sufficient depth of water at designated slip sites as shown on submitted drawings. The stationary access pier would be built from above NHW on the property and extend approx. 455 ft. into the AiWW with one boat lift prescribed (as shown on drawing) and one floating dock would be built located adjacent to the water ward end of the pier to be used as the single floating structure. The pier with its boat lift and floating dock will provide docking for the property owners of 9241 Peakwood Dr. The size of the tract is approx.71 acres and 124 lineal ft. of frontage on the AIWW. All permits, delineations, and surveys deemed necessary for this project will be acquired. Project Narrative for Wayne JXI IJ-0) pier Project Name: Wayne 'Ve1 IA Pier County: Brunswick Applicant: Maritime Coastal Construction LLC. C/O Bill Thomas 630 Millslough Ln. Sunset Beach, NC 28468 bill@maritimecoastalconstruction.com Phone - 910-842-3625 Fax a 910-575-8222 Physical location of project: 9241 Peakwood Dr. Sunset Beach, NC 28468 ftrCENED Mg 0 7 ZO V l - Tot} He Existing Conditions: Area to have docking facilities is property owned by the Wayne QL! Tuk The property is approx..71 acres and has approx.124 lineal feet of frontage on the !North side of the AIWW opposing Bird Island. There are no current facilities built there at this tirrre. Project Chronology: All building materials will be brought to the project site and unloaded on the Deltufo property above the coastal wetlands line_ These materials will be moved by hand to the respective positions on the structure as needed during the building process. The materials will be handled with care taking precautions to minimize any movement in the wetlands area. Initial construction will begin with installation of the pier pilings. Pilings will be 6 in. by 6 in. marine grade pressure treated 2.5. These pilings will be "jetted" down into the grade using a Z in. or 3 in. water pump. The water pump will be placed on a flotation device which is secured using an anchor system. The flotation device is in approx. 2 — 3 ft. deep water at normal low tide. The pilings will be installed @ approx. 8 ft. on center running perpendicular to the shoreline. The depth of the pilings will be approx. 6 ft, or to hard shell layer. The pilings will be installed to total length of the respective pier as shown on drawings. Once pilings are installed, the framework will be installed. 2 in. by 8 in. band boards will be run along the outside of the pilings longwise with the pier. These band boards are 16 ft. long and will incorporate 3 pilings per board. The pier will be constructed to that the elevation of the deck boards is @ 4 ft. above normal high water. The beginning of the pier is set at the top of the bank elevation. Once band boards are installed the girder beams will be installed. 2 in. by 8 in. girder beams will be placed underneath band boards and attached to the pilings on both sides per piling. The girders will be through bolted int3 the pilings using 5/8 hot -dipped galvanized carriage bolts. Once the girder beams are installed, the joists will be installed. 2 in. by 8 in. joists will be installed @ 2 ft. on center and toe nailed into the girder beams using hot -dipped galvanized 16d nails. The joists are 2 in. by 8 in. treated lumber using 16 ft. boards which incorporate 3 girders per board. The joists will meet halfway between girders and rest on top of the girders_ Once the joists are installed, the decking will be installed. Decking material is 2 in. by 6 in. # 1 treated lumber. These will be installed using stainless steel screws (# 10). Deck boards will be installed as to allow for proper spacing between boards for drainage etc. [Decking will extend from outside of band board to outside of band board. Once decking is complete on the pier, the water pump will be placed on the pier to complete any necessary jetting of pilings. Once decking is complete, the floating dock will be constructed. The floating dock will be constructed off --site and floated to site. Dimensions: 12ft. L. by 8 ft. W. with an additional gangway landing section dim. 8 ft. W. tapering to 6 ft. W. by 6 f. L. The floating dock will be constructed using black polyethylene encapsulated Styrofoam billets. Billet dimensions— 2 ft.W by 4 ft. L by 18 in. depth. Band boards are 2 ED in. by 8 in. set @ 2 ft. on center. Corners of frame are reinforced using 3 in. by 5 in. hot dipped galvanized steel angle brackets and in. galvanized carriage bolts through wood and brackets. Decking is 2 in. by 6 in. treated lumber secured using #10 stainless steel screws. Once dock is complete and brought to site via water, the dock will be secured with three pilings. Pilings will be set outside the framework of the dock using exterior piling guides. Two pilings will be set on the east side of the floating deck toward the stationary boat house and one on the north side next to the gangway. Filings will be installed using the water pump and will be jetted to approx. 6 ft. depth or to hard shell layer. Once dock is in place, the gangway will be built and installed. The gangway will be attached to the pier and will rest on the floating dock with rollers at the end for movement. Gangway dimensions: 3 ft. W by 16 ft. L. The gangway will be constructed using all aluminum framework, all aluminum roller system with rubber rollers, and composite decking. Once the gangway is installed, the handrail for the pier will be constructed. The handrail for the gangway and pier is the same and is described below: 4 in. by 4 in. posts set # 8 ft. on center connected to the band boards on the pier using (1) 5/8 in. hot dipped galvanized carriage bolts. The top rail is a 2 in. by 6 in. board with another 2 in. by 4 in board adjacent attached together using # 10 stainless steel screws_ A center rail board is a 2 in. by 4 in. board. Both top and center rail boards are connected to the 4 in. posts using # 10 stainless steel screws Handrails will be installed on the main access pier and on the decked area of the boat house. Boat lift installation: The boat lift slip will only be built for the use of boat lifts and not for mooring, docking, etc. The boat lift pilings will be installed per footprint of respective manufacturer's specification. Typically, and for purposeF of the permitting process, we are proposing the footprint for±`dle 10,0001b. lift manufactured by Boatlift US_ This footprint is for the dimensions of approx. 13 ft. W by 13 ft. L. The construction of the boat lift would go as follows: The lift would be brought in sections including beams, motors, bunks, and assembly packages. These would be walked onto the pier without anyone going into the wetland area. The pilings would be brought in by boat or barge and stood up in the appropriate positions. A water pump with jetting equipment would be used to jet the pilings into place @ approx. 8 ft. depth. The pilings are approx. 8 in. diameter and would extend to approx. 2 ft. above pier deck elevation. The only exception would be the pilings for a roofed slip. Once the pilings are installed, the beams would be placed on top of the pilings, and secured using 5/8 in. hex bolts into the mounting bracket provided by the manufacturer_ Once the beams are installed, the lower bunk beams are installed using manufacturer provided cable, and table clamps. Once the bunk beams are installed, the bunk itself is installed using manufacturer provided brackets and bolts. Once the boat lift is installed, the electrical source is installed. Hardwire option: MAY 0 7 �M Option for hardwire will involve the installation of #4 wire to be run from meter box that will eventually be installed on the house. The wire will be outdoor wire and will be buried underground per Sunset Beach building code (2 ft. depth) using a ditch witch power trencher only to be used outside of the wetlands area. The trench will go to the beginning of the pier where the wire will be run to a panel box which will also serve as a disconnect per Sunset Beach code. From this location, a wire will be ruts in conduit under the pier (no. 8 wire) to the boatlift switch located on the handrail post adjacent to the boat lift slip. All electrical will be installed using licensed electrician and proper per code hardware. Roof over slip and deck construction: Roof over slip and deck construction' section to 13' W x 33' L. The covered boathouse consists of a covered boatlift and a covered gazebo all under one roof. The boat lift slip area being approx. 12 ft. W. by 10 ft. L and the boat lift (slip) is 23 ft. L. by 13 ft. W. The roofed slip would have 8 pilings spaced @ approx. 10 ft. on center. The roof material would be brought in on the pier and installed as follows: Approx. 8 in diameter pilings will be installed approx. 8 ft. depth or to hard shell layer using water pump and associated jetting equipment. Pilings elevation will be approx. 8 ft. above deck elevation. Once pilings are installed, the roof band boards will be installed on the outside of the pilings at the approx. 8 ft. elevation. The band boards will be thru bolted into the pilings using 5/8 galvanized carriage bolts. The band board will be doubled using 2 in by 8 in. treated boards. The rafters will be 2 in. by is in. treated boards and will be installed to a 5/12 pitch using a hip roof style. The hip rafters will be 2 in. by 8 in. treated boards. Collar beams --- 2 in. by 6 in. will be installed from rafter to rafter per code. Total outside to outside measurements will be 14 ft. W. by 22 ft. L_ including overhangs. The rafters will be installed @ 16 in. on center and have 1 in. by 6 in. strapping attached @ 2 ft. on center using screws for tin roofing installation. All rafters will have hurricane straps installed to band boards. The roofing will be tin and installed using washer screws per manufacturer's recommendations (2 per rafter intersection). Tin roofing will be 23 gauge. All lumber for the roofing construction will be pressure treated. Tools to be used: Water pump with hoses and jetting wand. Typical power tools including power saws, drills, etc. Ditch witch trencher for electrical (only with hardwire option) Mg 0 7 ZQZQ QMWMM"Q7QW'tIG RYNA RKIUTIINIW major onsievout pormit Mast revised 12127106) Nonb Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Appiicanti Landowner Informalion Business Name Project Name 0f amicable) Wayne'p$1 I u�o Applicant 1. Fust Name Wayne MI Last flame T)L I ` tJ-0 Applicant 2: First Name MI Last Name Ifadditfanal applicants please attach an adddional pages) w dh names fisted - Mailing Address 260 Queens Cove Rd PO Box City Mooresville State INC 7tP 28117 Country USA Phone No. 704 - 307 - 5343 ext. FAX No. - - Street Address (if different lrmm above) City State ZIP Email wjdeltuto@gmail.com 2. AgenWontractorinformation Business flame Maritime Coastal Construction LLC. Agent/ Contractor 1- First Name Ml Last Name Sill F Thomas Agentl Contractor 2 First Name MI Last Name Mailing Address PO Box City State 630 Milislough Ln Sunset Beach NC ZIP Phone No. t Phone No. 2 284fi8 910 - 842 - 3625 exL 910 - 880 -1921 ext_ FAX No_ Contractor# 910 575 8222 Street Address (if drffcrenf fram above) City State ZIP J F_mas� biit@maribmeeGastalmnstruction.com <Form condrKm an MAY 0 7 2020 I I x, ���•s��-�s�$ ., �-$a8-a�caks"r' ,. ,rrvcr.v.ssc-a:���ialrR�abre� � e.��t Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 9241 Peakwood Dr. Subdivision Name City State zip Sunset Beach NC 28458 - Phone No. Lot No.(s) (if many, attach additionai page with fist) 704 - 307 - 5343 ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Lumber AIWW c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural [gManmade ❑Unknown AIWW e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within_ Sunset Beach 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sgJI.) 124 30,927.6 c. Size of individual lot(s) d. Approximate elevation of tract above NHVV (normal high water) or 71 acres, NWL (normal water level) (if many lot sizes, please attach additional page with a list) 16' above ®NHVV or ❑NWL e. Vegetation on tract new grass and old trees etc., coastal wetland fringe, f. Man-made features and uses now on tract New house being built on tract. g, Identify and describe the existing land uses adiacent to the proposed project site. Residential single-family homes and lots used for single family residences. h. Now does local government zone the tract? 1. Is the proposed project consistent with the applicable zoning? R-1 single family residential (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of An urban water€ront redevelopment proposal? ©Yes MNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes MNo ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? ED <Fonn continues on next pa,ge> FGEN MAY 0 7 N2.0 252-806-21108 ;: 1w888.4kC ?A5i raevzuv.taa cuast�€irraeiaye�41�YRWjJ:M1NGiONtNO Form DCM MP-1 (Page 3 of4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ❑No (n) Are there coastal wetlands on the site? ®Yes []No (iii) If yes to either 0) or (ii) above, has a delineation been conducted? []Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. none, however home is being built on lot which will have septic system installed o. Describe existing drinking water supply source. Brunswick County water p. Describe existing storm water management or treatment systems. none. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubticlGovemment ® private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. boating, fishing and view enjoyment and dockage. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Pilings will be installed using waterjet pump system with 2 in. gas powered water pump and 2 112 in. hoses. Standard electrical power tools will be used for construction of pier and dock. Equipment stored on site in enclosed trailer_ d. List all development activities you propose. Build pier, dock, and install boathouse with boat lift. e. Are the proposed activities maintenance of an existing project, new work, or both? new work f. What is the approximate total disturbed land area resulting from the proposed project? 0 ®Sq_Ft or ❑Acres U. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the stale. none L Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. SCEIVED 4j=A1171 continues on �3aClC> MAY 0 7 20io a�rvawe�c���etatrr��ua4{lYtsiffitkKaTONf No Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development hermit S. Additional Information In addition to this completed application form, (ARP 1) the following items below, it applicable, must be submitted in order for the application package to be complete. Items (a) — fO are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. is any portion already complete2 if previously authorized work, clearly indicate on maps, plats, drawings to distinguish between worts completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent walerfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Dean Spathoit Phone No. 910-579-9817 Address 9229 Peakwood Dr. Sunset Beach, NC 28468 Name Chris Bryant Phone No. 336-375-8277 Address 5610 Hicone Rd. Gibsonville, NC 27249 Name Phone No. Address g. A list of previous state or federal permits issued for worst on the project tract. include permit numbers, permittee, and issuing dates. none known h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas_ (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (WC.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of publir lands, attach a statement documenting compliance with the North Carolina F-r Aronmental Policy Act 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the condiiinns and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 5106120 � Print Name Wayne Deltufo L //, / s Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ODCM MP-5 Bridges and Culverts IECF—INED pDCM MP-3 Upland Development ODCM MP-4 Structures Information MAY Q 7 10t 1p(;t,A \%MINOT4N, "0 .. 9-88$-41RC63.Aas :. av:r.nccc���1�r3..�aas�era�crri.,rr# Form DCM MP-4 (Construction within Public 't'li` st Areas) Attach this fofm to Joint Application for CAMA Major Permit, Form DCM MP-1, Be sure to complete all other sections of the .Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITYIMAR1NA CHARACTEMSTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government SPrivate/Community c. (1) Dock(s) and/or pier(s) (Ill Number 1 (ii) Length pier: 501: (iv) Width 6 ft. (y) Floating ❑Yes UNo e. (i) Are Platforms included? ®Yes ❑No If yes: (ii) Number 2 (iii) Length 6, 10 "(under boathouse root) (iv) Width 8, 12 "(under boathouse roof) (v) Floating ®Yes ®No Note- Roofed areas are calculated from dripfine dimensions. g. (i) Number of slips proposed 2 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel 1J9pen water; dredging for basin and/or channel ®open water; no dredging required ❑Other; please describe: k. Typical boat length: 20 - 24 ft. m. (i) Will the facility have tie pilings? []Yes ®No (ii) if yes number of tie pilings? []This section not applicable b. [) Wiil the facility be open to the general public? []Yes ® No d. (i) Are Finger Piers included? OYes ❑No If yes: (ii) Number 1 (iii) Length 8' (iv) Width 6' (v) Floating ❑Yes ®Na f. (i) Are Boatlifts included? NYes ❑No If yes; (ii) Number 1 (iii) Length 13 ft. "sunder boathouse roof)' (iv) Width 13 ft "(under boathouse roofY'. h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dmkage, fuel, and marine supplies 0 Dockage ("wet slips'only, number of slips: 2 ❑ Dry storage; number of boats: D Boat ramp(s); number of boat ramps: ❑ tither, please describe: j. Describe the typical moats to he served (e.g.. open runabout, charter boats, sail boats, mixed types), ayA 20 - 24 ft. sports fishing boats I (i) Will the facility be open to the general public? ❑Yes ®No isCEIVED MAY 0 7 VZO ovA Vl ivAINCTQN, NC 2552-8(W-28(a ;., -f-"8-4ft vA$-f n wyvwr .rna ccvise& 1217-71afi Form D04 P-4 (Str€itemres, Page 2 of 4) L2. DOCKING FACILPTYAWARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary Facilities that will be included in the proposed project. © Office Toilets D Toilets for patrons; Number: nla; location: ftla © Showers (l Boatholding tank pumpout; Give type and location: n/a b. Describe treatment type and disposal location for all sanitary wastewater_ n/a C. Describe the disposal of solid waste, fish offal and trash. not allowed d. How will overboard discharge of sewage from boats be controlled? Not allowed. e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. n/a f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. not allowed g, Where will residue from vessel maintenance be disposed of? not allowed h. Give the number of channel markers and "No wake" signs proposed. n/a i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality n/a j. What will be the marina policy on overnight and live -aboard dockage? not allowed k. Describe design measures that promote boat basin flushing? n/a if this project is an expansion of an existing marina, what types of services are currently provided? n/a r r-jVEQ F` rn. Is the marina/docking facility proposed within a primary or secondary nursery area? MAY Q 7 ZON ❑Yes ENo 4�1 : i-8 ftCQA, #` w ent.flet remizeti. °t 27*6 Form DCM MP-4 (Structvirets, Page 3 of 4) n. Is the marinaidoc€cing facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. is the marinaidocking facility proposed within or adjacent to coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑S8 OWL ❑None p. is the proposed marina/docking facility 3ocated within or within close proximity to any shellfish leases? ❑Yes ❑ No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (inciuding covered lilts) 0 This section not applicable Is the boathouse structure(s): ❑Commercial ❑PubliclGovernment ®Private/Community (i) Number I (iii) Length 33 (iv) Width 13 Note. Roofed areas are calculated from dripfine dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock grain, use MP--2, Excavation and Fill.) RThis section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands 16. MOORING FILINGS and BUOYS OThis section not applicable a. Is the structure(s): ❑Commercial ❑PubhclGovernment ❑PrivatelCommunity 0. Distance to be placed beyond shoreline !Vote: This should be measured from marsh edge, if present. e. Arc of the swing i. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc,) MAY 0 7 ZOZO 2-:;;4-8£r8-280'8 :: 1-899-4RC+FAST a: revised-, 12127 Form OCM MP-4 (Structurras, Page 4 of 4) at. Proximity of structure(s) to adjacent riparian property lines East side approx_ 47It West side approx. 25 ft. Note. For buoy or mooring piling, use are of saving including length of vessel. c. Width of water body approx.. 618 ft. e. () Will navigational aids be required as a result of the project? OYes ONo ®NA (ii) If yes, explain what type and hove they will be implemented. b. Proximity of structures) to adjacent docking facilities. East side approx. 62 ft. West side approx. 47 ft, d. Water depth at waterward end of structure at NLW or NWL approx. 2.5 ft. @_ NLW [�70THER ©This section not applicable a_ Give complete description: Construct docking facilities to serve property owners at 9241 Peakwood Dr. Sunset Beach, NC 28468 5/06120 Bate Wayne Deitufo Pier Project Name Bill Thomas Applicant Na e Applicant Signature RECEIVED MAY Q 7 Z020 VQM VVIVAIh►Q4TQN, N �:i:.'•is4sSt �84A : 1-5�-��a:�asi�'i` .. °= r_�r.��sasas€alraaeaa�,ae�.a�et r�e�ri�;a ��t�7' 4& NORTH CAROUNA Environmenrai Ouaht. ' May 22, 2020 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Major Public Notice in Brunswick County Wayne Del Tufo ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division of Coastal Management Hello Angie: Please publish the attached Notice in the Wednesday, May 27, 2020 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Tanya Pietila at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Jarimy Springer. Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. S' erely, anya K. ietila Permitting Support & Customer Assistance cc: MHC — Curt Weychert WIRO File USACE State of North Carolina 1 Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT . The Department of Environmental Quality hereby gives public notice as required by NCGS 113A- 119(b) that the following application was submitted for a development permit in an Area of Environmental Concern as designated under the CAMA: On May 8, 2020, Wayne Del Tufo proposed to construct a new private docking facility with boathouse and two (2) slips at 9241 Peakwood Dr. SW, adjacent to the AIWW, in Sunset Beach, Brunswick County. A copy of the application can be examined or copied at the office of Brendan Brock, N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910- 796- 72 70) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to June 17, 2020 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S. REGAN May 18, 2020 Secretary BRAXTON C. DAVIS Director SENT VIA EMAIL Maritime Coastal Construction LLC c/o Mr. William Thomas 630 Millslough Ln Sunset Beach, NC 28468 SENT VIA EMAIL RE: CAMA Major Development Permit Application - Del Tufo Private Docking Facility Dear W. Thomas: The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for Mr. Wayne Del Tudo, for State approval for the construction of a (2) two slip docking facility and boathouse located at 9241 Peakwood Drive SW, Sunset Beach, Brunswick County, NC. It was received complete on May 8', 2020 and appears to be adequate for processing at this time. The projected deadline for making a decision is July 22a`, 2020. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from May 8 h, 2020 you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, e,� ),3-� Brendan Brock Field Representative cc: Curt Weychert, MHC Stanley Dills, LPO WIRO DCM USACE Robb Mairs, DWR Wayne Del Tufo, Applicant North Carolina Department of Environmental Quality f Division of Coastal Management wilmington Office 1 127 Cardinal Drive Extension l Wilmington, North Carolina 28405 410.798.7215 Ir. w EL Q Q LL 0 . 14U W■ 3 0 Cc 41 1 0 • W n W CU r Q Ci) z . w 2 if 2 0 J w �m VCL W z� OLL VQ J— a � LLJ W o CL wJ �a 0" �o �w o= LL�- ■ c 0 V N c 0 v H N > o E 0 d E •N C � r _. Tl .. AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit:2 Mailing Address: Phone Number: �9'` Email Address:4i 1 certify that I have authorized Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: ,h, �/-./a 1le/a plet; dc'�'lL at my property located at in �lGWrC County. 1 furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the ,Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: Signatures' / / Print or Type Name Tine This certification is valid through_I o2(-�/ F=EIVED MAY 0 4 i0gM )jVII.MINGTON, N"C Maritime Coastal Construction 630 Millslough Ln Sunset Beach NC 28468 Tel: 910-880-1921 Email: bill@maritimecoastalconstruction.com Website: Ma.ritimecoastalconstruction.com Bill Thomas Maritime Coastal Construction 630 Millslough Ln Sunset Beach NC 28468 Dear Chris, Your new neighbor, Wayne Deltufo, is applying for a CAMA Major permit to build a pier, boat house, and floating dock located at 9241 Peakwood Dr. Sunset Beach, NC in Brunswick County, NC. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to aforementioned project, i am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Tara Macpherson, Wilmington District Manager at 127 Cardinal Dr. Ext. Wilmington, NC 28405 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection_ If you have any questions on this project, please call me at 910-880-1921, or email me at bill@maritimecoastalconstruction.com. Sincerely, Bill Thomas Maritime Coastal Construction VIV 'CelveD MAC 0423 OG ,or WI{ MIN T©1'1i {� Maritime Coastal Construction 630 Millslough Ln Sunset Beach NC 28468 Tel: 910-880-1921 Email: bi�maritimecoastalconstruction_com Website: Maritimecoastalconstruction.com Bill Thomas Maritime Coastal Construction 630 Millslough Ln Sunset Beach NC 28468 Dear Dean, Your new neighbor, Wayne Deltufo, is applying for a CAMA Major permit to build a pier, boat house, and floating dock located at 9241 Peakwood Dr. Sunset Beach, NC in Brunswick County, NC. The specifics of the proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to this proposal, please send your written comments to Tara Macpherson, Wilmington District Manager at 127 Cardinal Dr. Ext_ Wilmington, NC 28405 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 910-880-1921, or email me at bill@maritimecoastalconstruction.com. Sin rely, Bill Thomas Maritime Coastal Construction FIF-COVED W11.M119GTONi t4C ■ Complete items 1, 2, and 3. ! Print your name and address on the reverse so that we can return the card to you. 9 Attach this card to the back of ft rlraiipiece, or on the trout if space ri,�rrnits_ 1. Article Addressed i_ 6d —4, AI& 2-411 d ;5� A. Signature x '?5- j IZ CJ� � B. Ft5�Yfpont G,f3et D. Is delivery address different from item 1? 0 Yes T� If YES, enter delivery address below: i] No Service Type 3 Priorrty rprt3ss�r do E f] iJ Adult Slgnaitrre d Regcstered Maela" © Adult Signature Restricted Delivery Q Registered Meil Restricted 959 94{32 5931 1 44g 2897 29 0 Certirre MWO Delivery {l Certified Mal Restricted Delivery p Mrrn i'ieceipt for D Collect an Delivery Merchandise 2. Article Number {iran4far fr= ser*e !abet) D Collect on Delivery Festrictsd Derrvary I7 Signature Contirmatdon- Ensured Mal ❑ Signature uvrriirmat on �7 r7 3 r7 r� p r� i'1 F7 �E ^7 ] (112 0 0© J l! 11 ©LJ 545 5 ^0 tail Restricted DBdvery 4 5 4 Restricted Delivery .. — y 7 f PS Form 381 , .fuEy 2Q f fl17-000�058 Domestic Return Receipt ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ® Attach this card to the back of the maifpleee, or on the from V space permits. 1. Article Addressed to: if 4Ai S 5Y A9 1=1-r c A t� AW �A . A)C 17,2- A. Signature Kf-wY S. Received by {Printed Name) C. Ditte of I D_ Is delivery address different from item f? if YES, enter delivery address below: © No :3 Service Type 0 AdWt Sigrtaiuse Restncted Delivery 9 9402 2 931 OC3 `3 213 12 0 Cereed rviam t;3 Gertieed 1024 Resbkw Balivery Cnllec, on Delivery 2 ' " Ir--5pr from sgrvjm fbej) 13 Collect or Ve%wy Restricted Delivery 57AR.estricleti ,,very PS Form 3811, MY 2415 RSN 753"2dtfli3-91353 R` kAy .( 7 G Priority Mal EzpaesSe ❑ Registered Mail- 0 Registared Mail Restricted Delivery ❑ Return Receipt for Merchandise t7 signahve Cantim wtion- ❑ Signature Confirmation Restricted WEvery Domestic Return Receipt pqM YVJI M)NG?TQN, NO jjjjjjjjjlmjj�ijjjjjj1j 111111 9590 9402 5931 0049 2697 29 United States ' Sender_ please Prmt your rr m. address. and ZIP Postal Service Frst C#Iss Mall Postage $ Fees Paid LISPS Permit N G-f l7 in this - --' First -Class Mail Postage & Fees Paid USPS Permit No. G-10 9590 9402 5931 UB49 2897 12 United Stag Postal Service lender: Please print your name, address, and ZIP+4® in this box*: ,1,i11,1.,1.,1III31..;.1.1-I"t111'tflvI?IiIIli11'IT 1.1.1, 41.1, RECEDE MAY 0 7 NZO QQM YVIl MINPTQN, NO 0 71 0 ram" jl� V li of - Atj It IN RK4 owl" ma.W. Lik all A4 �j AT Jj KI foo It. Imp AA fig Ilk A7 to 77—Q, 4W, lot M At 5/18/2020 Mail - Brock, Brendan O - Outlook RE: Adjusting water depths in PNA Weychert, Curtis R <curt.weychert@ncdenr.gov> Thu 5/14/202011:55 AM To: Brock Brendan Q <brenclan.brock@ncclencgov> Brendan, the tidal predictions were almost spot on with the preliminary data collected by the buoys, likely because we've had such mellow winds the last few days. I would say that as long as you were there relatively close to the slack low tide, just subtract the 0.4' from your measurements and that is as close to a true MLW water level. •w�c .iooJ+u .raer _eves ,r ss:oa :, =�.�..c eeau. w.. ...;.. .. - -. lt11fA11055i^WS __- :]at,m 4\Mr�e�ELw�eFNdS/c1 wnF +vr drxF. Ni iAE IW i r -- ArV2biiC GYf ro.kl)G•X 1J ]i1+C�1S nww.. wI s r¢m .lxm I it - �� '31r1lM MM SPR+ s1St ern SEW mu — 1 . • _.. -. — Ywil6M—hMewr. Hca<x Rcs b iL�r. Levis S�sFOTi Spnrrgna�Ptr SC �_ Fxnx Sia�frs - 010AIrF10StOaPS _ Grtas 6Rvw+Rlr+.e��a•��R F� x fM[LIY� iwm]OJGOliII00.000M1 M]I140Sti lkRan _"� N11REY \A� 3 NA\ � NSl 3lrl S MlW MRRS 171 — �wWaadn — Val—Aslm.NVY Curtis Weychert Assistant Major Permit Coordinator North Carolina Division of Coastal Management North Carolina Department of Environmental Quality 252-808-2808 x211 Cu rt. W eychert@ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 From: Brock, Brendan 0 <hrendan.hrock@ncdencgov> Sent -Thursday, May 14, 2020 10:32 AM To: Weychert, Curtis R <curt.weychert@ncdenr.gov> Subject: Adjusting water depths in PNA Hey Curt, I know you provided some help with water depth adjustments a while back but I am working on a major at 9241 Peakwood Dr. Sunset Reach. Its a PNA and the applicant is looking to exceed the pier head line but NOT the 1/4 width. I went out to verity his depths yesterday. I got -2.4' NLW at the waterward end of the proposed floating dock (Applicant got -2' 6" NLW) and -1.9' NLW at the landward end of the proposed boatlift/floating dock (Applicant got -2.0' NLW). Sunset Beach Bridge tidal gauge on 5/13 had low tide at 8:08am at .4' above average. I took measurements at 9:45am. Just wanted to get your expertise to adjust the numbers since you may be more familiar with the area and the tidal lag. It's going to be very close to meeting our water depths and it's in a PNA so no pressure! Naha I have attached the proposed survey with the applicants water depths and I added my depths on there for reference. https:lloutlook.office365.com/mail/inboxlid/AAQkADVjMzg3NTMyLTIIMTMtNGM5Yyl hNzQ4LThiOWM2NWZhNjc5YwAQAG86gotb%2BOROp6%2Fxu... 112 5/18/2020 Brendan Brock Field Representative NC Div7sion of Coastal Management Department of Environmental Quality 910 796-7270 office brendan.brock@ncdenr.gov 127 Cardinal Drive Ext Wilmington, NC 28405 --^� Nothing Compares. Mai[ - Brock, Brendan O - Outlook IL .! sic . i i i E "JAtq+ff dep 4 -2.4' N�W Obgd,'1=rom1,oe o�'}4lWW 0-'edge chuxnrt'; httpsaloutlook.office365,cam/maiIli nboxlid/AAQkADVjMzg3NTMyLTIIMTMtNGM5Yy1 h NzQ4LThiOWM2 NWZhNjc5YwAQAG869otb%2BOROp6%2Fxu... 212 Legend NHS NL\A( CW5 pr-Qpo-sej Doc'Kino Wayne, Op-)fupo Gunset,8e=� YC april ao �:OXY f�-e ared by: &N-11,0mas 670151"J3"M 5atuet&a� �NC a?%� T lqll\ mat,4q,w�, m cannel Wtd4-� 619\ Ma -PO 6m,55 tv MarsA 6,rtt.S�s 10 q-56 \ Qj Cl) t>,,J- � cl 07g d- cy-U) ai2� Wak - is v '' Kv Y r RO-mp S o p it'.� El qaql peaK\dQcJ'9p SWIS&OP—CICh / M, I Poo . IT' 6 AS CO 0 Pli I 7-01 C, 17 cola Ni'Ic aller Lh=6 OTTO 4 $�� �`4�. ?twa= a ccs pier f i do r- )10170-41 LOW DO- � der v_ _Sjo� T�yllTo, }Ili I RAILW � q—q7\ rl�31 wq pjqi�-crrrf — " +f�d4ep4tNLW k N% i on Scq bc[cK T-:pg m L o c o F Al W W 0,,e-d3e- Cho-i) v al DZLDZ L .0 M A n,,, hUAMMU M.Ay 0 7 2020 <4 Cd' [Lu.! CIIL Lu NORTH CAROLINA Environmental Quality May 22, 2020 MEMORANDUM: FROM: Curt Weychert, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) curt.weychert(o-)NCDENR.gov SUBJECT: CAMA Applicant: Wayne Del Tufo ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director, Division of Coastal Management Project Location: 9241 Peakwood Dr. SW, adjacent to the AIWW, in Sunset Beach, Brunswick County Proposed Project: Proposal to construct a private docking facility with a covered boathouse, boat lift and one slip, for a total of two (2) slips. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Curt Wevchert at the address above by June 17, 2020. If you have any questions regarding the proposed project, contact Brendan Brock at (910) 796-7270 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME AGENCY SIGNATURE DATE State ofNorth Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215 This Ce:ti.i that'M--je are no delln(juerlt ad valorem taxes, tees, assessments or other I",t9 which the Brunswick County Tax r.ollector is charged with collecting, that are a lien on: Panel Number_ ',LSS M 245p1 as notated by the Brunswick County Assessor's office. The is not a certification Mat the parcel number matches the deed description. {{�� ItlU��U oate (Asst) Tax Co(. ! Del. Tax Spec. IIIIIII�I IIIII11111�IIIIIIIIIIIIIIIII gSI?0441 m ons ;P BrunswiCk County, NC Register of Deeds page 1 of 3 Brenda M. Clemmons Register of Deeds 11-15-2019 12:52;45.002 Brunswick County, NC NC REVENUE STAMP: $978.00 (aE59872) F : r Revenue Stamps: W8.00 Parcel No. 2550002501 This Instrument prepared by: The Webster Law Firm, PC. Delinquent tomes, if any, to be paid by the closing attorney to the county tax collector upon disbursement of closing proceeds. Brief Description: Tract containing 115 feet of road frontage identified as "Mark H. Skelly" on survey plat recorded in Map Cabinet Y at Page 107, and 1.04 acres Tract shown on the survey recorded in Book 4268, Page 138, Brunswick County Registry. NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED, made this t-ZA day of November, 2019, by and between GRANTOR WILLIAM W. BRADFORD and wife, MARGARET SUSAN BRADFORD P.O. Box 7673 Ocean Isle Beach, NC 28469 GRANTEE WAYNE J. DEL TUFO and wife, ANNE G. DEL TUFO 260 Queens Core Road Mooresville, NC 28117 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WiTNESSETH: The Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, subject to the reservations and restrictions hereinafter stated, all that certain lot or parcel of land situated in Shallotte Township, Brunswick County, North Carolina, and more particularly described as follows: BEING all of that certain tract or parcel containing 115 feet of road frontage identified as ,,Mark H. Skelly" in a survey plat dated 23 October 1993, prepared by .Ian K. Dale, R.L.S., and recorded in Map Cabinet Y at Page 107 in the Office of the Register of Deeds for Brunswick County, North Carolina, to which plat reference is hereby made and which is incorporated herein for greater certainty of description of said property. 1 mg 0 4 nzo 0CM WlLMJNGTON, NC IIIllllll lll111I1r1lI1lllllllllllllll g41 P�� 2:-45 002 Brunswick County, NC pe9later of Deeds mmons PROF pares 2 of 3 Together with all of Grantors right, title and interest in that certain lot or parcel of land containing 1.04 Acres, 45,145 Sq. Ft, as shown and described on the survey by Christopher D. Stanley, P.L.S., of East Coast Engineering and Surveying P.C. dated July 9, 2019, a copy of which is recorded in Book 4268, Page 138 of the Brunswick County Registry and incorporated herein by reference. For back reference see Book 1304, Page 143, Book 4268, Page 134 of the Brunswick County Registry. The above described lot or parcel of land is also known and identified as Brunswick County Tax Parcel No. 2550002501. Pursuant to N.C.G.S. Section 105-317.2, the mailing address of the Grantor and Grantee are stated above. The property conveyed hereby does not include the primary residence of the Grantor. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple, subject to the reservations and restrictions set out herein. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, except for the exceptions herein stated. Title to the property hereinabove described is subject to the applicable restrictions, easements and rights -of -way of record, applicable zoning and land use laws, ordinances and regulations and ad valorem taxes for current and subsequent years. IN WITNESS WHEREOF, the Grantor has hereunto set his or her hand and seal on the day and year first above written. (SEAL) William W. dford SEAL} Margaref Susan Bradford [NOTARY ACKNOWIIF,DGEMENT ON NEXT PAGE] RECEIVED ED MAY 0 4 2020 OCM yVJLt I1NQT0N, NC �llllll1l11111111111i1l1l1�11llll�llzrs ��¢� 1 Brunswick County, Nz:�z-461002C Ragagter of Leeds paQ of PROP STATE OF NORTH CAROLINA COUNTY OF BRUNSWTCK I, a Notary Public of the State aforesaid, do hereby certify that William W. Bradford, the principal, personally appeared before me this day, and (i) I have personal knowledge of the identity of the principal, or (ii) I have seen satisfactory evidence of his identity, by current State or Federal identification with his photograph thereon in the form of a WIN— - , and that the principal acknowledged to me that he voluntarily signed the foregoing document for the purpose therein and in the capacity indicated. Witness my hand and official stamp or seal, this the / day of November 2019. G G3-a7 w nooks otary Public Lv .� L �Q 11 Cri ntLa Y Notary Printed or typed name (Seal) My Commission Expires: STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK 1, a Notary Public of the State aforesaid, do hereby certify that Margaret Susan Bradford, the principals, personally appeared before me this day, and (i)1 have personal knowledge of the identity of the principal, or (ii) I have seen satisfactory evidence of her identity, by current State or Federal identification with her photograph thereon in the form of a AJCZIC , and that the principal acknowledged to me that she voluntarily signed the foregoing document for the purpose therein and in the capacity indicated. h Witness my hand and otTicial stamp or seal, this the // 2*day of November 2019. Notary Public Sandra W Roolo Notary Publlo �Q�}d to Wcx 00Armm Caur3 � Notary Printed or typed name Y Commisslat E rea 28 z fig( (Seal) My Commission Expires: 3 MAC p 4 ZGZD 0CM W1I-MmaTCN, NC Major Permit Fee Schedule Project Name:-bR County: Check No & Amoun* -3 i s Development Type Fee DCM % DWQ % (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or $250 100° ($($250 0% ($0) excavation of any wetlands or open water areas: II- Public or commercial development that does not involve the filling or excavation $400 100% ($400) 0% ($0) of any wetlands or open water areas' III. For development that involves the filling andlor excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies III(A). Private, non-commercial development, if General Water Quality $250 100% ($250) 0% ($0) Certification No 4175 can be applied III(B) _ Pubic or commercial development, if General Water Quality Certification $400 100% ($400) 0% ($0) No. 4175 can be applied: III(C). If General Water Quality Certification No 4175 could be applied, but DCM staff determined that additional $400 60% ($240) 40% ($160) review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality $400 60% ($240) 40% ($160) Certification No- 4175 cannot oe applied: IV. Development that involves the filling and/or excavation of more than one acre $475 60% ($285) 40% ($190) of wetlands andlor open water areas-