Loading...
HomeMy WebLinkAboutNC0026565_Pretreatment Complaince Inspection for Asheboro_20190521ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Michele Dawes City of Asheboro P.O. Box 1106 Asheboro, NC 27204 NORTH CAROLINA Environmental Quality May 21, 2019 SUBJECT: Pretreatment Compliance Inspection (PCI) City of Asheboro NPDES# NCO026123 Randolph County Dear Ms. Dawes: On April 23, 2019 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office, Division of Water Resources. Ms. Michelle Dawes, Technical Services Manager for the City of Asheboro, and Sara Laughlin, Technical Services Specialist for the City of Asheboro, were present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 9 MGD permitted facility. The City has sixteen (16) Significant Industrial Users (SIUs), seven (7) of which are categorical. The publicly owned treatment works (POTW) has not had any limits violations since the last pretreatment compliance inspection. POTW Interview There are no plant problems related to pretreatment issues and there are no NPDES permit limit or monitoring violations recorded from March 2018 through February 2019. The facility is very well operated. One facility Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on March 23, 2017. The HWA was approved on June 30, 2017. The next HWA is due on June 1, 2022. The last Industrial Waste Survey (IWS) was submitted on April 12, 2018. This IWS was approved on May 8, 2018. The next IWS is due on April 15, 2023. The Sewer Use Ordinance (SUO) was approved on November 5, 2012. D E Q�p North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 NORTH CAROLINA o•o•°"•mme""­WMMKV /� 336.776.9800 The Enforcement Response Plan (ERP) was approved on August 12, 2013. The Long Term Monitoring Plan (LTMP) was approved on February 1, 2019. LTMP File Review The Long Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the file for Covanta (#5049) revealed that the monitoring data was well organized and compliant. A review of the file for Georgia Pacific (#2026) revealed that the monitoring data was well organized and compliant. A review of the file for StarPet, Inc. (#2228) revealed that the monitoring data was well organized and compliant. The slug control plan for Covanta (#5049) was in good order. The slug control plan for Georgia Pacific (#2026) was in good order. The slug control plan for StarPet, Inc. (#2228) was in good order. Action Items No other action items were noted. The pretreatment compliance inspection is considered satisfactory. Ms. Dawes conducts an excellent pretreatment program. If you have any questions, please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, EDocu Siiggned by: %�. 145B49E225C94EA... Lon T. Snider Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: PERCS Unit — Monti Hassan Central Files WSRO Files