HomeMy WebLinkAboutNC0021474_Inspection Report for PCI_20190909ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
Amy Varinoski
Compliance Manager
City of Mebane
106 East Washington Street
Mebane, North Carolina 27302
NORTH CAROLINA
Environmental Quality
September 9, 2019
SUBJECT: Pretreatment Compliance Inspection (PCI)
City of Mebane
NPDES# NCO021474
Alamance County
Dear Ms. Varinoski:
On July 25, 2019 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski and
Michael Meilinger of the Winston-Salem Regional Office. Ms. Amy Varinoski was present for the
inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment
program, which includes reviewing the files, POTW plant performance, industry monitoring data, and
adherence to the enforcement response plan (ERP).
Background
This is a 2.5 MGD permitted facility. The City has five (5) Significant Industrial Users (SlUs), three (3) of
which are categorical. The publicly owned treatment works (POTW) had exceedances of BOD and
ammonia in 2018 due to hydraulic issues caused by the weather (heavy rain and cold temperatures) and an
exceedance of toxicity, possibly due to a clarifier coating.
POTW Interview
There are no plant problems related to pretreatment issues and, other than BOD, Ammonia, and Toxicity,
there are no NPDES permit limit or monitoring violations recorded from January 2018 through December
2018. The facility is very well operated.
Pretreatment Program Elements Review
The Headworks Analysis (HWA) renewal was submitted on March 24, 2016. The HWA was approved on
June 3, 2016. The next HWA is due on March 31, 2021.
The last Industrial Waste Survey (IWS) was submitted on January 4, 2016. The IWS was approved on
March 7, 2016. The next IWS is due on December 1, 2020.
OepMrnt al EnNrvmm�nLl Over
T North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27103
336.776.9800
The Sewer Use Ordinance (SUO) was approved on December 10, 2012.
The Enforcement Response Plan (ERP) was approved on April 11, 2013.
The Long Term Monitoring Plan (LTMP) was approved on July 18, 2019.
LTMP File Review
The Long Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies.
Industrial User Permit (IUP) File Review
A review of the file for PPG Coating Services (#0133) revealed that the monitoring data was well organized
and compliant.
A review of the file for Synergy Health. (#0126) revealed that the monitoring data was well organized and
compliant.
A review of the file for Liggett (#0132) revealed that the monitoring data was well organized and compliant.
The slug control plan for PPG Coating Services (#0133) was in good order.
The slug control plan for Synergy Health. (#0126) was in good order.
The slug control plan for Liggett (#0132) was in good order.
Action Items
No other action items were noted.
The pretreatment program is considered satisfactory. Ms. Varinoski runs an excellent pretreatment program.
If you have any questions please contact Jim Gonsiewski or me at (336) 776-9800.
Sincerely,
DocuSiiggned by:
1-"49E225C94EA...
Lon T. Snider
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ — WSRO
cc: PERCS Unit — Monti Hassan
Central Files
WSRO Files