Loading...
HomeMy WebLinkAboutNC0023868_Pretreatment Compliance Inspection_20190731ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Mr. Robert C. Patterson, Jr., P.E. Water Resources Director City of Burlington P.O. Box 1358 Burlington, North Carolina 27216 NORTH CAROLINA Environmental Quality July 31, 2019 SUBJECT: Pretreatment Compliance Inspection (PCI) City of Burlington NPDES# NC0023876/South WWTP & NC0023868/East WWTP Alamance County Dear Mr. Patterson: On July 2, 2019 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Ms. Kristy King was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, including industrial monitoring data, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background The City has fifteen (15) Significant Industrial Users (SIUs), two (2) of which are categorical. Both treatment plants are permitted for 12 MGD. One (1) SlU (Copland Industries) closed in January 2019. POTW Interview There are no plant problems related to pretreatment. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on November 16, 2015. The HWA was approved on February 2, 2016. The next HWA is due on April 1, 2020. The last Industrial Waste Survey (lWS) was submitted on August 2, 2016. The IWS was approved on September 19, 2016. The next IWS is due on July 2, 2021. The Sewer Use Ordinance (SUO) was approved on March 1, 2013. The Enforcement Response Plan (ERP) was approved on October 3, 2008. The Long Term Monitoring Plan (LTMP) was approved on January 27, 2006. D E Q�p North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 NORTH CAROLINA o•o•°"•mme""­WMMRV /� 336.776.9800 LTMP File Review The Long Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review None of the fifteen (15) SIUs were in significant noncompliance (SNC) in 2018. A review of the file for Engineered Controls (#0019) revealed that the monitoring data was well organized and compliant. A review of the file for Carolina Biological Supply (#0065) revealed that the monitoring data was well organized and compliant. A review of the file for Graham Dye & Finishing (#0015) revealed that the monitoring data was well organized and compliant. The slug control plan for Engineered Controls (#0019) was in good order. The slug control plan for Carolina Biological Supply (#0065) was in good order. The slug control plan for Graham Dye & Finishing (#0015) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Ms. King continues to maintain an effective pretreatment program. If you have any questions please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, DocuSiiggned by: �IM l I>MJCr 1-"49E225C94EA... Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO Enclosure — PCI Report cc: PERCS Unit — Vivien Zhong Kristy King — City of Burlington Central Files WSRO Files