HomeMy WebLinkAbout310765_Plan of Action_20200522PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
31-765
County: Duplin
Facility Name: Flagship Farms 1, 2 &3
Certified Operator Name: Joe Szaloky Operator Number:
AWA999328
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lag 1 Lag 2 Lag 3
N N N
17 21 13
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached_ Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
"Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Advantage Farms, LLC Phone:
Facility Owner/Manager (print)
c� 2c1 tx Date:
Facility OwnedManager (signatur )
910-293-5248
5/22/2020
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1.
Structure ID: 4110
line m = 1159.9 lb PAN
2.
Structure ID: 4111
line m = 354.2 lb PAN
3.
Structure ID: 4112
line m = 1312.1 lb PAN
4.
Structure ID:
line m = lb PAN
5.
Structure ID:
line m = lb PAN
6.
Structure ID:
line m = lb PAN
n.lines 1+2+3+4+5+6= 2826.3lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
or-oinn nn nlrw 11QT mini nc Tr) WWIC_ta PAN r-ANNnT RF APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining 1RR-
2 PAN balance
(lblacre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window
T72141
Field 9
Soybeans
30.56
143.19
4375.9
April -Sep 15
Field 10
Soybeans
14.67
143.19
2100.6
April -Sep 15
20
Soybeans
8.74
143.19
1251.5
April -Sep 15
'State current crop ending application date or next crop application Deglnning aate Tor avauacle
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 7728.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 2826.3 Ib. PAN
PoA (30 Day) 2121 /00
x. Crop's remaining PAN balance (line v from section III) = 7728.0 lb. PAN
y. Overall PAN balance (w - x) = -4902 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN basec
on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is ava
for pumping if needed. Remaining PAN is an estimate as grower did not supply me with available PAN.
PoA (30 Day) 2/21100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 14110
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (inches in red zone)
d_ top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c112 x line d x 7.48 gallonslW
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
17.0 inches
19.0 inches
2.0 inches
108900 fe
135762 gallons
180 days
121352 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g 121352 ft3
certified herd #
i. volume of wash water according to structural design
j_ excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4, Total PAN to be land applied during draw down period
I. current waste analysis dated 2/25/2020
m. ((lines e + k)11000) x line i =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
fe
86213 ft3
258764 gallons
2.94 Ibsi1000 gal.
1169.9 lbs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelldentifier (ID): 4111
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c112 x line d x 7.48 gailonsW
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
21.0 inches
19.0 inches
-2 inches
108900 ftz
-135762 gallons
180 days
g. volume of waste produced according to structural design 1213521 ft3
h. current herd # 3672 certified herd #r 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 2125I2020
m. ((lines e + k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121352 ft3
J ft3
86213 ft3
258764 gallons
2.88 Ibs11000 gai.
354.2 lbs. PAN
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): r4112
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 13.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard E19.0 inches
c. line b - line a (inches in red zone) = 6.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 108900 ft2
e. line c112 x line d x 7.48 gallons/W 407286 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 121352 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g = 121352 ft3
certified herd #
i. volume of wash water according to structural design L 0 ft3
j. excess rainfall over evaporation according to designF-7786213 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= i 25�gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2/25/2020 1.97 Ibs11000 gal.
m. ((lines e + k)/1000) x line I = 1312.1 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00