Loading...
HomeMy WebLinkAboutNC0025445_Pretreatment Compliance Inspection Results for Randleman_20200110ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Lisa Osthues Pretreatment Coordinator City of Randleman 168 Nathan Dudley Road Clinton, North Carolina 28328 NORTH CAROLINA Environmental Quality January 21, 2020 SUBJECT: Pretreatment Compliance Inspection (PCI) City of Randleman NPDES# NCO025445 Randolph County Dear Ms. Osthues: On December 17, 2019 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Ms. Lisa Osthues was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 1.745 MGD permitted facility. The Town has one (1) Significant Industrial User (SILT) which is not categorical. The publicly owned treatment works (POTW) has had exceedances of lead. This has been a recurring problem and the Town is actively working to eliminate this constituent. POTW Interview There are no plant problems related to pretreatment issues and, other than lead, there are no NPDES permit limit or monitoring violations recorded from October 2018 through October 2019. The facility is very well operated. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on May 19, 2017. The HWA was approved on August 16, 2017. The next HWA is due on June 1, 2022. Noana caaouivnD � Q�� o.Pa�mwm or �w�mmvi w.i� North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 The last Industrial Waste Survey (IWS) was submitted on March 2, 2018. The IWS was approved on May 25, 2018. The next IWS is due on February 28, 2023. The Sewer Use Ordinance (SUO) was approved on February 4, 2013. The Enforcement Response Plan (ERP) was approved on June 10, 2009. The Short Term Monitoring Plan (STMP) was approved on October 10, 2011. STMP File Review The STMP is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review The SIU was in compliance in 2019. A review of the file for Deep River Dyeing (#0004) revealed that the monitoring data was well organized and compliant. The slug control plan for Deep River Dyeing (#0004) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Ms. Osthues runs an excellent pretreatment program. If you have any questions please contact Jim Gonsiewski or me at (336) 776-9800. Sincerely, DocusiTgnedCby: �IM l t�M�Cr on . nicer Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: PERCS Unit — Vivien Zhong (Electronic Copy)