Loading...
HomeMy WebLinkAboutNCC202170_NOI Signed Certification_20200522NCGO1 Notice of Intent (NOB) Certification Form 7107pff", "I Print this form, complete, scan and upload to the electronic NOI. Then, mail the original form to the NCD8N0StonnwaterProgram (with $100 check if paying by check) at: Division ofEnergy, Mineral & Land Resources StunnwaterProgram 51ZN.Salisbury Street, GmFloor (Office 640N 1612 Mail Service Center Raleigh, 0CI76Q9'16l2 DO NOT MAIL THUS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BEEN REVIEWED AND ACCEPTED AS COMPLETE Per �General Statute 143-215.6B (i),mny person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include ofine not toexceed ten thousand dollars /$2(lO0D/. Under penalty oflaw, | certify that (check all boxes toindicate your agreement: ' |amthe person responsible for the construction activities ofthis project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. $4- The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. } will abide byall conditions nfthe NCGO10000 General Permit and the approved Erosion and Sediment Control Plan. if the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan) ofthe | will nonetheless ensure that all conditions of Part ||ofthe permit are met onthe project atall times. �Z |hemby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner asanindividual permit. Legally Title of Leizallv ResDonsible Person: President *Signature: Date: *Print Name and Title 4signed if AlKorized Individual Differs from Permittee: Phone Number: (919)819-5509 *IMPORTAN7NOTE. This form must be signed byoresponsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Port IV, Section B, Item (6) of the NCGO10000 permit. For more information omsignatory requirements, see Part IV, Section f, Item (6)ofthe N[G0 0000pennit,